Erick Pelegia

Mr. Erick Pelegia


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 May 2021 in Energies
Verified
Journal Article
Open access
PDF file
NANilton Amado
Nilton Amado
EPErick Pelegia
Erick Pelegia
ISIldo Luis Sauer
Ildo Luis Sauer
The most robust methods to determine the capacity contribution from intermittent sources combine load curve, variable generation profile, and dispatchable generators’ data to calculate any new inserted variable source’s capacity value in the power system. However, these methods invariably adopt the premise that the system’s dispatchable generators’ capacity is constant. That is an unacceptable limitation when the energy mix has a large share of hydroelectric sources. Hydroelectric plants are dispatchable sources with variable maximum power output over time, varying mainly according to the reservoirs’ level. This article develops a method that makes it possible to calculate the capacity value from renewable resources when the dispatchable generation units of an electric system have variable capacity. The authors apply the method to calculate the capacity value from solar and wind sources in Brazil as an exercise. By abandoning the hypothesis of constant dispatchable capacity, the developed approach is in principle extensible for other energy-limited resources, such as batteries and concentrating solar power (CSP). This can be a strategy to incorporate energy-limited capacity sources into the planning and operation models as reliable capacity sources.

24 October 2024 in Energies
Verified
Journal Article
Open access
PDF file
NANilton Amado
Nilton Amado
EPErick Pelegia
Erick Pelegia
ISIldo Luis Sauer
Ildo Luis Sauer
WBWelson Bassi
Welson Bassi
JRJulieta Andrea Rico
Julieta Andrea Rico
Carlos MezaCarlos Meza
Carlos Meza
Residual rights are the right to choose asset uses not specified in the contract. They are essential in situations of uncertainty. The current energy transition presents a greater variety of assets. Moreover, it is impossible to anticipate all relevant states that the assets and the environment can embody, making it impossible to optimize them contractually. Furthermore, there is consensus that the transition must occur quickly, which means high levels of investment in new specific assets. How should we distribute property rights to maximize social benefits in a context with specific and dispersed assets? Because of the complementarity between network and distributed resources, this article questions the premise that deverticalization is invariably beneficial to consumers and argues for the need to revise the concept of network and develop the regulatory implications of such a reconceptualization. We defend the need to evaluate alternative network concepts considering the technological repertoire available to operationalize them. When considering the technological repertoire available today, characterized by the competitiveness of information and communications technology (ICT) and distributed resources, we should recognize the inherently incomplete nature of the contracts signed between network operators and users.

16 September 2023 in International Journal of Energy Economics and Policy
Verified
Journal Article
Open access
PDF file
JRJulieta Andrea Rico
Julieta Andrea Rico
EPErick Pelegia
Erick Pelegia
NANilton Amado
Nilton Amado
WBWelson Bassi
Welson Bassi
ISIldo Luis Sauer
Ildo Luis Sauer
Utilities, policymakers, regulators, free market, and prosumers share a common interest in understanding whether benefits associated with such increased of DERs outweigh costs. To dimension and qualify B/C relationship, there are intrinsic variables relative to DERs' technical-economic arrangement and standard mechanisms used for its compensation: NEM, feed-in policies, etc. Other side, DERs must be adjusted on established regulatory framework, tariff schemes and utility revenue models. In this article, these three ambits are analyzed including a Brazilian southeastern region user's case study connected to MV network with DG measured data. Thus, some guidelines are pointed for the comprehensive implementation of DERs from the perspective of those involved.