Ruijiang Ran

Dr. Ruijiang Ran

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
GLGang Li
Gang Li
RRRuijiang Ran
Ruijiang Ran
JFJun Fang
Jun Fang
HPHao Peng
Hao Peng
SWShengmin Wang
Shengmin Wang
Bridge engineering is an important component of the transportation system, and early warnings of construction safety risks are crucial for bridge engineering construction safety. To solve the challenges faced by early warnings risk and the low early warning accuracy in bridge construction safety, this study proposed a new early‐warning model for bridge construction safety risk. The proposed model integrates a rough set (RS), the sparrow search algorithm (SSA), and the least squares support vector machine (LSSVM). In particular, the initial early warning factors of bridge construction safety risk from five factors (men, machines, methods, materials, and environment) were selected, and the RS was used to reduce the attributes of 20 initial early warning factors to obtain the optimized early warning factor set. This overcame the problem of multiple early warning factors and reduced the complexity of the subsequent prediction model. Then, the LSSVM with the strongest nonlinear modelling ability was selected to build the bridge construction early‐warning model and adopted the SSA to optimize the LSSVM parameter combination, improving the early warning accuracy. The Longlingshan Project in Wuhan and the Shihe Bridge Project in Xinyang, China, were then selected as case studies for empirical research. Results demonstrated a significant improvement in the performance of the early‐warning model following the removal of redundancy or interference factors via the RS. Compared with the standard LSSVM, Back Propagation Neural Network and other traditional early‐warning models, the proposed model exhibited higher computational efficiency and a better early warning performance. The research presented in this article has important theoretical and practical significance for the improvement of the early warning management of bridge construction safety risks.

5 April 2024 in Buildings
Verified
Journal Article
Open access
PDF file
RRRuijiang Ran
Ruijiang Ran
SWShengmin Wang
Shengmin Wang
JFJun Fang
Jun Fang
YWYejia Wang
Yejia Wang
The safety risk analysis of urban elevated bridge construction is an important management method to reduce the loss of safety accidents, and it has significant scientific research value and engineering application value. Therefore, this study proposes a novel analysis method to address these challenges. Firstly, this paper constructs a Work Breakdown Structure (WBS)–Risk Breakdown Structure (RBS) matrix for the safety risk of urban elevated bridge construction in order to achieve a comprehensive and complete identification of the indicator system. Then, a combination of static weights and dynamic weights calculation methods is developed. The static weights are obtained using the analytic hierarchy process, while the dynamic weights are obtained based on the relationship between the dynamic scores of construction safety risk indicators in different construction stages and the preset evaluation levels. Finally, a case study of the Longlingshan elevated bridge project in Wuhan, China, is conducted to validate the feasibility of the proposed model and its potential application in projects. The case analysis for the first time reveals that with the progress of construction, the weights of each indicator continuously change, and the secondary indicators related to environmental factors, such as extreme high-temperature weather, undergo the greatest changes. A comparison of different dynamic weight calculation methods is conducted to highlight the advancement of the proposed model. The research findings of this paper will provide new insights and guidance for improving the construction safety of urban elevated bridge projects.

25 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
RRRuijiang Ran
Ruijiang Ran
JFJun Fang
Jun Fang
YQYuge Qin
Yuge Qin
YSYuchu Song
Yuchu Song
Intelligent cost control in engineering, procurement, and construction (EPC) projects depends on the continuous transmission, updating, warning, correction, and reuse of cost data across multiple project stages. To analyse the resilience of this process, this study constructs an EPC project cost-data transmission network using complex network theory and Monte Carlo simulation. Eighteen core nodes and 27 directed weighted edges are identified according to EPC cost-management logic and expert evaluation. Node importance is analysed using weighted degree centrality, betweenness centrality, and PageRank, while network efficiency is used to evaluate cost-data reachability and transmission-path efficiency. Node failure, edge-weight perturbation, random edge failure, random failure and targeted attack, feedback enhancement, critical-node failure–recovery, and robustness checks are then conducted. The results show that Dynamic cost, Cost deviation warning, and Historical cost database are the three most critical nodes. Their failures reduce network efficiency by 44.54%, 37.43%, and 45.27%, respectively. Random edge failure has a stronger effect on network efficiency than edge-weight perturbation; when the edge failure probability increases from 5% to 20%, the average efficiency loss rate rises from 10.54% to 37.30%. Feedback-link enhancement increases network efficiency from 0.1858 to 0.2009 and produces a larger improvement than forward-link enhancement and random seven-edge enhancement. Robustness checks under alternative network assumptions indicate the relative stability of the critical-node identification results within the proposed network structure. The findings provide a scenario-based network perspective for identifying structurally critical nodes, vulnerable transmission links, and feedback-improvement priorities in EPC cost-data transmission. They also offer a methodological basis for future project-level calibration using BIM/5D BIM records, procurement data, cost-management platform logs, and settlement audit data.

25 June 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RRRuijiang Ran
Ruijiang Ran
JFJun Fang
Jun Fang
LYLong Yuan
Long Yuan
The Engineering-Procurement-Construction (EPC) general contracting model has emerged as the dominant delivery method for large-scale infrastructure and industrial projects in China. However, contemporary EPC project cost control remains plagued by critical industry challenges, including fragmented cross-stage coordination, pervasive data silos, and the shallow integration of digital technologies into core management processes. This study considers three key stakeholders—government regulators, project owners, and EPC general contractors—and develops a tripartite evolutionary game model to analyze the strategic interactions underlying intelligent cost control in EPC projects. We examine the evolutionary stability of each stakeholder’s strategy selection, explore how various factors influence tripartite strategic choices, and further investigate the stability of equilibrium points in the game system. The key findings are summarized as follows: (1) Strengthening government incentives and penalties simultaneously promotes owners’ investment in intelligent cost control systems and general contractors’ active collaborative cost management. However, excessive incentive intensity undermines the government’s regulatory effectiveness. (2) Establishing a revenue-sharing mechanism for excess cost savings fully stimulates the spontaneous cooperation willingness of owners and general contractors, serving as the cornerstone for market-oriented operation of intelligent cost control. (3) Reducing owners’ intelligent construction investment costs and general contractors’ collaborative control costs effectively addresses practical implementation barriers and accelerates the digital upgrading of engineering cost management. Finally, numerical simulations are performed using MATLAB R2020b to validate theoretical findings.