Javad Bakhshi

Dr. Javad Bakhshi

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2016 in International Journal of Project Management
Verified
Journal Article
Closed access
JBJavad Bakhshi
Javad Bakhshi
VIVernon Ireland
Vernon Ireland
AGAlex Gorod
Alex Gorod

24 July 2009 in Business Process Management Journal
Verified
Journal Article
Closed access
PDF file
PHPayam Hanafizadeh
Payam Hanafizadeh
MMMorteza Moosakhani
Morteza Moosakhani
JBJavad Bakhshi
Javad Bakhshi
Purpose – The purpose of this paper is to present a methodology which defines best strategic practices for business process redesign (BPR). Design/methodology/approach – A total of 29 best practices are studied and evaluated from the literature. The philosophy of TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) method is applied in recognizing the alignment of best practices with the organization strategy. The indicators of cost, time, quality and flexibility are used as the criteria to measure the degree of alignment of best practices with organization strategy. The proposed method is tested in a case study of the registration process at a university. Findings – The recent investment failures in BPR projects show that the relation between best practices and organization strategies should be highly considered. It is indicated that process redesign can meet organization strategies through recognizing and implementing best strategic practices. Research limitations/implications – Considering the fact that pundits working in the field of BPR are not accessible, the previous published findings and results have been used in this research. Practical implications – Owing to the limitations on budget and time, organizations are able to consider only those best practices which play a critical vote in helping them to achieve their goals. Best strategic practices list provides managers and business analysts with a precious resource in BPR projects. Originality/value – This paper presents a new methodology for introducing best strategic practices for BPR. A strategic best practice is a new term in the BPR literature.

21 October 2021 in Healthcare Analytics
Verified
Journal Article
Open access
JMJavid Moosavi
Javid Moosavi
JBJavad Bakhshi
Javad Bakhshi
IMIgor Martek
Igor Martek
The Covid-19 pandemic impact on people’s lives has been devastating. Around the world, people have been forced to stay home, resorting to the use of digital technologies in an effort to continue their life and work as best they can. Covid-19 has thus accelerated society’s digital transformation towards Industry 4.0 (the fourth industrial revolution). Using scientometric analysis, this study presents a systematic literature review of the themes within Industry 4.0. Thematic analysis reveals that the Internet of Things (IoT), Artificial Intelligence (AI), Cloud computing, Machine learning, Security, Big Data, Blockchain, Deep learning, Digitalization, and Cyber–physical system (CPS) to be the key technologies associated with Industry 4.0. Subsequently, a case study using Industry 4.0 technologies to manage the Covid-19 pandemic is discussed. In conclusion, Covid-19,is clearly shown to be an accelerant in the progression towards Industry 4.0. Moreover, the technologies of this digital transformation can be expected to be invoked in the management of future pandemics.

20 September 2022 in Systems
Verified
Journal Article
Open access
PDF file
NENavid Ahmadi Eftekhari
Navid Ahmadi Eftekhari
SMSaba Mani
Saba Mani
JBJavad Bakhshi
Javad Bakhshi
SMSahar Mani
Sahar Mani
An ongoing question is what constitutes the characteristics of a project manager. This is the subject of many studies. The characteristics, skills, abilities and knowledge of project managers—essential factors in a project’s success—describe their level of competency. This study aims to assess the relationship between project manager competencies and project complexity in the information technology (IT) sector. In total, 21 semi-structured interviews were conducted with senior practitioners associated with complex IT projects in the private and public sectors. All transcripts were analysed through grounded theory and content analysis, with experts approving the results. Our study identified 41 competencies within project complexity, with these grouped under the following 10 dimensions: project management (PM) knowledge; management skills; interpersonal skills and attributes; professionalism; expertise; emotional skills; contextual skills; influencing skills; team working; and cognitive skills. According to this research, leadership is the core competency of a project manager, while project management knowledge is the most essential of these competency dimensions. This study’s findings can assist both academics and practitioners in simplifying the complexity of projects and helping to achieve a project’s objectives.

3 December 2022 in Systems
Verified
Journal Article
Open access
PDF file
NENavid Ahmadi Eftekhari
Navid Ahmadi Eftekhari
SMSaba Mani
Saba Mani
JBJavad Bakhshi
Javad Bakhshi
Larissa StatsenkoLarissa Statsenko
Larissa Statsenko
LNLeila Moslemi Naeni
Leila Moslemi Naeni
Information technology (IT) projects are becoming more complex due to technological advancements, increased sociopolitical demand, and competition. In recent years, the project complexity field has attracted increasing attention with diverse strategies and methods proposed to identify, evaluate, and respond to various complexities. This study aims to identify and prioritize factors contributing to complexity in IT projects by reporting two case studies conducted on large IT organizations. The literature on project complexity informed and guided this exploratory research. The data were collected through 21 semi-structured interviews and analyzed by applying open and axial coding content analysis. Underpinned by complexity theories, 19 factors contributing to the complexity of IT projects were identified, and their importance was highlighted using the Friedman test. The top five factors contributing to IT project complexity were identified as follows: the diversity of stakeholders; technological newness of the project; conflicting goals of stakeholders; variety of product sub-systems and components; and uncertainty of project objectives. This study’s findings contribute to the project management literature and inform practitioners about how to achieve more effective management of complex IT projects.

19 November 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
JBJavad Bakhshi
Javad Bakhshi
HGHamed Golzad
Hamed Golzad
IMIgor Martek
Igor Martek
M. Reza HosseiniM. Reza Hosseini
M. Reza Hosseini
EPEleni Papadonikolaki
Eleni Papadonikolaki
Purpose: This study aims to investigate the complexity factors associated with BIM-enabled projects. BIM has been widely promoted as a potential solution to numerous challenges that hinder productivity in construction projects, owing to its numerous advantages. Nevertheless, it is crucial to acknowledge the heightened complexity it introduces to project workflows, stakeholder coordination and information management. Design/methodology/approach: This study employs the Delphi method to identify and extract complexity factors specific to BIM-enabled projects. A panel of industry and academic experts is engaged to discern and prioritise these factors based on their expertise and knowledge. Findings: The study reveals a comprehensive list of 34 complexity factors that significantly impact BIM-enabled projects. Among the most influential factors are laws and regulations, variety of procurement methods, technical capabilities of teams, project manager competence, information transfer capacity, range of project deliverables and diversity of project locations. The findings highlight the importance of these factors and emphasise the need for proactive and adaptive management to navigate their impact and achieve positive project outcomes. Originality/value: This study introduces the DEBACCS framework, a metric-based model designed to understand and evaluate complexity within BIM-enabled projects. DEBACCS stands for seven key dimensions: diversity, emergence, belonging, autonomy, connectivity, context and size. These dimensions represent essential aspects for gauging project complexity. By applying the concept of complexity from project management to BIM, the study offers valuable insights for practitioners and researchers. It provides a unique perspective on the challenges and considerations associated with implementing and managing BIM in construction projects. The findings have practical value for practitioners, enabling them to better understand and address the implications of complexity in BIM-enabled projects, ultimately leading to improved project outcomes.