Sajjad Chehreghani

Sajjad Chehreghani

Auto-generated profile, based on publicly available information

Sajjad Chehreghani

School of Engineering, Mining Engineering Department, Urmia University, Urmia, Iran

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 January 2018 in Periodica Polytechnica Civil Engineering
Verified
Journal Article
Open access
PDF file
AAAref Alipour
Aref Alipour
MMMojtaba Mokharian
Mojtaba Mokharian
SCSajjad Chehreghani
Sajjad Chehreghani
Rock masses have inherently different resistance to fragmentation by blasting. This property is hereafter referred to as the blastability of a rock mass. Empirical models for the estimation of blastability have been developed. In this study, the Mamdani fuzzy algorithm was used to express the blastability index by fuzzy sets. We use Lilly and Ghose blastability models which are important models of blastability. Parameters of these models were represented by fuzzy sets as the input variables of the fuzzy model. The output of the fuzzy model is a final blastability index rating. Experimental data is obtained from seven mine and one dam sites in Iran. BI values are obtained from both BI fuzzy inference system and conventional BI; Fuzzy sets have more adjustment than conventional model.

1 January 2023 in Rudarsko-geološko-naftni zbornik
Verified
Journal Article
Closed access
PDF file
HMHassan Maleki
Hassan Maleki
MNMohammad Noaparast
Mohammad Noaparast
SCSajjad Chehreghani
Sajjad Chehreghani
MMMir Saleh Mirmohammadi
Mir Saleh Mirmohammadi
ARAli Rezaei
Ali Rezaei
One of the main challenges in the copper oxide processing industry is the application of flotation to reduce operating costs. Sulfidation-flotation is a commonly employed approach for floating oxide minerals using sulfidizers in order to sulfide the mineral’s surface. In this research work, an oxidized sample from the Qaleh Zari copper mine was used which was a high grade with 5.4% of copper (malachite and azurite). The prepared sample was subjected to mineralogical studies, and the obtained results indicated that the sample was oxidized. Malachite and azurite were the predominant minerals of copper oxide, and the predominant waste minerals were quartz and iron oxides (hematite and magnetite). The addition of sodium sulfide and flotation in four consecutive steps was a successful approach to meet the proper recovery and grade. Sodium sulfide, amyl potassium xanthate, sodium sulfide preparation time, and pH were selected as operating parameters using a central composite design (CCD). Also, by measuring the zeta potential, the electric charge of malachite was determined in different conditions after adding chemicals. Finally, under optimal conditions, the consumptions of sodium sulfide and amyl potassium xanthate, sodium sulfide preparation time, and pH value were 6790 g/t, 736 g/t, 10 minutes, and 9, respectively. By applying the mentioned conditions, a concentrate with a grade of 22.13%Cu and 90.51% recovery was achieved.

1 September 2011 in Journal of the Geological Society of India
Verified
Journal Article
Closed access
PDF file
SCSajad Haghir Chehreghani
Sajad Haghir Chehreghani
AAAref Alipour
Aref Alipour
MEMehdi Eskandarzade
Mehdi Eskandarzade
One important decision in design of surface mine is the selection of mine equipment and plant. Demand for mechanical excavation is growing in mining industry because of its high productivity and excavation in large scale with lower costs. Several models have been developed over the years to evaluate the ease of excavation and machine performance against rock mass properties. Due to complexity of excavation process and large number of effective parameters, approaches made for this purpose are essentially empirical. There are many uncertainties in results of these models. An attempt is made in this paper to revise the exisiting models. Neural network models for estimation of rock mass excavatability and production rate of VASM-2D excavating machine at Limestone quarry in Retznei, Austria, is presented. Input parameters of this model are Uniaxial compressive strength, tensile strength and discontinuities spacing of rocks. Output is the specific excavation rate per power consumption (bcm/Kwh) as the productivity indicator. Average of deviation between actual data and results estimated by neural network model was only 15% which is in an acceptable range.

1 January 2022 in Rudarsko-geološko-naftni zbornik
Verified
Journal Article
Closed access
PDF file
SCSajjad Chehreghani
Sajjad Chehreghani
HGHojjat Hosseinzadeh Gharehgheshlagh
Hojjat Hosseinzadeh Gharehgheshlagh
SHSahand Haghikia
Sahand Haghikia
The amount of comminution or fineness of minerals in a mill can be described by various parameters, the most important of which is d80 (80% passing size). The purpose of this study is to investigate and simulate the optimal operating conditions of a ball mill in a copper processing plant. The actual operating conditions in the intended mill are performed with a 300 tph tonnage, a 267 second retention time, and a discharge d80 = 53 μm. Laboratory studies showed that the optimal economical and metallurgical recovery of copper in this plant is achieved in 65 μm ≤ d80 ≤ 75 μm with Flotation Recovery (R) = 90.16%, Economical Efficiency (EE) = 93.04% and Separation Efficiency (SE) = 88.64%. In this study, having the optimal d80 for the concentration unit, the mill data, and utilizing Excel Software and the Morrell method, first the total power for the optimal set of d80 was calculated, which is equal to 7790 to 8005 kW. Then, according to these power values, the corresponding retention times were calculated, which are equal to 236 and 247 seconds respectively. Finally, utilizing the retention time-tonnage relationship and taking into account the specific filling of the mill, the optimal corresponding tonnages to the obtained retention times were calculated, ranging from 324 to 340 tph. The results of these studies showed that by reducing the level of comminution from d80 = 53 μm to 65 μm ≤ d80 ≤ 75 μm, in addition to increasing flotation efficiency to R = 90.16%, EE = 93.04% and SE = 88.64%, about 4.21% to 7.09% energy savings and an 8.00% to 13.33% tonnage increase will occur.

1 January 2023 in Rudarsko-geološko-naftni zbornik
Verified
Journal Article
Open access
PDF file
HMHassan Maleki
Hassan Maleki
SCSajjad Chehreghani
Sajjad Chehreghani
MNMohammad Noaparast
Mohammad Noaparast
MMMir Saleh Mirmohammadi
Mir Saleh Mirmohammadi
MGMinoo Ghanbarzad
Minoo Ghanbarzad
In this research work, the leaching behavior of a copper oxide ore sample prepared from the Qaleh-Zari copper mine with a very high grade of 5.4% Cu (malachite and azurite) was investigated to evaluate the effects of significant operating parameters on copper recovery, including sulfuric acid concentration, solid percentage, particle size and agitation speed. Then, response surface methodology (RSM) and central composite design (CCD) were employed to optimize the leaching process and assess interactions between the effective parameters. In order to further analyze the leaching behavior, kinetics of copper dissolution was studied on the basis of the shrinking core models (SCM). The results showed a reduction in the rate of recovery with an increase in the solid percentage and/or particle size. In contrast, any increase in the agitation speed and/or acid concentration was found to improve the recovery. It was remarkable that increasing the sulfuric acid content, beyond a certain level, imposed no significant effect on the recovery. Optimal copper recovery was obtained with a solid percentage, agitation speed, particle size, and sulfuric acid concentration of 25.12%, 586 rpm, 70 μm, and 12.5%, respectively, leading to a recovery of 93.24%. A study on the leaching kinetics indicated that the dissolution rate was controlled by the fluid diffusion from product layer model with 30.71 kJ/mol of activation energy.

30 March 2022 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
SCSajjad Chehreghani
Sajjad Chehreghani
HSHossein Azad Sola
Hossein Azad Sola
HCHamid Chakeri
Hamid Chakeri