Sustainable residential development requires a balance between the increasing demand for housing and the efficient use of materials and resources. The increasing use of industrialized building systems (IBSs) through new building techniques and materials holds high potential as an optimum construction alternative. Although considerable research has been conducted on industrialized buildings, very few studies have focused on low- and mid-rise residential buildings. Therefore, this paper aims to fill this gap. An extensive literature review was conducted to identify the critical success factors (CSFs) followed by an interview to discuss and validate the collected factors. This study resulted in twenty-six factors grouped into five CSFs comprising planning and control, roles and responsibilities, policies and incentives, industry maturity and technology advancement. In addition, 219 survey responses were collected and analyzed. Three factors were perceived differently among organizations including commitment toward IBS policy, implementation of preferential policy for IBSs and imposition of higher taxes on waste dumping. The top five CSFs were early planning to implement IBSs, extended training for local labor, effective communication among project players, project location evaluation and accessibility and standardized design concept adoption. The findings of this paper will help policymakers to review current practices and help develop a roadmap for sustainable IBS development for all industry organizations.
1 April 2020 in Journal of Physics: Conference Series
Building Information Modelling (BIM) is a new technology in the construction industry to form a collaboration platform for effective communication and improve productivity and efficiency. Many researches have been published investigating BIM success adoption and implementation, challenges, risk, and barriers. However, there has been no systematic study analyzing the Bibliographic of these studies as a tool to explore a research gap in BIM implementation. This study is aimed to synthesize previously published papers on BIM and propose a new method for identifying success factors for effective BIM implementation by analyzing BIM-related journal articles published from 2009 to 2018. The main feature of this research methodology is the provision of a critical review of the literature and theoretical mapping for bibliometric analysis. As a result, limited articles have been dedicated to study the effective BIM implementation. This research paper has proposed a new useful method to be adopted for identifying success factors for effective BIM implementation.
Building Information Modelling (BIM) plays a major role in enhancing the building project process. However, BIM implementation in building projects has not been categorized, and no previous investigation of its value in the different building project types has been undertaken. This research intended to evaluate BIM implementation in building projects and to identify its values, challenges, and enablers. Experts from BIM consultancy organizations were the respondents in this study. Based on nine interviews and 26 responses to a structured questionnaire, a quantitative approach to the content validity method was adopted. The results reveal that BIM implementation in mid- and low-rise buildings is very low. Only top organizations are able to implement BIM in their projects. Experts suggested that local organizations are not able to implement BIM due to their inability to adopt the BIM system as a digital management process throughout the project life cycle. In addition, there was consensus agreement based on the Content Validity Ratio (CVR) that BIM adds significant value to building projects, which includes providing collaborative organizations, greater communication, increased client satisfaction, more cost-savings, increased productivity, and a new way of reasoning for projects. This research also identified 20 challenges and 45 enablers of BIM implementation in mid- and low-rise building construction by the local firms. From the result, it was found that the presented variables were reliable, as reported in the interview transcripts and based on the majority of experts’ opinions. This research provides an important list of challenges and success factors that need to be considered to overcome the critical issue of low BIM implementation in building projects.
1 August 2019 in IOP Conference Series: Materials Science and Engineering
The implementation of Building Information Modelling (BIM) in Malaysian construction industry is considered very challenging. Although there is significant support from the government to enhance BIM adoption, the implementation of BIM is still in a very low level. Therefore, this paper is evaluating the level of BIM use among Malaysian construction companies. The research is based on a survey and observation conducted in the state of Melaka in which 90 Malaysian companies were surveyed. Based on the evaluation of 90 construction companies, 63 questionnaires were returned and only 46 were valid for further analysis which covered the main objectives of this research. Result revealed that there is a significant drawback of BIM implementation among construction companies due to the lack of awareness of application process and technology concept. The main factor responsible for the lack of awareness was found to be the delay of organizations to use BIM on their project practices. Hence, it is recommended that organizations should be practicing the BIM process within their company. Also, organizations should have the initiative to develop their roadmap for implementation and development of individual transformation plan that gradually overcomes challenges.