Alicia Robles Velasco

Ms. Alicia Robles Velasco

Universidad de Sevilla, Departamento de Organización Industrial y Gestión de Empresas II

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2020 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
Alicia Robles VelascoAlicia Robles Velasco
Alicia Robles Velasco
Pablo CortésPablo Cortés
Pablo Cortés
JMJesús Muñuzuri
Jesús Muñuzuri
LOLuis Onieva
Luis Onieva

15 January 2021 in OR Spectrum
Verified
Journal Article
Closed access
PDF file
Alicia Robles VelascoAlicia Robles Velasco
Alicia Robles Velasco
PCPablo Cortés
Pablo Cortés
JMJesús Muñuzuri
Jesús Muñuzuri
LOLuis Onieva
Luis Onieva

23 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Alicia Robles VelascoAlicia Robles Velasco
Alicia Robles Velasco
CRCristóbal Ramos-Salgado
Cristóbal Ramos-Salgado
JMJesús Muñuzuri
Jesús Muñuzuri
Pablo CortésPablo Cortés
Pablo Cortés
The water supply networks of many countries are experiencing a drastic increase in the number of pipe failures. To reverse this tendency, it is essential to optimise the replacement plans of pipes. For this reason, companies demand pioneering techniques to predict which pipes are more prone to fail. In this study, an Artificial Neural Network (ANN) is designed to classify pipes according to their predisposition to fail based on physical and operational input variables. In addition, the usefulness and effectiveness of two sampling methods, under-sampling and over-sampling, are analysed. The implementation of the model is done using the open-source software Weka, which is specialised in machine-learning algorithms. The system is tested with a database from a real water network in Spain, obtaining high-accurate results. It is verified that the balance of the training set is imperative to increase the predictions’ accurateness. Furthermore, under-sampling prioritises true positive rates, whereas over-sampling makes the system learn to predict failures and non-failures with the same precision.

28 January 2021 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
Alicia Robles VelascoAlicia Robles Velasco
Alicia Robles Velasco
JMJesús Muñuzuri
Jesús Muñuzuri
LOLuis Onieva
Luis Onieva
MPMARIA RODRIGUEZ PALERO
MARIA RODRIGUEZ PALERO
Purpose: This study describes the trends and applications of machine learning systems in the management of water supply networks. Machine learning is a field in constant development, and it has a great potential and capability to attain improvements in real industries. The recent tendency of data storage by companies that manage the water supply networks have created a range of possibilities to apply machine learning. One particular case is the prediction of pipe failures based on historical data, which can help to optimally plan the renovation and maintenance tasks. The objective of this work is to define the stages and main characteristics of machine learning systems, focusing on supervised learning methods. Additionally, singularities that are usually found in data from water supply networks are highlighted.Design/methodology/approach: For this purpose, eight studies which contain real cases from around the world are discussed. From the data processing to the model validation, a tour of the methods used in each study is carried out. Moreover, the trendiest models are briefly defined together with the mechanisms that best suit their performance.Findings: As a result of the study, it was found that the imbalanced class problem is typical of data from water supply networks where only a small percentage of pipes fail. Consequently, it is recommended to use sampling methods to train classifiers, however, it is not necessary if we are training a regression system. Additionally, scaling and transformation of variables has generally a positive impact on the model’s performance. Currently, cross-validation is almost a requirement to obtain reliable and representative results. This technique is employed in all revised studies to train and validate their models.Originality/value: The use of machine learning systems to predict pipe failures in water supply networks is still a developing field. This study tries to define the advantages and disadvantages of different methods to process data from water supply networks, as well as to train and validate the models.

26 June 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ALAntonio Lorenzo-Espejo
Antonio Lorenzo-Espejo
AEAlejandro Escudero-Santana
Alejandro Escudero-Santana
MDMaría Luisa Muñoz Díaz
María Luisa Muñoz Díaz
Alicia Robles VelascoAlicia Robles Velasco
Alicia Robles Velasco
This study analyzes the lead time of the bending operation in the wind turbine tower manufacturing process. Since the operation involves a significant amount of employee interaction and the parts processed are heavy and voluminous, there is considerable variability in the recorded lead times. Therefore, a machine learning regression analysis has been applied to the bending process. Two machine learning algorithms have been used: a multivariate Linear Regression and the M5P method. The goal of the analysis is to gain a better understanding of the effect of several factors (technical, organizational, and experience-related) on the bending process times, and to attempt to predict these operation times as a way to increase the planning and controlling capacity of the plant. The inclusion of the experience-related variables serves as a basis for analyzing the impact of age and experience on the time-wise efficiency of workers. The proposed approach has been applied to the case of a Spanish wind turbine tower manufacturer, using data from the operation of its plant gathered between 2018 and 2021. The results show that the trained models have a moderate predictive power. Additionally, as shown by the output of the regression analysis, there are variables that would presumably have a significant impact on lead times that have been found to be non-factors, as well as some variables that generate an unexpected degree of variability.

1 July 2022 in Dirección y Organización
Verified
Journal Article
Open access
PDF file
MDMaría Luisa Muñoz Díaz
María Luisa Muñoz Díaz
AEAlejandro Escudero-Santana
Alejandro Escudero-Santana
ALAntonio Lorenzo-Espejo
Antonio Lorenzo-Espejo
Alicia Robles VelascoAlicia Robles Velasco
Alicia Robles Velasco
En este documento se presenta una revisión bibliográfica y una posterior taxonomía para modelos de programación lineal entera mixta (PLEM) en planificación de la producción. En concreto, se analizan modelos de una sola etapa por su interés en diversos tipos de procesos productivos. Se han estudiado un total de 30 modelos que se clasifican en cuanto a los objetivos perseguidos, a su formulación, a su representación y, además, según qué características y restricciones han sido tenidas en cuenta. Como resultado, estos modelos se presentan de forma clara y concisa dando un marco de trabajo para futuros desarrollos.