Xuling Ye

Ms. Xuling Ye

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 August 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KSKatharina Sigalov
Katharina Sigalov
XYXuling Ye
Xuling Ye
MKMarkus König
Markus König
PHPhilipp Hagedorn
Philipp Hagedorn
FBFlorian Blum
Florian Blum
DGDominik Groß
Dominik Groß
Construction projects usually involve signing various contracts with specific billing procedures. In practice, dealing with complex contract structures causes significant problems, especially with regard to timely payment and guaranteed cash flow. Furthermore, a lack of transparency leads to a loss of trust. As a result, late or non-payment is a common problem in the construction industry. This paper presents the concept of implementing smart contracts for automated, transparent, and traceable payment processing for construction projects. Automated billing is achieved by combining Building Information Modeling (BIM) approaches with blockchain-based smart contracts. Thereby, parts of traditional construction contracts are transferred to a smart contract. The smart contract is set up using digital BIM-based tender documents and contains all of the relevant data for financial transactions. Once the contracted construction work has been accepted by the client, payments can be made automatically via authorized financial institutions. This paper describes the framework, referred to as BIMcontracts, the container-based data exchange, and the digital contract management workflow. It discusses the industry-specific requirements for blockchain and data storage and explains which technical and software architectural decisions were made. A case study is used to demonstrate the current implementation of the concept.


1 November 2024 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
XYXuling Ye
Xuling Ye
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
XTXingyu Tao
Xingyu Tao
DHDaguang Han
Daguang Han
MKMarkus König
Markus König

6 March 2023 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
Ningshuang ZengNingshuang Zeng
Ningshuang Zeng
XYXuling Ye
Xuling Ye
Yan LiuYan Liu
Yan Liu
MKMarkus König
Markus König
Purpose: The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism for efficient construction logistics planning to record the material consumption, report the real-time demand and trigger material replenishment from off-site to on-site, which is aided by Building Information Modeling (BIM) and the Kanban technique.Design/methodology/approach: This paper follows the design science research (DSR) principles to propose a system of designing and applying Kanban batch with 4D BIM for construction logistics planning and monitoring. Prototype development with comparative simulation experiments of a river remediation project is conducted to analyze the conventional and Kanban-triggered supply. Two-staged industrial interviews are conducted to guide and evaluate the system design.Findings: The proposed BIM-enabled Kanban system enables construction managers and suppliers to better set integrated on- and off-site targets, report real-time demands and conduct collaborative planning and monitoring. The simulation results present significant site storage and schedule savings applying the BIM-enabled Kanban system. Feedback and constructive suggestions from practitioners are collected via interviews and analyzed for further development.Originality/value: This paper brings to the limelight the benefits of implementing BIM-enabled demand-driven replenishment to remove waste from the material flow. This paper combines lean production theory with advanced information technology to solve construction logistics management problems.


24 May 2019 in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
Verified
Conference Paper
Closed access
XYXuling Ye
Xuling Ye
MKMarkus König
Markus König
MKMarkus Kã¶Nig
Markus Kã¶Nig