Tarek M. Hassan

Prof. Dr. Tarek M. Hassan

orcid

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 June 2021 in Journal of Gender Studies
Verified
Journal Article
Open access
ATAleksandra Thomson
Aleksandra Thomson
RPRachel Palmén
Rachel Palmén
SRSybille Reidl
Sybille Reidl
SBSarah Barnard
Sarah Barnard
SBSarah Beranek
Sarah Beranek
THTarek M. Hassan
Tarek M. Hassan
Higher education and research and innovation in Europe continue to suffer from an indefensible waste of female talent and gender inequality. The European Commission recommends that these organizations adopt gender equality plans (GEPs) and other initiatives for institutional change. However, the levels of readiness, expertise, and experience with such interventions are wide-ranging across institutions and member states, thus collaborative approaches might be particularly valuable. Drawing on the experiences of transnational and multi-institutional communities of practice (CoPs) for gender equality (GE), we illuminate how the CoP approach supported change agents, who leveraged CoP membership to respond to challenges in promoting GE initiatives. Being part of collaborative, co-designed CoPs for learning, knowledge sharing, and institutional change provided external support to the change agents’ activism and allowed them to build legitimacy around GE work. CoP members leveraged this support through learning opportunities, knowledge transfer, sharing practice, political support, and solidarity from the CoP stakeholders. Findings also show that when CoPs were transnational, multi-institutional, and interdisciplinary, their heterogeneity did raise some challenges in relation to the divergence of members’ contexts and geopolitical idiosyncrasies and that this should be considered when designing CoPs which transcend national and institutional boundaries.

30 March 2021 in Infrastructures
Verified
Journal Article
Open access
PDF file
SKSahar Kurwi
Sahar Kurwi
PDPeter Demian
Peter Demian
KBKaren Blay
Karen Blay
THTarek M. Hassan
Tarek M. Hassan
Many of the obstacles to effective delivery of rail projects (in terms of cost, time and quality) can be traced back to poor collaboration across complex design teams and supply chains. As in any infrastructure delivery process, it is important to make decisions collaboratively at an early design stage. Advanced systems such as Building Information Modelling (BIM) and Geographic Information Systems (GIS) can facilitate collaboration during the decision-making process and boost work efficiencies. Such potential benefits are not realised because the roles of BIM and GIS in facilitating collaboration are not clearly understood or articulated. This paper aims to identify and articulate collaboration requirements during the design stage of rail projects. To achieve this, a mixed-method approach was employed to examine the issues that hinder collaboration in rail projects. An online questionnaire was designed to assess the state-of-art in BIM and GIS, followed by fifteen follow-up face to face interviews with experts to identify collaboration issues and suggestions to overcome them. The research identified the main challenges to effective collaboration and provided suggestions to overcome them. The main challenges were managing information and a reluctance to use new collaboration technologies. The main solution which emerged from the data was to develop an original Collaborative Plan of Work (CPW). The developed CPW is tailored to rail projects and has been formulated by combining the RIBA (Royal Institute of British Architects) Plan of Work and the GRIP Stages (Governance for Railway Investment Projects). This comprehensive plan of work, which is uniquely collaboration-focused, is significant because it can be further developed to formulate a precise process model for collaboration during the design process of rail projects. Such a process can (for example) be configured into the workflow prescribed by a Common Data Environment.

31 October 2024 in Buildings
Verified
Journal Article
Open access
PDF file
PDPeter Demian
Peter Demian
THTarek M. Hassan
Tarek M. Hassan
OKOleg Kalmykov
Oleg Kalmykov
IDIvan Demianenko
Ivan Demianenko
RMRoman Makarov
Roman Makarov
As of January 2024, Ukraine has suffered the extensive destruction of over 160,000 buildings, structures, and infrastructure objects due to the shelling resulting from the ongoing war. After the conflict, the country will undergo large-scale reconstruction, following European standards. However, Ukraine’s construction industry remains somewhat outdated, particularly in digital technologies like BIM (Building Information Modeling). Despite this, Ukraine has a growing number of young professionals providing BIM services to international clients. A collaborative study between Loughborough University (UK) and the O.M. Beketov National University of Urban Economy (Ukraine) examined the current state of BIM in Ukraine. The research aimed to develop a strategy for integrating BIM into post-war reconstruction, based on a review of the design and construction sectors. The findings showed that BIM use in Ukraine is driven by international market demands, requiring changes in how BIM is adopted locally. A survey of 234 employees from Ukrainian outsourcing companies and interviews with seven large construction firms in Eastern Ukraine revealed barriers to BIM adoption. These included low wages, a lack of incentives for large firms, bureaucratic inefficiencies, corruption, outdated construction management, and weak regulations. This study provides recommendations to accelerate BIM integration in Ukraine’s construction industry during the post-war rebuilding phase.

30 June 2002 in Automation in Construction
Verified
Journal Article
Closed access
THTarek M. Hassan
Tarek M. Hassan
RMRon McCaffer
Ron McCaffer

7 January 2021 in Journal of Further and Higher Education
Verified
Journal Article
Open access
SBSarah Barnard
Sarah Barnard
ARAnthea Rose
Anthea Rose
ADAndrew Dainty
Andrew Dainty
THTarek M. Hassan
Tarek M. Hassan
The transition of early career researchers into academic posts is understood to be a crucial career step and marks a point at which representation of women declines significantly. The research adopts a participatory qualitative research methodology through career narrative interviews and group discussions with women engineers recently appointed into academic posts. It was found that academic careers are ‘hoped for’, but not described as a straightforward option in terms of either securing tenure or future career development. The collective career paths outlined were rarely linear and featured key moments of crisis and self-doubt, culminating in ‘tentative’ career identity formation in the face of gendered career structures. There is evidence of a pre-emptive and continuing uncertainty about the feasibility of an academic career that begins years before embarking on a PhD. The distinctive contribution of the study is the consideration of gendered early processes of forming an academic identity and ongoing collective experiences of becoming an academic.

31 October 2008 in Automation in Construction
Verified
Journal Article
Open access
SMS. Moses
S. Moses
AEAshraf El-Hamalawi
Ashraf El-Hamalawi
THTarek M. Hassan
Tarek M. Hassan
This article was published in the journal, Automation in Construction [© Elsevier] and the definitive version is available at: www.elsevier.com/locate/autconAs part of an industry-lead initiative, standards have been developed to enable bulk\ud exchange of project data between project collaboration systems used by the\ud construction industry. Through the work of developing exchange standards to the\ud practical implementation of data transfer, this paper examines the issues that need to\ud be addressed by both solution providers and their clients when considering moving a\ud project’s data between two different instances of collaborative software. It highlights\ud the practical difficulties of keeping the consistency of the data during the transfer\ud process and gives solutions that can help to overcome these and other problems. The\ud paper draws on experience gained through the development of vendor-neutral\ud standards and real-life project migrations to put forward procedures which should be\ud adopted by vendors, and gives insight into the underlying process for clients. The\ud paper will form a vital framework for clients to determine if the benefits of moving\ud projects between suppliers outweigh the difficulties associated with the move, and to\ud help vendors put processes in place to best facilitate the transfer