Ivan Antoniuk

Mr. Ivan Antoniuk

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Branislav MicietaBranislav Micieta
Branislav Micieta
JSJolanta Staszewska
Jolanta Staszewska
MKMatej Kovalsky
Matej Kovalsky
MKMartin Krajcovic
Martin Krajcovic
Vladimira BinasovaVladimira Binasova
Vladimira Binasova
IAIvan Antoniuk
Ivan Antoniuk
The article deals with the design of an innovative system for scheduling piece and small series discrete production using a combination of parametric simulation models and selected optimization methods. An innovative system for solving production scheduling problems is created based on data from a real production system at the workshop level. The methodology of the innovative system using simulation and optimization methods deals with the sequential scheduling problem due to its versatility, which includes several production systems and due to the fact that in practice, several modifications to production scheduling problems are encountered. Proposals of individual modules of the innovative system with the proposed communication channels have been presented, which connect the individual elements of the created library of objects for solving problems of sequential production scheduling. With the help of created communication channels, it is possible to apply individual parameters of a real production system directly to the assembled simulation model. In this system, an initial set of optimization methods is deployed, which can be applied to solve the sequential problem of production scheduling. The benefit of the solution is an innovative system that defines the content of the necessary data for working with the innovative system and the design of output reports that the proposed system provides for production planning for the production shopfloor level. The DPSS system works with several optimization methods (CR—Critical Ratio, S/RO—Slack/Remaining Operations, FDD—Flow Due Date, MWKR—Most Work Remaining, WSL—Waiting Slack, OPFSLK/PK—Operational Flow Slack per Processing Time) and the simulation experiments prove that the most suitable solution for the FT10 problem is the critical ratio method in which the replaceability of the equipment was not considered. The total length of finding all solutions by the DPSS system was 1.68 min. The main benefit of the DPSS system is the combination of two effectively used techniques not only in practice, but also in research; the mentioned techniques are production scheduling and discrete computer simulation. By combining techniques, it is possible to generate a dynamically and interactively changing simulated production program. Subsequently, it is possible to decide in the emerging conditions of certainty, uncertainty, but also risk. To determine the conditions, models of production systems are used, which represent physical production systems with their complex internal processes. Another benefit of combining techniques is the ability to evaluate a production system with a number of emerging problem modifications.

8 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Martin KrajčovičMartin Krajčovič
Martin Krajčovič
Beáta FurmannováBeáta Furmannová
Beáta Furmannová
Patrik GrznárPatrik Grznár
Patrik Grznár
RFRadovan Furmann
Radovan Furmann
DPDariusz Plinta
Dariusz Plinta
IAIvan Antoniuk
Ivan Antoniuk
The requirement to achieve effective solutions in the shortest possible time in the manufacturing environment is essential, and it can be solved only by effective production planning methods. The scientific problem is that traditional methods for creating and assessing the production plans are insufficient for the future and it is necessary to look for new alternatives. The planners in the framework of designing the production layouts and subsequent capacity planning of the employees are missing the information, methods and tools for making clear decisions. The production costs in general and especially the costs for the workforce create a large part of the operating costs in many manufacturing enterprises. The scientific goal of the article is to present a design of the system for parametric modelling and assessing the working utilisation of the production staff intended for reducing costs. The described solution is based on object-oriented analysis and contains a methodology of planning and controlling the production process in the industrial environment. The designed methodology was used for developing a planning module of project software and was shown through a case study in a company dealing with the production of automotive components. Effective modelling of the digital copy of the manufacturing system in the software environment is one of the most difficult and important steps for developing reliable information systems for planning and inspection in the industry. The methodology’s results in a company are that the solution can be used as a basis for the aggregate production planning that brings savings and efficiency increases. The research results can be used in any company with strictly defined working positions, working activities, and limiting conditions.