Tadaharu Ishikawa

Prof. Dr. Tadaharu Ishikawa

Tokyo Institute of Technology

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2016 in Ecological Engineering
Verified
Journal Article
Closed access
QLQian Lin
Qian Lin
Tadaharu IshikawaTadaharu Ishikawa
Tadaharu Ishikawa
RARyosuke Akoh
Ryosuke Akoh
FYFenglin Yang
Fenglin Yang
SZShushen Zhang
Shushen Zhang

15 April 2023 in Hydrology
Verified
Journal Article
Open access
PDF file
Tadaharu IshikawaTadaharu Ishikawa
Tadaharu Ishikawa
RARyosuke Akoh
Ryosuke Akoh
In the upper and middle reaches of rivers in Japan, river channels used to meander in a comparatively narrow floodplain and heavy rain runoff used to naturally expand over the entire floodplain, retarding floods toward the downstream. Recent continuous levee building to prevent river overflow has had two kinds of negative effects, namely an increase in flood damage in areas of a floodplain closed by levees and river terraces at the time of runoff over the river channel capacity, and an increase in the flood peak toward the downstream. This study introduces the concept of a running water-type retarding basin that mitigates flood damage by allowing excess runoff to pass through the floodplain, restoring a natural hydrological process. After a description of the concept of the facility design, a design example is presented for a closed floodplain of the Kinu River Floodplain, where excess runoff caused severe flood damage in 2015, to quantify the performance and effects of the running water-type retarding basin.


21 July 2021 in Energies
Verified
Journal Article
Open access
PDF file
Tadaharu IshikawaTadaharu Ishikawa
Tadaharu Ishikawa
HSHiroshi Senoo
Hiroshi Senoo
The development process and flood control effects of the open-levee system, which was constructed from the mid-18th to the mid-19th centuries, on the Kurobe Alluvial Fan—a large alluvial fan located on the Japan Sea Coast of Japan’s main island—was evaluated using numerical flow simulation. The topography for the numerical simulation was determined from an old pictorial map in the 18th century and various maps after the 19th century, and the return period of the flood hydrograph was determined to be 10 years judging from the level of civil engineering of those days. The numerical results suggested the followings: The levees at the first stage were made to block the dominant divergent streams to gather the river flows together efficiently; by the completed open-levee system, excess river flow over the main channel capacity was discharged through upstream levee openings to old stream courses which were used as temporary floodways, and after the flood peak, a part of the flooded water returned to the main channel through the downstream levee openings. It is considered that the ideas of civil engineers of those days to control the floods exceeding river channel capacity, embodied in their levee arrangement, will give us hints on how to control the extraordinary floods that we should face in the near future when the scale of storms will increase due to the global climate change.

1 January 2015 in Journal of Japan Society of Civil Engineers, Ser. B1 (Hydraulic Engineering)
Verified
Journal Article
Closed access
Tadaharu IshikawaTadaharu Ishikawa
Tadaharu Ishikawa
RARyosuke Akoh
Ryosuke Akoh
HKHideo Kikkawa
Hideo Kikkawa
YKYuuki Kobayashi
Yuuki Kobayashi

31 March 2023 in International Journal of Environmental Impacts
Verified
Journal Article
Closed access
Tadaharu IshikawaTadaharu Ishikawa
Tadaharu Ishikawa
RARyosuke Akoh
Ryosuke Akoh
HSHiroshi Senoo
Hiroshi Senoo