Pile driving is a complex dynamic process, which induces ground movement. The generated ground vibrations have considerable potential to damage the nearby structures and could lead to possible disturbance of building occupants. The safety of underground structures during the driven process constitutes a significant concern. In this study, two different standards were adopted to estimate the security of tunnels adjacent to the driven pile site. The continuous pile driving installation from the initial position to the final depth was executed using arbitrary Lagrangian–Eulerian (ALE) adaptive mesh and element deletion methods. Through the elimination of all the simplified hypothesis and the adoption of a three-dimensional model, consistent results compared to field monitoring were obtained. The damage of the adjacent tunnels during the driven pile was evaluated in terms of three criteria, peak particle velocity and distance (Swiss code) and displacement limitations (Chinese code). The effects of tunnel depths (H) relative to pile length (L) were investigated by driving the pile near the tunnel axis and next to and below the pile toe. The results indicated that the peak particle velocity limit value criterion could be adopted for the safety evaluation of an existing structure during pile driving. However, the maximum allowable radial distance from the existing structures to the pile centerline is not always an acceptable criterion to justify the safety of existing structures neighboring the driven pile site. A peak vertical velocity is a convenient approach that can result in a reasonable evaluation of the peak particle velocity.
A pile foundation is commonly adopted for transferring superstructure loads into the ground in weaker soil. They diminish the settlement of the infrastructure and augment the soil-bearing capacity. This paper emphases the pile-driving effect on an existing adjacent cylindrical and semi-tapered pile. Driving a three-dimensional pile into the ground is fruitfully accomplished by combining the arbitrary Lagrangian–Eulerian (ALE) adaptive mesh and element deletion methods without adopting any assumptions that would simplify the simulation. Axial forces, bending moment, and lateral displacement were studied in the neighboring already-installed pile. An investigation was made into some factors affecting the forces and bending moment, such as pile spacing and the shape of the already-installed pile (cylindrical, tapered, or semi-tapered). An important response was observed in the impact of the driven pile on the nearby existing one, the bending moment and axial forces were not negligible, and when the pile was loaded, it was recommended to consider the coupling effect. Moreover, the adjacent semi-tapered pile was subjected to less axial and lateral movement than the cylindrical one with the same length and volume for taper angles smaller than 1.0°, and vice versa for taper angles greater than 1.4°.
We performed 2D numerical simulations to study the dynamic heap formation of coarse particles in different dry and wet conditions. Our results show that the dynamics of the particles depend not only on the amount of liquid contained in the bulk, but also on the initial particles packing, i.e., the arrangement of the grains. The wet particles cohesion model effect on coarse discs heap formation is minimal. This effect is mostly noticed in the particle arrangement and the energy variation rather than the heap formation. We found that the energy of the system varies with the liquid content up to a threshold value, equal to 219% in our study, where the influences of the parameters are minimal. At high liquid volume, the final pile height and radius tend towards an asymptotic value. The initial particles arrangement has a significant impact on the behavior of the bulk after the opening of the lateral walls. The number of particles in the triangle, formed by the initial width of the packing as a base and with a depth equal to N × D, with N representing the number of particles on a vertical line and D their diameter, influences the final shape of the pile. Indeed, the larger the number, the smaller the height of the pile. The simulations performed with the same initial packing show that the cohesion and capillary forces reduce the bulk kinetic energy and increase the potential energy when used with the elastic-plastic spring dashpot model. For the directional constant model, the dependance of the torque on the normal force and the particle size explains that there is almost no difference between the dry and wet model regarding energies. Finally, the elastic-plastic spring-dashpot model is more efficient in reducing the kinetic energy of the system and producing stable piles. Our simulation results using glass beads are in good agreement with the experiments.