Alaattin Kanoglu

Prof. Dr. Alaattin Kanoglu

orcid

Research Focus & Metrics

Academic Career Length

26Years (2001-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 January 2021 in Journal of Contemporary Urban Affairs
Verified
Journal Article
Open access
PDF file
BSBurcu Ulker Senkulak
Burcu Ulker Senkulak
AKAlaattin Kanoglu
Alaattin Kanoglu
ÖÖözlem özçevik
özlem özçevik
SIMURG_CITIES, is the research and development project that is developed under the main project named as SIMURG: “A performance-based and Sustainability-oriented Integration Model Using Relational database architecture to increase Global competitiveness of Turkish construction industry in industry 5.0 era”, is the relational database model that is currently being developed in a dissertation for performance-based development and assessment of sustainable and sophisticated solutions for the built environment. This study aims to analyze the key performance indicators (KPIs) at «Cities Level» for the smart city concept that is referred to as «Layers» in the master project. KPIs for the concept of a smart city is determined by using the meta-analysis technique. Hence, the three most reputable urban journals issued from 2017 through 2020 are reviewed in this study. In addition to this, models of smart city frameworks/assessment tools/KPIs are reviewed within the context of this paper; environment, economy and governance were found to have domain themes on the urban sustainability according to the literature review. Consequently, efficient and integrated urban management, environmental monitoring and management, public and social services of urban development and sustainability are found to be the most important dimensions in urban and regional planning. SIMURG_CITIES evaluation models for urban projects can use the findings of this paper.

1 August 2003 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
PDF file
AKAlaattin Kanoglu
Alaattin Kanoglu
Overruns to planned schedules are common in civil construction projects worldwide. Yet, the construction industry fails to recognize the criticality of the problem, and while models have been developed, their lack of adequate sophistication fails to alleviate the problem. Additionally, there is resistance from construction professionals to use such models due to the lack of software integration models and modular functionality. This paper presents a performance‐based duration estimation model integrated with an automation system model, MITOS – multi‐phase integrated automation system, that was designed primarily for design/build firms. An experience‐based computational model is used for the estimation of the duration of construction projects and the performance results are discussed.

21 August 2025 in Challenges in Sustainability
Verified
Journal Article
Open access
PDF file
BSBurcu Ulker Senkulak
Burcu Ulker Senkulak
AKAlaattin Kanoglu
Alaattin Kanoglu
ÖÖözlem özçevik
özlem özçevik
The assessment of urban sustainability and the development of performance-based practical tools for achieving Sustainable Development Goals (SDGs) are key items for discussion on the public agenda. Despite the urgency of the issues, there is a noticeable lack of studies related to a comprehensive model that could holistically assess sustainability performance at the city level. To address this research gap, SIMURG_CITIES conceptual model, the sub-project of "A Performance-based and Sustainability-oriented Integration Model Using Relational database architecture to increase Global competitiveness of the construction industry" (SIMURG), introduces a system-based methodology to evaluate urban sustainability of different cities. SIMURG_CITIES adopts multiple city layers and their associated key performance indicator (KPI) sets within the built environment dimension of 3D Cartesian system architecture to offer new insights. The purpose of this paper is to develop conceptual models at paradigmatic/philosophical, organizational process, interoperability/integrational, and computational/assessment components, paving the way for practical applications with a relational database model. The model and its relationship with interrelated components are explored by an iterative systems approach using "input-process-output-outcome-impact" (IPO) model and the "people-process-technology" (PPT) methodology. This structure steers the integration of humane, procedural, and technological factors into urban sustainability assessment. In addition, the model could help individuals select ideal urban environments to align with their expectations and to enhance accountability, transparency, and legitimacy in the decision-making processes of public authorities. Through this study, a technology-based approach is found to be effective in assessing urban sustainability and a conceptual framework is established in the contexts of Society 5.0 and urban governance.

1 February 2017 in International Journal of ADVANCED AND APPLIED SCIENCES
Verified
Journal Article
Open access
DYDeniz Ayşe Yazicioğlu
Deniz Ayşe Yazicioğlu
AKAlaattin Kanoglu
Alaattin Kanoglu

1 March 2001 in Construction Innovation
Verified
Journal Article
Closed access
PDF file
AKAlaattin Kanoglu
Alaattin Kanoglu
DADavid Arditi
David Arditi
Obtaining, handling and distributing information among participants in the building design process has become more difficult with increasing project complexity. In individual areas such as scheduling, estimating and drafting, it is possible to have access to computerized tools but it is clear that there is a gap in architects’ offices regarding the integration of these tools into a unified system. Architects work closely with engineers, clients, suppliers, and public authorities. Managing the information flow among these participants may not be much of a problem in small offices. But the larger architectural offices face serious management‐related problems in the design process because of the lack of an efficient information system. This paper presents a computer‐based information system called ASAP that was developed to respond to the stated problem of large architectural offices. The conceptual framework as well as a description of the prototype are presented in this paper.

1 March 2003 in Architectural Science Review
Verified
Journal Article
Closed access
AKAlaattin Kanoglu
Alaattin Kanoglu
One of the basic problems that architects encounter during the design process are keeping costs within the budget given by the client and warning the client about the impacts on building costs of various decisions. The calculation of the impacts of alternative decisions on the cost of the building must be a continuous activity. The models developed for architectural practices and construction companies should provide tools that integrate this activity into the building production process. In certain project delivery systems, e.g., design/build, the continuity and integration of the cost estimation function gains importance. That is why the cost estimation system should be designed not only to meet the requirements of a particular phase of a project (i.e., design, bidding, construction, or operation) or a certain type of firm that undertakes the project (i.e., architectural office, client organization, or contracting company) but also to integrate the information systems used by the organizations undertaking different roles in the various phases of the building production process. This paper presents an integrated system (MITOS) and its cost estimation module that have been designed primarily for design/build firms, i.e., firms or alliances of firms that do both design and construction. The cost estimation module was designed to achieve integration and continuity of the cost estimation function by introducing a model that is based on project-based productivity information in similar past projects.