The construction industry has been criticized for low productivity, lack of collaboration and information sharing, poor contract administration, and the like due to its decentralized and fragmented structure as well as sequential and chain-resembling nature. Recently, blockchain technology and its benefits have received wide attention and interest. This research synthesizes the research trends and needs of this growing area by means of a bibliometric-qualitative review method. Scopus and Web of Science were selected as the literature databases to retrieve relevant academic publications. Through a systematic literature search and screening, 181 related articles were identified for bibliometric analysis, and 149 publications were critically discussed in a qualitative review. The bibliometric results indicated the recent research regarding blockchain in construction is primarily directed into several clusters, such as “smart contract,” “Building Information Modeling (BIM),” “supply chain management,” “construction contract,” “construction and project management,” “digital twin,” and “smart city.” These clusters were further synthesized for a qualitative review revealing deep insight into research challenges and gaps. Both quantitative and qualitative review results were then mapped to the future directions. It was noted that future research needs to focus on (1) quantifying the cost-benefits of the blockchain applications in construction, e.g., return on investment, practitioners training, and improving industry readiness, (2) integration of blockchain with different project delivery systems, and (3) technology fusion with blockchain for construction management.
In prefabricated construction, building components are manufactured off‐site before shipping to the site for installation. Accurate design and planning are essential for smooth on‐site execution and improved efficiency, which requires evaluations of various design options. However, due to the design process’s complexity, such evaluations cannot be achieved without automation and optimization. Meanwhile, the recent advancement of digital design technologies (e.g., building information modelling (BIM)) has enabled flexibility in the design process. The integration of BIM with other analytical algorithms also allows optimization of designs, such as the generative design that can parametrize the design. This study proposes a generative design approach that utilizes the optimization of the drywall installation layout to improve overall project efficiency. The framework includes a decision support module that considers environmental, cost, and aesthetic aspects to identify the optimal layout. The framework’s practical applicability has been successfully demonstrated through a case study. After implementation, three “best” design alternatives were found according to the decision aspects. The design improvements achieved were 37.5%, 7%, and 54% for the environmental, cost, and aesthetic factors, respectively. Accordingly, practitioners can make better decisions on planning drywall projects. This approach has proven effective in planning drywall installation and can be applied in similar design scenarios for other prefabricated construction processes.
1 May 2021 in Journal of Construction Engineering and Management
Addressing ergonomic risk factors in modular construction is critical to enhancing the productivity of production lines and reducing the societal cost burden for worker recovery. Ergonomics-driven workplace design is thus essential to not only proactively reducing risks through design changes but also accommodating medical restrictions for workers returning to work after an injury or illness. However, efforts to realize this two-fold approach are confounded by the lack of a sound approach to identifying the root causes of ergonomic posture risks among various workplace design parameters or an optimal workplace design for multiple tasks. To address this limitation, this paper proposes a parameterized workplace design optimization framework that consists of four core components: workplace design initiation, interactive worker–workplace simulation, development of predictive surrogate models, and workplace optimization. The framework is demonstrated through a case study designing a drywall preparation workplace in a real modular construction plant. The results show that the framework enables the design of the optimal workplace (i.e., the one with minimal ergonomic risk) and provides a guide for devising practical action plans for safety improvement.
1 November 2022 in Journal of Construction Engineering and Management
Extreme wind speeds pose a serious threat to tower crane stability and can lead to excessive deflections or overturning of the mast. However, wind effects might not be considered directly in either the tower crane stability analysis or in the selection of a tower crane and use location. This problem may lead to crane failures or incidents due to extreme weather or improper selection of the crane foundation. To address these limitations, the present study proposes an automated system that includes: (1) mathematical models to determine the locations of the tower crane and the material supply, seeking to minimize not only lifting moments but also tower crane travel times; and (2) a static wind-based tower crane stability analysis to support the selection of a tower crane, which is the dimensions of its foundation that produce the most stable crane foundation system. A case study including 514 crane and material supply locations is adopted to validate the effectiveness of the proposed methodology.
1 January 2022 in Journal of Information Technology in Construction
Modular construction is a promising alternative to conventional construction; offering improved productivity, quality, and safety. To realize these benefits, sequencing the module fabrication process in a manner that ensures efficient allocation of labor resources is essential. However, the varying sizes and design specifications of modules lead to high variation in process times at workstations, ineffective utilization of resources, and imbalanced production lines. To address these challenges, this paper proposes a simulation-based statistical method to plan the sequencing of module fabrication and the allocation of workers at workstations for such that productivity and control are improved. The method consists of four processes: (i) data collection to obtain historical and near real-time data; (ii) identification of significant impact factors affecting process times at workstations along the production line; (iii) development of a predictive model for forecasting process times at workstations using statistical analysis and probability distribution function; and (iv) planning the sequencing of module fabrication in a manner that ensures efficient labor allocation (i.e., crew size). The developed method is validated using data captured from a light gauge steel wall panel production line operated by a modular fabricator in Edmonton, Canada. The industrial partner produces both interior and exterior light gauge steel wall panels on a production line consisting of multiple workstations. First, five significant impact factors for each workstation among the design factors that highly influence the process times were identified in order to develop cycle time formula as a predictive model. The simulation model developed and implemented in conjunction with cycle time formula (CTF) in this case study was deemed to be a reliable predictive model (i.e. 89.39% accuracy), which can be used to improve productivity. The method is shown to be capable of assisting in decision-making by enabling production managers to better understand the effects of proposed changes to the production line prior to implementation. In this way, production managers can plan effectively and thereby reducing non-productive idle time.
23 February 2022 in Journal of Building Engineering