Tiago Rogerio Vitor Akaboci

Dr. Tiago Rogerio Vitor Akaboci

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2018 in Chemical Engineering Journal
Verified
Journal Article
Closed access
TATiago Rogerio Vitor Akaboci
Tiago Rogerio Vitor Akaboci
FGFrederic Gich
Frederic Gich
MRMaël Ruscalleda
Maël Ruscalleda
MBM. Dolors Balaguer
M. Dolors Balaguer
JCJesús Colprim
Jesús Colprim

11 February 2015 in Water Science & Technology
Verified
Journal Article
Closed access
PDF file
JWJ. Wagner
J. Wagner
LGL. B. Guimarães
L. B. Guimarães
TATiago Rogerio Vitor Akaboci
Tiago Rogerio Vitor Akaboci
RCR. H. R. Costa
R. H. R. Costa
This study evaluated aerobic granulation and nitrogen removal via assimilation, nitrification, and denitrification of a system fed with real domestic wastewater. The granulation process was complete after 160 days of operation. The mature granules had an almost spherical structure, an average size of 473.0 μm, and a good settling ability (SVI30 of 75.6 mL g−1). Ammonium assimilation for cell growth varied between 3.5 and 64.6% during reactor start-up. After granule formation, assimilation accounted for less than 5% and nitrogen was mainly removed by partial nitrification up to nitrite, followed by denitrification via nitrite. Average efficiencies of 86.6% for nitrification, 59.5% for denitrification, and 60.5% for total nitrogen were obtained in this period. The assimilation ability of the mature granules grown on domestic wastewater was lower than the commonly reported results obtained for synthetic granules.

1 May 2021 in Processes
Verified
Journal Article
Open access
PDF file
Albert MagríAlbert Magrí
Albert Magrí
MRMaël Ruscalleda
Maël Ruscalleda
AVAlbert Vilà
Albert Vilà
TATiago Rogerio Vitor Akaboci
Tiago Rogerio Vitor Akaboci
MBM. Dolors Balaguer
M. Dolors Balaguer
JCJesús Colprim
Jesús Colprim
(1) Background: Biological treatment of leachate in landfill sites using anaerobic ammonium oxidation (anammox) is challenging because of the intrinsic characteristics of this complex wastewater. In this work, the scale-up and subsequent full-scale implementation of the PANAMMOX® technology (LEQUIA Research Group, Girona, Catalonia, Spain) are presented as a case study to achieve long-term nitrogen (N) removal from mature leachate mostly through a completely autotrophic pathway. (2) Methods: The treatment system consists of two sequencing batch reactors (SBRs) running in series to individually operate partial nitritation (PN) and anammox (A). Following biological treatment, physicochemical oxidation (i.e., Fenton-based process) was used to remove the remaining non-biodegradable organic matter. A cost analysis comparative was conducted in relation to the former technology used on-site for treating the leachate. (3) Results: The scale-up of the process from pilot- to full-scale was successfully achieved, finally reaching an average removal of 7.4 kg N/d. The composition of the leachate changed over time, but especially once the landfill site stopped receiving solid waste (this fact involved a marked increase in the strength of the leachate). The adjustment of the alkalinity-to-ammonium ratio before feeding PN-SBR helped to improve the N-removal efficiency. Values of conductivity above 25 mS/cm in A-SBR could negatively affect the performance of the anammox process, making it necessary to consider a dilution strategy according to the on-line monitoring of this parameter. The analysis of the operational costs showed that by implementing the PANAMMOX® technology (LEQUIA Research Group, Girona, Catalonia, Spain) in the landfill site, savings up to 32% were achievable. (4) Conclusions: Treatment of mature landfill leachate in such a two-stage PN-A system was demonstrated as feasible and economically appealing despite the complexity of this industrial wastewater. Accurate expert supervision of the process was a key factor to reaching good performances.

15 May 2018 in Journal of Chemical Technology & Biotechnology
Verified
Journal Article
Closed access
PDF file
TATiago Rogerio Vitor Akaboci
Tiago Rogerio Vitor Akaboci
FGFrederic Gich
Frederic Gich
MRMaël Ruscalleda
Maël Ruscalleda
MBMaria Dolors Balaguer
Maria Dolors Balaguer
JCJesús Colprim
Jesús Colprim

10 December 2018 in Environmental Technology
Verified
Journal Article
Closed access
LGLorena B. Guimarães
Lorena B. Guimarães
JWJamile Wagner
Jamile Wagner
TATiago Rogerio Vitor Akaboci
Tiago Rogerio Vitor Akaboci
GDGilberto C. Daudt
Gilberto C. Daudt
PNPer H. Nielsen
Per H. Nielsen
RCRejane H. R. da Costa
Rejane H. R. da Costa
The effects of domestic wastewater and a coastal warm climate on granular sludge and biological nutrient removal were evaluated using a pilot-scale sequencing batch reactor (SBR). The reactor operation employed two different operational strategies (OS) based on up-flow feeding regimes, defined as fast (OS1, flow rate = 18.0 L min-1 and flow velocity = 22.0 m h-1) and slow (OS2, flow rate = 3.5 L min-1 and flow velocity = 4.3 m h-1). Under slow feeding, larger (OS1: 290 µm; OS2: 450 µm) and faster settling granules were obtained (OS1: 109; OS2: 74 mL g-1 TSS). The slow feeding regime was also advantageous for the hydrolysis of particulate organic matter (OS1: 1.3; OS2: 3.1 g CODtot g-1 VSS d-1) and for phosphorus removal (OS1: 97.5%). Neither strategy resulted in substantial biomass accumulation in the reactor (OS1: 0.7; OS2: 1.5 g VSS L-1), and high concentrations of nitrite were observed in the effluent (9-27 mg NO2--N L-1). Ordinary heterotrophic organisms dominated the granular sludge developed under both feeding regimes (OS1: 30% of Thauera; OS2: 56% of Comamonas), while polyphosphate-accumulating organisms (PAOs) were only detected during OS2 (2.3-3.4% of total bacteria). A successful granular sludge process should be able to cope with high fluctuations in wastewater loads caused by rain events (82-182 mm month-1 in Florianopolis, Brazil). In order to achieve higher water quality, strategies identified for an efficient granular sludge SBR operation included (i) management of an anaerobic phase for PAO selection, and (ii) aeration control for successful nitrification/denitrification.

1 February 2020 in International Biodeterioration & Biodegradation
Verified
Journal Article
Closed access
TATiago Rogerio Vitor Akaboci
Tiago Rogerio Vitor Akaboci
MRMaël Ruscalleda
Maël Ruscalleda
MBM. Dolors Balaguer
M. Dolors Balaguer
JCJesús Colprim
Jesús Colprim