Transportation infrastructure is one of the largest consumers of natural materials. To improve the environmental quality and sustainable development of transportation infrastructure, it is important to implement sustainable strategies in pavement construction and rehabilitation. The use of recycled materials is a key element in generating sustainable pavement designs to save natural resources, reduce energy, greenhouse gas emissions, and costs. The objective of this study was to propose a methodology for assessing the environmental and economic life-cycle benefits when using recycled asphalt pavement (RAP) materials in highway projects. Previous studies on life cycle analysis (LCA) using RAP focused on the economics and/or environmental impacts during the material production process. Thus, there is a need to consider sustainability analysis at all stages of construction and rehabilitation during the performance period of pavement structures. This study addresses this need with the proposed methodology. The suggested approach could be potentially implemented in a pavement management system (PMS) so as to introduce sustainability principles in optimizing alternative rehabilitation strategies. The methodology includes various steps for the analysis, starting with condition assessment of the existing highway, identifying alternative structural pavement designs, predicting service life, setting up alternative rehabilitation strategies, and conducting life cycle environmental and economic analysis. To demonstrate the value of the methodology, a comparative parametric study was conducted on two real case study projects representing actual field conditions for primary roads in Maryland. These case studies were used in order to quantify the economic savings and environmental benefits of using different levels of RAP in highway rehabilitation. The results of the analysis indicate that incorporating RAP in pavement rehabilitation can contribute substantially to cost savings and environmental impact reduction (e.g., greenhouse gas emission, energy, water, and hazardous waste). The benefits illustrated in this study are expected to encourage wide adoption of the proposed methodology and the use of recycled materials in highway construction and rehabilitation. The methodology is transferable where similar materials and highway construction techniques are used.
The use of recycled materials in roadway construction and rehabilitation can achieve significant benefits in saving natural resources, reducing energy, greenhouse gas emissions and costs. Construction and demolition waste (CDW) recycled aggregate as an alternative to natural one can enhance sustainability benefits in roadway infrastructure. The objective of this study was to quantitatively assess the life cycle economic and environmental benefits when alternative stabilized-CDW aggregates are used in pavement construction. Comparative analysis was conducted on a pavement project representative of typical construction practices in northern Italy so as to quantify such benefits. The proposed alternative sustainable construction strategies considered CDW aggregates stabilized with both cement and cement kiln dust (CKD) for the base layer of the roadway. The life cycle assessment results indicate that using CDW aggregate stabilized with CKD results in considerable cost savings and environmental benefits due to (i) lower energy consumption and emissions generation during material processing and (ii) reduction in landfill disposal. The benefits illustrated in this analysis should encourage the wider adoption of stabilized CDW aggregate in roadway construction and rehabilitation. In terms of transferability, the analysis approach suggested in this study can be used to assess the economic and environmental benefits of these and other recycled materials in roadway infrastructure elsewhere.
The use of recycled materials and industrial by-products in pavement construction and rehabilitation can achieve substantial benefits in saving nature resources and reducing energy consumption as well as greenhouse gas (GHG) emissions. Alternative geological origin rock dust for the partial replacement of fine aggregate and/or cement in Portland cement concrete (PCC) pavements may provide positive environmental and economic benefits. The objective of this study was to quantitatively assess the life-cycle economic and environmental impacts when rock dust is used in PCC pavement roadway construction. Previous studies have primarily focused on the economics and/or environmental impacts during the material production process. Thus, a methodological framework considering all stages (such as material production, transportation, construction, maintenance, rehabilitation and end of life), involved in the life-cycle assessment of concrete pavements is proposed when using recycled materials/by-products. The life-cycle assessment (LCA) was conducted on a pavement project representative of typical construction practices in Poland to quantify such benefits. The alternative sustainable construction strategies considered partially replacing fine aggregate and/or cement with rock dust of basalt origin in PCC pavements. The LCA results indicate that using rock dust to replace 20% FA and 10% cement provided a reduction of 6.5% in cost, 10% in CO2 emissions and 11% in energy consumption. This study also provides significant insights on the specific contribution of material production, construction processes and the transportation of materials to the overall environmental benefits and cost savings. The suggested approach for LCA analysis in pavement construction can be adopted elsewhere for quantifying the sustainability benefits of using alternative recycled materials in roadways.
22 July 2021 in Transportation Research Record: Journal of the Transportation Research Board
Many state highway agencies (SHAs) have adopted pay adjustment provisions in their acceptance plans for construction and materials. In these payment adjustment acceptance plans, the percentage of material within specification limits (PWL) has been selected as the quality measure to relate production quality to pay factors, and pay equations are used to determine a pay factor for a lot based on PWL. Various pay equations have been proposed by the highway community for adoption in SHAs’ specifications. However, the effectiveness of these pay equations has not been fully evaluated. Another issue concerning the pay adjustment acceptance plans is the risk associated with single and multiple pay factors. The purpose of this study was to evaluate the effects of different pay equations commonly used by SHAs and the risks associated with pay adjustment acceptance plans. This was achieved by developing operating characteristic curves associated with various pay factors and expected pay curves and Monte Carlo simulation for assessing the effects in the long run. The methodology suggested in this paper is transferable elsewhere where similar materials and specifications are used for the acceptance of pavements.
15 April 2021 in Transportation Research Record: Journal of the Transportation Research Board
The majority of State Highway Agencies now employ statistical-based specifications for the acceptance of highway materials and pavement construction. The parameters of these statistical acceptance plans are specified based on engineering judgment and may result in a high level of risk to both the agency and contractor. To appropriately apply such specifications to the pavement construction industry, the associated production quality (i.e., materials and construction variability) must be well understood by all parties involved, and its potential effects need to be assessed. To address this, the objective of this study is to quantify the risks to the agencies and contractors (i.e., Type I and Type II errors) associated with the use of both single and multiple acceptance quality characteristics through constructing operating characteristic curves. It is also the purpose of this study to provide guidelines to properly implement the key components of an acceptance plan and its associated statistics. The methodology and findings identified in this study can be applied elsewhere to evaluate the acceptance plans and the associated risks related to highway materials and pavement construction.
27 April 2023 in International Journal of Pavement Engineering
State highway agencies (SHAs) use contractor test results in the acceptance and pay rewards of materials and construction. F- and t- tests are commonly used for validating contractor test results. However, these tests are based on sample statistics, which may lead to significant acceptance risks and inconsistent rewards. In this study a Monte Carlo simulation process was developed to systematically quantify the acceptance risks and assess the implications on pay factors (PF). The simulation was performed using typical acceptance quality characteristics (AQCs), such as thickness, for Portland cement concrete (PCC) pavements. The statistical power of the F- and t-test was determined. The analysis indicated that specific combinations of contractor and agency sample sizes and population characteristics have a greater impact on the acceptance risks and may provide inconsistent PF. Thus, the findings of this study can assist both agencies and producers to better assess the acceptance risks and rewards associated with the validation procedures. Therefore, the proposed methodology can be adopted by SHAs to develop statistically valid verification procedures and thus more rational quality assurance (QA). Producers may use such analysis to identify the level of risks and rewards associated with the current production and identify potential improvements in quality.