Dong Chen Dong Chen

Dr. Dong Chen Dong Chen

School of Civil Engineering, Anhui Jianzhu University, Hefei, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 July 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Dong Chen Dong ChenDong Chen Dong Chen
Dong Chen Dong Chen
LLLi kuaikuai Li
Li kuaikuai Li
ZYZhiyang Yuan
Zhiyang Yuan
CBCHENG Baoquan
CHENG Baoquan
XKXing Kang
Xing Kang
Glass fiber reinforced polymer (FRP) composite connectors used in precast sandwich insulation wall panels directly affect the safety of the wall. In practical applications, a precast concrete sandwich insulation wall panel is transported to the construction site for hoisting 3–5 days after steam curing, and its concrete strength typically reaches approximately 70% of the design strength (i.e., the concrete strength after natural curing for 14 days). This study investigated the natural curing of concrete for 14 days and analyzed the mechanical properties of FRP connectors with two different sections in terms of their failure mode, failure process, and load–displacement curves. Numerical analysis and finite element parametric analysis of the connectors were conducted based on experimental data. The average ultimate shear capacity of a single rectangular-section connector was 8.37 kN and that of the cross-section connector was 8.37 kN. The connectors exhibited a good shear resistance, and the rectangular-section connectors had better ductility than the cross-section connectors. The wall panel exhibited three types of failure modes: splicing failure of the fiber layer of the connector, fiber fracture in the anchorage of the connector, failure of the concrete of the anchorage, and mainly material damage of the connector itself. The error between the load simulation value and test value of a single connector was less than 10% of the numerical simulation error requirement, and the finite element simulation results were reliable. The results of the parametric simulation of the shear capacity showed that the distance between connectors, anchorage depth, and insulation layer thickness had a significant influence on the shear performance of concrete connectors.

28 October 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Dong Chen Dong ChenDong Chen Dong Chen
Dong Chen Dong Chen
ZWZhixiang Wu
Zhixiang Wu
YBYu Bao
Yu Bao
SDShaopeng Ding
Shaopeng Ding
YSYe Shao
Ye Shao
TXTao Xu
Tao Xu
Prefabricated concrete structures are driving the development of green buildings, and the connection between prefabricated components is the main factor affecting the safety performance of these structures. Grouted sleeve technology can effectively improve the safety performance of precast component connections. In the process of grouting operation, the grouted sleeves are affected by the construction environment and often have various defects. In this work, to study the influence of defects on the mechanical properties of half-grouted steel sleeve connections, 33 specimens (10 groups of defective specimens (three in each group) and 1 standard group) were prepared and subjected to uniaxial tensile tests. The failure modes, load–displacement curves, stress distribution, and other mechanical properties of the specimens were studied. Sleeves with different defects were simulated, and the simulation results were compared with the experimental results. The experimental results showed that the failure modes are rebar fracture and rebar pull-out. In the strengthening stage, the specimens exhibited a large slip. The critical length for failure mode transition was 2.5 d (defect length). The middle defects and uniform defects had the most unfavorable effect on the ultimate bearing capacity of the specimens. The stress transfer was blocked in specimens with end and middle defects. The numerical simulation results were consistent with the experimental results, thus verifying the accuracy and feasibility of the simulation method for practical applications.

29 November 2023 in Buildings
Verified
Journal Article
Open access
PDF file
QWQiong Wang
Qiong Wang
丹杨丹 杨
丹 杨
Dong Chen Dong ChenDong Chen Dong Chen
Dong Chen Dong Chen
Modular integrated construction (MiC) is a new type of assembled building structure system that consists of prefabricated concrete modules connected using post-cast concrete. To reduce material consumption and realize casting without supporting molds, thin and lightweight concrete formworks (MiC formworks) with a thickness of 30 mm are installed as part of the shear wall. Due to the thinness, concrete pouring tends to cause MiC formwork cracking, mold rising, and other problems. Its stress performance and damage mechanism are not clear. For this reason, three groups of MiC formworks with different material composition types are designed. The static load test is carried out in a graded partition loading mode, and parametric analysis is combined with numerical simulation to systematically study the influence of different material components on the mechanical properties of MiC formworks. The results show that the front cracks of the MiC formworks are mainly distributed under the truss tendons, and the back cracks are mainly distributed in the span position of the adjacent truss tendons. These cracks both occur along the span direction of the MiC formworks. Increasing the concrete strength has a significant effect on improving the load-bearing capacity of MiC formworks, while incorporating steel fibers can significantly improve its deformation and crack resistance. Parametric analysis showed that the steel fiber admixture exhibited limited improvements in the cracking resistance of the panels as the concrete matrix grade increased. The research results provide a practical basis for optimizing the production process of MiC formworks.

