The rapid rise of electronic commerce has entailed an increase in logistic complexity, with last-mile logistics being the most critical element in deliveries. Since users prefer goods to be delivered at home, one of the biggest challenges faced by e-commerce is to reduce the number of incidents that occur in the delivery of goods to the homes of customers. In many cases, these deliveries cannot take place because recipients are not at the agreed delivery point, leading to a decrease in the quality of service and an increase in distribution costs. Furthermore, sometimes the delivery policies are not in tune with the customers’ expectations. This work presents a new perspective of the last-mile logistics in the context of multichannel retail, asking customers to provide several delivery locations (at home, at work, at a familiar home, in a shop, in a locker, etc.) associated with different time windows. In addition, the customer could state their preferences about these locations. This work formulates the problem and develops different approaches to solve it. A benchmark is proposed to analyze the performance and limitations. The results reveal that a distribution policy with several locations can improve the efficiency of electronic commerce by reducing delivery costs. The findings of this study have several implications for distribution companies.
12 December 2023 in Computers & Operations Research
This study analyzes the lead time of the bending operation in the wind turbine tower manufacturing process. Since the operation involves a significant amount of employee interaction and the parts processed are heavy and voluminous, there is considerable variability in the recorded lead times. Therefore, a machine learning regression analysis has been applied to the bending process. Two machine learning algorithms have been used: a multivariate Linear Regression and the M5P method. The goal of the analysis is to gain a better understanding of the effect of several factors (technical, organizational, and experience-related) on the bending process times, and to attempt to predict these operation times as a way to increase the planning and controlling capacity of the plant. The inclusion of the experience-related variables serves as a basis for analyzing the impact of age and experience on the time-wise efficiency of workers. The proposed approach has been applied to the case of a Spanish wind turbine tower manufacturer, using data from the operation of its plant gathered between 2018 and 2021. The results show that the trained models have a moderate predictive power. Additionally, as shown by the output of the regression analysis, there are variables that would presumably have a significant impact on lead times that have been found to be non-factors, as well as some variables that generate an unexpected degree of variability.
This study focuses on estimating the lead times of various processes in wind tower factories. Accurate estimation of these times allows for more efficient sequencing of activities, proper allocation of resources, and setting of realistic delivery dates, thus avoiding delays and bottlenecks in the production flow and improving process quality and efficiency. In addition, accurate estimation of these times contributes to a proper assessment of costs, overcoming the limitations of traditional techniques; this allows for the establishment of tighter quotations. The data used in this study were collected at wind tower manufacturing facilities in Spain and Brazil. Data preprocessing was conducted rigorously, encompassing cleaning, transformation, and feature selection processes. Following preprocessing, machine learning regression analysis was performed to estimate lead times. Nine algorithms were employed: decision trees, random forest, Ridge regression, Lasso regression, Elastic Net, support vector regression, gradient boosting, XGBoost, LightGBM, and multilayer perceptron. Additionally, the performance of two deep learning models, TabNet and NODE, designed specifically for tabular data, was evaluated. The results showed that gradient boosting-based algorithms were the most effective in predicting processing times and optimizing resource allocation. The system is designed to retrain models as new information becomes available.
En este documento se presenta una revisión bibliográfica y una posterior taxonomía para modelos de programación lineal entera mixta (PLEM) en planificación de la producción. En concreto, se analizan modelos de una sola etapa por su interés en diversos tipos de procesos productivos. Se han estudiado un total de 30 modelos que se clasifican en cuanto a los objetivos perseguidos, a su formulación, a su representación y, además, según qué características y restricciones han sido tenidas en cuenta. Como resultado, estos modelos se presentan de forma clara y concisa dando un marco de trabajo para futuros desarrollos.