This paper aims to develop frost-resistant concretes, and investigate their pore structures and freeze–thaw damage mechanism. The frost-resistant concrete mixtures are designed by using rubber particles and nano-SiO2 to partially replace sands. The chord lengths, specific surface areas, contents and spacing coefficients of the pores in the designed concretes are measured and analyzed. The results show that concrete mixture incorporated with 5% silanized rubber and 3% nanosilica shows good synergetic effect by considering both mass loss and relative dynamic modulus of elasticity (RDME). The freeze–thaw damage degree of the concrete could be reduced by adding high elastic rubber particles, due to filling and constraining pores, and resulting in better uniform pore distribution and smaller pore spacing coefficient. Furthermore, the correlations between frost resistance and pore are analyzed and proposed.

27 February 2023 in Mathematics
Verified
Journal Article
Open access
PDF file
PGPeiwen Guo
Peiwen Guo
JFJun Fang
Jun Fang
KZKe Zhu
Ke Zhu
Transport infrastructure connectivity is a spatial basis for economic development and the spillover and feedback effects of transport infrastructure investment (TII) have become an impetus for economic growth (EG). However, existing research does not consider the spatial effects of TII on the gross EG and the multiple effects of TII on EG structures. To explore the spatial relationships and the functional routes between TII and EG, the spatial Durbin model (SDM) was used to empirically analyze the spatial spillover effect of TII on EG from geographical and economic perspectives based on panel data from 2007 to 2019 of 35 members and partners of the Organization for Economic Cooperation and Development (OECD+). On this basis, a structural equation model (SEM) was established to reveal the multiple mediating effects of TII on EG. Results show that (1) the SDM–SEM hybrid method can model the spatial spillover effect and function routes of TII on EG based on theoretical analysis and empirical research; (2) according to empirical analysis of the SDM model, the spatial spillover effect in high-income OECD+ countries shows a positive effect under the economic distance, while that in the upper-middle-income countries has a negative effect; (3) an empirical analysis of the function route model implies that TII in high-income OECD+ countries exerts multiple mediating effects and it mainly affects EG indirectly by means including industrial structure (IS), and the rate of contribution of the key function route FR3 is 67.25%. The following suggestions are proposed: (1) it is necessary to enhance the intensity of effective investment in transport infrastructure, focus on weak links of transport infrastructure, and pay attention to investment in burgeoning fields of the OECD+ countries; (2) differentiated TII strategies are required to be formulated according to development of OECD+ countries with different income levels; (3) it is necessary to give full play to the spatial spillover effect and multiple mediating effects of TII on EG and the TII structure should be optimized, so as to improve the economic benefits of TII.

29 May 2020 in Symmetry
Verified
Journal Article
Open access
PDF file
YDYanhua Du
Yanhua Du
JFJun Fang
Jun Fang
Jingxiao ZhangJingxiao Zhang
Jingxiao Zhang
JHJun Hu
Jun Hu
In recent years, China’s government has encouraged the adoption of the TOT (Transfer-Operate-Transfer) model to realize the marketization of China’s public service stock projects. The TOT model is a cooperation mechanism through sharing investment, revenue and risks between the government and private partner. Therefore, a fair and reasonable revenue sharing method (RSM) is the key to the success of the TOT project. This paper aims to provide a fair and reasonable RSM based on a modified Shapley value with a triangular symmetric fuzzy structure element, which has better motivation, flexibility, forecasting function and dynamic precise distribution function. According to the factors that affect revenue sharing, the Shapley value is improved with initial correction coefficient composed of investment ratio, risk-sharing ratio, execution degree, and fuzzy payment to achieve fairness and reasonableness. The methodology is illustrated by a case study of a TOT project selected from Laohekou city of Hubei province, China. The results testify that the revenue-sharing ratios of participants is positively correlated with the initial correction coefficient, which make the RSM more motivating; and the Shapley value with fuzzy payment by using triangular symmetric fuzzy element function make the RSM more flexible, and it has both forecasting function and precise dynamic distribution function under project revenue uncertainty.

19 February 2026 in Buildings
Verified
Journal Article
Open access
PDF file
XWXinxue Wang
Xinxue Wang
JFJun Fang
Jun Fang
Traditional claim management relies heavily on manual analysis and expert judgment, resulting in inefficiencies, information omissions, and heightened risks of disputes. To address these challenges, this paper constructs a domain-specific ontology for construction engineering claims through a five-step process, organizing the relevant knowledge into five unified core classes. Based on this ontology, a knowledge graph is built and stored in Neo4j. The resulting knowledge graph-enhanced LLM question-answering system, evaluated using BLEU-4, BERT-Cosine similarity, ROUGE-1, and ROUGE-L metrics, demonstrates superior performance compared to both the base LLM and Vector RAG approaches. The results indicate that the proposed ontology effectively serves the purpose of knowledge sharing and reuse while providing practical support for construction claim management.

25 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
RRRuijiang Ran
Ruijiang Ran
JFJun Fang
Jun Fang
YQYuge Qin
Yuge Qin
YSYuchu Song
Yuchu Song
Intelligent cost control in engineering, procurement, and construction (EPC) projects depends on the continuous transmission, updating, warning, correction, and reuse of cost data across multiple project stages. To analyse the resilience of this process, this study constructs an EPC project cost-data transmission network using complex network theory and Monte Carlo simulation. Eighteen core nodes and 27 directed weighted edges are identified according to EPC cost-management logic and expert evaluation. Node importance is analysed using weighted degree centrality, betweenness centrality, and PageRank, while network efficiency is used to evaluate cost-data reachability and transmission-path efficiency. Node failure, edge-weight perturbation, random edge failure, random failure and targeted attack, feedback enhancement, critical-node failure–recovery, and robustness checks are then conducted. The results show that Dynamic cost, Cost deviation warning, and Historical cost database are the three most critical nodes. Their failures reduce network efficiency by 44.54%, 37.43%, and 45.27%, respectively. Random edge failure has a stronger effect on network efficiency than edge-weight perturbation; when the edge failure probability increases from 5% to 20%, the average efficiency loss rate rises from 10.54% to 37.30%. Feedback-link enhancement increases network efficiency from 0.1858 to 0.2009 and produces a larger improvement than forward-link enhancement and random seven-edge enhancement. Robustness checks under alternative network assumptions indicate the relative stability of the critical-node identification results within the proposed network structure. The findings provide a scenario-based network perspective for identifying structurally critical nodes, vulnerable transmission links, and feedback-improvement priorities in EPC cost-data transmission. They also offer a methodological basis for future project-level calibration using BIM/5D BIM records, procurement data, cost-management platform logs, and settlement audit data.