11 May 2023 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
HRHongmei Ren
Hongmei Ren
YLYalong Liu
Yalong Liu
THTianrong Huang
Tianrong Huang
WXWenjing Xu
Wenjing Xu
Dong Chen Dong ChenDong Chen Dong Chen
Dong Chen Dong Chen
Prefabricated concrete structure is an important aspect of the building structure development in China, while the grouted sleeve connection represents a key tool for connection on prefabricated concrete structure parts. Various grouting defects may arise during the prefabrication and actual construction processes, thereby causing unsafe connection among components. Here, we report determination of the mechanical properties of a full-grouted sleeve with grouting defects,using the defect position (end defect, middle defect, uniform defect, unilateral defect, and horizontal defect) and the defect length as test variables. We generated a total of 11 groups of full-grouted sleeve specimens, with one group as a full-grouted standard specimen. All specimens were subjected to a unidirectional tensile test, and failure mode, ultimate bearing capacity, load-slip curve, load-displacement curve as well as load-stress curve obtained. Meanwhile, the ANSYS software was used for numerical simulation. Notably, our numerical results corroborated experimental findings. The detailed profiles of mechanical properties of full-grouted sleeve connection with defects, described in this paper, are expected to serve both as a baseline and reference for further investigations.

16 May 2024 in Buildings
Verified
Journal Article
Open access
PDF file
SHShouying Hu
Shouying Hu
SJShan Jiang
Shan Jiang
Dong Chen Dong ChenDong Chen Dong Chen
Dong Chen Dong Chen
HLHaoran Li
Haoran Li
TXTao Xu
Tao Xu
Half-grouted sleeve connectors are a primary method for connecting rebar in prefabricated concrete structures. However, due to limitations in the construction environment, all kinds of grouting defects are inevitable, especially grouting voids. Additionally, fire disasters, among the most common types of disasters, significantly threaten the structural performance and safety of these prefabricated structures. Therefore, it is imperative to determine the mechanical properties of half-grouted sleeve connectors with grouting voids after high temperatures. This study designed and prepared 48 groups of half-grouted sleeve specimens with different grouting voids and defect locations. These specimens were heated to the specified temperature (25 °C, 200 °C, 300 °C, 400 °C, 500 °C, 600 °C), followed by unidirectional tensile testing after natural cooling. The experimental results showed that rebar fracture failure and rebar pulled-out failure were the failure modes of specimens. With the increase in temperature, bearing capacity, safety factor and ductility coefficient of specimens all decreased. When the temperature was lower than 400 °C, the specimen with void length less than twice the diameter of the rebar (i.e., 2d) had sufficient connection performance. For specimens with the same total void lengths, the bearing capacity of discrete voids is lower than concentrate voids at the same temperature. The load-displacement curve, safety coefficient, ductility coefficient and grey correlation degree of half-grouted sleeve specimens with grouting voids at different temperatures are analyzed and discussed, and the bond stress slip constitutive model is given. Grouting defects have greater influence on specimens after grey correlation analysis. Findings from this study provide valuable references for the safety performance evaluation of prefabricated structures with half-grouted sleeve connectors after exposure to fire.

2 July 2021 in Crystals
Verified
Journal Article
Open access
PDF file
Dong Chen Dong ChenDong Chen Dong Chen
Dong Chen Dong Chen
PLPengkun Li
Pengkun Li
CBCHENG Baoquan
CHENG Baoquan
Huihua ChenHuihua Chen
Huihua Chen
QWQiong Wang
Qiong Wang
BZBaojun Zhao
Baojun Zhao
GRC-PC wall is a new type of integrated composite exterior wall with decorative and structural functions. It is formed by superimposing GRC surface layer on the outer leaf of prefabricated PC wall. Due to the complexity of indoor and outdoor environment and the difference of shrinkage performance between concrete and GRC materials, GRC surface layer in GRC-PC wall is prone to shrinkage and cracking, among which, the connection modes between GRC layer and PC layer and change of temperature and humidity have the greatest influence. Therefore, GRC material formula was adjusted, and seven experimental panels were produced. In view of the temperature and the humidity changes in different indoor and outdoor environments, the influences of different connection modes between GRC layer and PC layer on the material shrinkage performance were studied, and a one year material shrinkage performance experiment was conducted. The results show that, in indoor environment, the shrinkage of GRC layer and PC layer is relatively gentle due to the small range of temperature and humidity change. Compared with the indoor environment, the changes of outdoor temperature and humidity are more drastic. The shrinkage changes of GRC layer and PC layer show great fluctuations, but the overall strain value is still within a reasonable range, and there is no crack. At the same time, this suggests that smooth interface is more conducive to crack resistance of GRC surface layer compared with different interface types between GRC layer and PC layer. The research provides an experimental basis for the large-scale application of the wall panel, and it has great advantages in improving the efficiency of prefabricated building construction.