Aref Alipour

Dr. Aref Alipour


Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2019 in International Journal of Management Science and Engineering Management
Verified
Journal Article
Closed access
AAAref Alipour
Aref Alipour
AKAli Asghar Khodaiari
Ali Asghar Khodaiari
AJAhmad Jafari
Ahmad Jafari
RTReza Tavakkoli-Moghaddam
Reza Tavakkoli-Moghaddam
Open-Pit Production Scheduling (OPPS) is an NP-hard problem. In this article, Genetic Algorithm (GA) is used to encode the solutions of OPPS problem. The orebody is characterized as a three-dimensional (3D) array of blocks. Therefore, in this study, a 3D GA array is employed in the solution space of the OPPS problem to reflect the 3D feature of the real mine block model. The penalty and normalization methods are utilized for handling of the capacity and sequencing constraints, respectively. The proposed method is implemented on a Marvin orebody data set and observed a considerable improvement compared with a commercial scheduler.

1 April 2012 in International Journal of Geomechanics
Verified
Journal Article
Closed access
AAAref Alipour
Aref Alipour
AJA. Jafari
A. Jafari
SHS. M. F. Hossaini
S. M. F. Hossaini
Drilling and blasting method has been used for many years in underground excavations and still is very popular because of its many advantages. Blast performance is ordinarily measured by specific charge and by explosive consumption of broken rock. The empirical models are available for estimation of specific charge and different sets of parameters. This paper presents the possibility of applying artificial neural networks (ANNs) to estimate the specific charge in various conditions of tunnel blasting. Among available existing parameters in the literature, some of the most influencing parameters are selected. After running different models, P wave, rock-quality designation (RQD), tunnel area, maximum depth of the hole, and coupling ratio (charge-to-hole diameter) are selected to estimate specific charge of tunnel blasting under various conditions. Also, conventional multi variable linear regression analysis (MVLRA) is applied to estimate specific charge. The results show that the accuracy of ANN is more than the MVLRA-based models.

1 February 2011 in International Journal of Rock Mechanics and Mining Sciences
Verified
Journal Article
Closed access
AAAref Alipour
Aref Alipour
MAM. Ashtiani
M. Ashtiani

1 November 2021 in International Journal of Geomechanics
Verified
Journal Article
Closed access
PDF file
AAAref Alipour
Aref Alipour
MMM. Mokhtarian
M. Mokhtarian
Drilling and blasting (D&B) technology is an appropriate method for rock excavation in underground mining and civil engineering projects. Specific charge as the amount of explosives used per cubic meters of extracted rock is the most important role in D&B operations. Therefore, different models have been proposed for the estimation of specific charge. The aim of this research is to develop a second-order quadratic model using response surface methodology (RSM) to estimate the specific charge in rock tunneling (V-cut D&B pattern). For this purpose, 31 data series related to geomechanic and D&B are used for modeling. In the suggested model, rock quality designation (RQD), P-wave velocity (Km/s), tunnel cross section area (m2), blast hole coupling ratio, and D&B pattern spacing/burden ratio are used as effective factors on specific charge as model response. The proposed RSM-based quadratic model consists of one quadratic, five linear, and five interaction terms. The statistical details of this model, conventional related graphs, and RSM specific analysis have satisfied the recommended model. For the specific charge, the spacing/burden ratio is more effective than the other factors and interactions.

29 January 2018 in International Journal of Management Science and Engineering Management
Verified
Journal Article
Closed access
AAAref Alipour
Aref Alipour
AKAli Asghar Khodaiari
Ali Asghar Khodaiari
AJAhmad Jafari
Ahmad Jafari
RTReza Tavakkoli-Moghaddam
Reza Tavakkoli-Moghaddam
The block extraction sequence is among the most challenging and important issues that should be regarded through whole mining operations to reach the maximum amount of profit. Such open-pit production scheduling problems can be solved under either deterministic or non-deterministic states. This study aims to model the problem applying robust counterpart linear optimization that uses the ellipsoidal set based counterpart. Block economic value as the objective function coefficient, and block weights and operational capacity as the constraints coefficients, are considered as uncertainty sources. Besides the exact mathematical modelling, a genetic algorithm is applied to solve the nonlinear ellipsoidal counterpart. The model, which was solved in deterministic and uncertain conditions, terminated in results with some differences in scheduled plans. The price of robustness is obtained at different conservative levels.

30 January 2018 in Periodica Polytechnica Civil Engineering
Verified
Journal Article
Open access
PDF file
AAAref Alipour
Aref Alipour
MMMojtaba Mokharian
Mojtaba Mokharian
SCSajjad Chehreghani
Sajjad Chehreghani
Rock masses have inherently different resistance to fragmentation by blasting. This property is hereafter referred to as the blastability of a rock mass. Empirical models for the estimation of blastability have been developed. In this study, the Mamdani fuzzy algorithm was used to express the blastability index by fuzzy sets. We use Lilly and Ghose blastability models which are important models of blastability. Parameters of these models were represented by fuzzy sets as the input variables of the fuzzy model. The output of the fuzzy model is a final blastability index rating. Experimental data is obtained from seven mine and one dam sites in Iran. BI values are obtained from both BI fuzzy inference system and conventional BI; Fuzzy sets have more adjustment than conventional model.