The research presented in this article is a significant extension of data for company management boards, enabling them to make the right investment decisions at a very preliminary stage of investment preparation. The randomized method of estimating the net present value of construction projects efficiency allows to assess the profitability of projects under random implementation conditions. The probability and severity of disturbances are estimated. The primary initial data are randomized and the randomized probabilistic indicator of the net present value of project efficiency is calculated. Its values hovers around 1. Values larger than 1 mean that the project is profitable. Values lesser than 1 suggest stoppage of the implementation. As a supplement of the efficiency analysis the expected overall revenue, the expected total cost and the expected gross profit are calculated. All specified quantities are estimated for the actually expected and for the exceptionally notably favourable and extremely difficult implementation conditions. The method allow also estimation the risk of overall revenue in the range [1,0] and the risk of total cost in the range [0,1]. The changes of risk values in these ranges for the consecutive comparative values are presented in charts of revenue and cost risk and results table.
This study investigates the application of two complementary risk analysis methods—risk matrix and Monte Carlo simulation—in the context of a large-scale office building construction project. The paper explores the theoretical and practical aspects of construction risk, focusing on how probabilistic and qualitative tools can support informed decision-making. Twelve key risks, including both threats and opportunities, were identified and quantified using expert judgment and historical data. The risk matrix provided an initial prioritization of risk severity and likelihood, while Monte Carlo simulations allowed for the modeling of uncertainty in cost outcomes across a probabilistic spectrum. The results indicate a high level of consistency between the methods, with both identifying value engineering as a dominant opportunity and network documentation errors as critical threats. Monte Carlo simulations further revealed that under proper risk management, the project is likely to avoid additional cost overruns with 60% certainty. This integrated approach provides practical insights for contractors and project managers seeking to enhance the robustness of risk assessment in complex construction environments.
Randomized estimation of the net present value of a housing development allows for the assessment of the efficiency of projects in random implementation conditions. The efficiency of a project is estimated on the basis of primary input data, usually used in project planning. For this purpose, random disturbances are identified that may randomly affect the course and results of the project. The probability and severity of disturbances are determined. The primary initial data is then randomized, and a randomized probabilistic index of the project’s net present value is calculated, the value of which indicates whether the project is profitable or whether implementation should be stopped. Based on this data, the expected total revenue, the expected total cost, the expected gross profit, and the net present value of the randomized performance of the project are calculated. The values of these are estimated for expected, favorable, and unfavorable conditions of implementation. Finally, the risks for the total revenue and total cost of the project are calculated and plotted for comparative revenue values in the range [1, 0] and cost in the range [0, 1]. Their analysis makes it possible to make the right investment decisions before starting the investment at the preparation stage.
Sustainable construction aims to reduce the negative environmental impact of buildings throughout their life cycle, which includes design, construction, use, demolition and recycling. Taking into account the successive stages of the concrete life cycle and the elements of sustainable construction, the need to carry out research and analysis of the properties of concrete with additives was noticed in aspects of the concrete life cycle, e.g., the production stage, its durability during operation and the possibility of re-use after demolition. It was also noticed that the use of additives in the form of waste materials brings many benefits, including improvement of some parameters of concrete while saving natural resources. The article presents a detailed analysis of all four phases of the assessment of the life cycle of concrete modified with the addition of waste car glass: goal and scope definition, inventory analysis, impact assessment and interpretation. The progressive increase in the amount of glass waste produced each year around the world made it necessary to start the search for new recycling methods. During the research, concrete mixes were prepared according to a new, laboratory-calculated recipe containing glass fibers, natural aggregate (sand with a fraction of 0–2), crushed aggregate (basalt with a fraction of 2–8) and Portland cement (52.5 MPa). Concrete has been designed in four variants, which differ based on n the amount of tempered glass added. The first variant W1 was modified with 66.67 kg/m3, the second variant W2 contained the addition of 111.11 kg/m3 and the third variant W3—155.56 kg/m3. After 28 days, volumetric densities, values of the modulus of elasticity and thermal properties were determined; strength tests were also carried out during which the compressive strength (Reference = 70.30 MPa; W1 = 68.18 MPa; W2 = 70.13 MPa; W3 = 68.60 MPa), tensile strength in bending (Reference = 5.70 MPa; W1 = 5.63 MPa; W2 = 5.70 MPa; W3 = 5.27 MPa) and tensile strength in splitting were determined. On the remains of the samples from the strength tests, microstructure tests were performed. The conclusions and considerations on the further direction of the research were included in the discussion. The novelty of our research is related to the elimination of the glass waste processing process, which was described in detail in the Introduction.
In accordance with the principles of sustainable construction, the results of Life Cycle Assessment (LCA) technique are useful inputs to the decision-making process when designing a building. This article presents such an analysis of a finished building product, which is a modified concrete mix. The calculations took into account the phases of the A1–A4 cycle, i.e. from the extraction of raw materials to the transport of the finished material to the construction site. Test results for concrete mixes and 28-day solid concrete are presented in tabular form. Based on all the test results obtained, it was found that the addition of waste polypropylene fibres has a positive effect on the key properties for the floor concrete. It has been found that proper processing of banding tapes or other polypropylene waste into macro-fibres can be a good example of proper waste management and can contribute to a significant reduction in residual waste. This additive is emission-free and sourced from recycling, making it an excellent alternative to commonly used dispersed reinforcement.
The article addresses the topic of green and energy-efficient construction processes in the context of buildings of the future, which do not have a negative impact on the environment and minimise the use of energy both in the production of building materials and during the construction process itself. The authors present green construction process definitions as well as reasons for the growing interest in this type of construction together with the main goals such construction practices seek to achieve. The requirements that need to be fulfilled for a construction process to be defined as green are presented in a subsequent section. The authors also suggest five building materials that, in their opinion, may be referred to as green and energy-efficient. These include wood, reclaimed bricks or glass, but also less common cellulose fibres and hemp.