Construction risk assessment is the final and decisive stage of risk analysis. When highly changeable conditions of works execution are predicted, risk should be evaluated in the favorable, moderate, and difficult random conditions of construction. Given the random conditions, the schedule and cost estimate of the construction are developed. Based on these values, the risk of final deadline delay and the risk of total cost increase of construction completion are calculated. Next, the charts of the risks are elaborated. Risk changes are shown in the charts and are analyzed in the range [1, 0].
Risks pertaining to construction work relate to situations in which various events may randomly change the duration and cost of the project or worsen its quality. Because of possible significant changes of random events, favorable, moderate, and difficult conditions of construction work are considered. It is the first stage of the construction risk analysis. The probabilistic parameters of construction are identified and described by using the design characteristics model of the structure and the construction technology model. The first describes the probabilistic properties of the structure execution’s technology. The second describes the probabilistic properties of the works execution. Both models contain basic probabilistic data for scheduling, cost estimating, and risk assessment of the construction.
Randomized estimation of the net present value of a housing development allows for the assessment of the efficiency of projects in random implementation conditions. The efficiency of a project is estimated on the basis of primary input data, usually used in project planning. For this purpose, random disturbances are identified that may randomly affect the course and results of the project. The probability and severity of disturbances are determined. The primary initial data is then randomized, and a randomized probabilistic index of the project’s net present value is calculated, the value of which indicates whether the project is profitable or whether implementation should be stopped. Based on this data, the expected total revenue, the expected total cost, the expected gross profit, and the net present value of the randomized performance of the project are calculated. The values of these are estimated for expected, favorable, and unfavorable conditions of implementation. Finally, the risks for the total revenue and total cost of the project are calculated and plotted for comparative revenue values in the range [1, 0] and cost in the range [0, 1]. Their analysis makes it possible to make the right investment decisions before starting the investment at the preparation stage.
30 June 2019 in Scientific Review Engineering and Environmental Sciences (SREES)
Construction project means the arrangement of the implementation of works as well as the erection, reconstruction, assemblage, repair or demolition of the construction object. Within the framework of the project, the life cycle of the construction object is investigated, the feasibility of project is analyzed, the construction object is designed and executed or renovated, or dismantled. In order to ensure a comprehensive analysis and its results, the construction project life cycle has been proposed. This cycle consists stages: feasibility study, designing, implementation, operation and maintenance of the construction object. In each stage are systematically carried out activities related to the implementation of part or whole of the object’s life cycle. This approach provides a comprehensive analysis of conditions, successful designing, implementation, operation and maintenance of the construction object.
The REVM method is a modernized option of classical EVM method. The new method has been developed for applying in unstable condition of works implementation. When the works can be accidentally disturbed and the impact of random disruption factors on course and results of works must be taken into consideration. Next, Randomized Budgeted Duration to Completion and Randomized Budgeted Cost to Completion that is duration and cost of works remaining to execution after each inspection, as well as the Randomized Budgeted Duration at Completion and Randomized Budgeted Cost at Completion that is duration and cost of all works of the project completion after the site inspection. Moreover, the risk of durations and costs overrun of works are evaluated. It is important that input data required for the REVM method are the similar and are measured in the same way as in typical control of advancement works. But results of the application consist new decision information. Control of the investment under deterministic conditions, without taking into account the risk of disruptions, resulted in a final deviation from the planned budget of over 7%, and from the planned completion of the investment by almost 12%. Without analysing the factor related to disruptions at the investment implementation stage, the material and financial schedule was completely outdated. On the other hand, when controlling the investment under risk conditions and introducing organizational and technological changes adequate to the inspection reports, the final deviation from the planned budget was less than 2%, and slightly more than 2% from the planned completion date. Researches confirm that the results received by using the REVM method well reflect real situation of works implementation.