SIlvia Meschini

Mrs. SIlvia Meschini


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2022 in Frontiers in Built Environment
Verified
Journal Article
Open access
SMSIlvia Meschini
SIlvia Meschini
LPLaura Pellegrini
Laura Pellegrini
MLMirko Locatelli
Mirko Locatelli
DADaniele Accardo
Daniele Accardo
LTLavinia Chiara Tagliabue
Lavinia Chiara Tagliabue
MAMarco Avena
Marco Avena
The integrated use of building information modeling (BIM) and geographic information system (GIS) is promising for the development of asset management systems (AMSs) for operation and maintenance (O&M) in smart university campuses. The combination of BIM-GIS with cognitive digital twins (CDTs) can further facilitate the management of complex systems such as university building stock. CDTs enable buildings to behave as autonomous entities, dynamically reacting to environmental changes. Timely decisions based on the actual conditions of buildings and surroundings can be provided, both in emergency scenarios or when optimized and adaptive performances are required. The research aims to develop a BIM-GIS-based AMS for improving user experience and enabling the optimal use of resources in the O&M phase of an Italian university. Campuses are complex assets, mainly diffused with buildings spread across the territory, managed with still document-based and fragmented databases handled by several subjects. This results in incomplete and asymmetrical information, often leading to ineffective and untimely decisions. The paper presents a methodology for the development of a BIM-GIS web-based platform (i.e., AMS-app) providing the real-time visualization of the asset in an interactive 3D map connected to analytical dashboards for management support. Two buildings of the University of Turin are adopted as demonstrators, illustrating the development of an easily accessible, centralized database by integrating spatial and functional data, useful also to develop future CDTs. As a first attempt to show the AMS app potential, crowd simulations have been conducted to understand the buildings’ actual level of safety in case of fire emergency and demonstrate how CDTs could improve it. The identification of data needed, also gathered through the future implementation of suitable sensors and Internet of Things networks, is the core issue together with the definition of effective asset visualization and monitoring methods. Future developments will explore the integration of artificial intelligence and immersive technologies to enable space use optimization and real-time wayfinding during evacuation, exploiting digital tools to alert and drive users or authorities for safety improvement. The ability to easily optimize the paths with respect to the actual occupancy and conditions of both the asset and surroundings will be enabled.

1 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
LPLaura Pellegrini
Laura Pellegrini
MLMirko Locatelli
Mirko Locatelli
SMSIlvia Meschini
SIlvia Meschini
GPGiulia Pattini
Giulia Pattini
ESElena Seghezzi
Elena Seghezzi
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
Information Modelling and Management (IMM) methods for Most Economically Advantageous Tender (MEAT) can promote the adoption of environmentally sustainable practices. Despite the wide regulatory framework and existing drivers, Construction and Demolition Waste (CDW) trends are still growing. The literature review analyzed IMM and CDW management implementation during design phases although few studies focused on Green Public Procurement (GPP) and CDW management integration from the Public Client’s point of view. This research aims at investigating the integration and efficiency of MEAT and IMM to promote the application of sustainable strategies focused on waste reduction and resource valorization. The study investigates the Public Client’s role in promoting sustainable practices, introducing digital material inventory and BIM during the design phases, and including environmental award criteria in the call for tender documents. A Design Build (DB) procurement model was considered in the case study of a brownfield renovation and the construction of a new school in northern Italy. The methodology provided the Public Client and included a method to evaluate the environmental impact of the bids, allowing for proper selective demolition planning, CDW decrease, and organization while promoting their integration in companies’ expertise and procedures. The replicability of the methodology is demonstrated by positive results of present and previous case studies.

26 December 2024 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
SMSIlvia Meschini
SIlvia Meschini
PGPaola Gasbarri
Paola Gasbarri
DADaniele Accardo
Daniele Accardo
Lavinia C. TagliabueLavinia C. Tagliabue
Lavinia C. Tagliabue
ECElisa Cacciaguerra
Elisa Cacciaguerra
Integrating Building Information Modelling (BIM) and Geographic Information System (GIS) into Business Intelligence (BI) tools is promising for developing Asset Management Systems (AMS), especially for large and widespread building assets, such as university campuses. The AMS can provide valuable insights about asset performance and resource uses, improving cost and time savings, sustainability, and overall efficiency. A web- based AMS application (AMS-App) via BIM-GIS-BI integration is proposed, enabling the reliable digital representation of university assets by combining spatial, performance, and operational data with the related analytics and visualization dashboards. The AMS-App was developed under the umbrella of the University of Turin's strategic plan as a pilot case to apply a data-driven approach aimed at improving asset management procedures. Indeed, the managerial complexity of university campuses involves multiple actors exchanging information through still document-based and fragmented databases, often leading to untimely and ineffective decision-making processes. The AMS-App represents a valuable decision support system aimed at monitoring and improving the users' experience living in the asset, providing better and more sustainable decisions concerning spaces, occupancy flows, and indoor environmental quality (IEQ) in the learning environments. Aiming at demonstrating the effectiveness of the BIM-GIS-BI integration through the AMS-App, several topics were implemented with the following objectives: (i) the digitalization and georeferencing of the university building stock; (ii) the optimization of courses timetables according to spaces availability; (iii) the optimal management of workstations; and (iv) the monitoring, analysis and optimizing of IEQ and user comfort via IoT sensing. The paper presents the developed methodology and its applicability and replicability, illustrating the implemented topics on selected pilot buildings and discussing the results underlining advantages, challenges, and further developments needed for improved efficient and scalable university asset management.

Verified
Journal Article
Open access
PDF file
PGPaola Gasbarri
Paola Gasbarri
DADaniele Accardo
Daniele Accardo
ECElisa Cacciaguerra
Elisa Cacciaguerra
SMSIlvia Meschini
SIlvia Meschini
Lavinia C. TagliabueLavinia C. Tagliabue
Lavinia C. Tagliabue
Despite the promising outcomes achieved over time in Asset Management, data accessibility, correlation, analysis, and visualization still represent challenges. The integration, readability, and interpretation of heterogeneous information by different stakeholders is a further concern, especially at the urban scale, where spatial data integration is required to correlate virtual information with the real world. The Geographic Information System (GIS) allows these connections, representing and digitizing extensive areas with significant benefits for asset analysis, management, and decision-making processes. Such benefits are central for managing large and widespread university campuses as they are comparable to small cities, covering a wide urban region and including resources highly integrated into the urban context. The paper presents how GIS integrated into Business Intelligence (BI) tools can support university Asset Management System (AMS) creation for the optimal use of resources, illustrating the University of Turin case study. The results discussion considers the relationship between the different elements of the assets and their synergy with the city. It focuses on four themes, dealing with the asset identification of buildings and resources, especially the educational ones, asset spatiotemporal evolution, and buildings’ distances for proximity analysis. The benefits achievable through the AMS, related challenges, and possible future developments are highlighted.

1 February 2024 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
SMSIlvia Meschini
SIlvia Meschini
GPGiulia Pattini
Giulia Pattini
EAEmanuela Andreis
Emanuela Andreis
LSLaura Scomparin
Laura Scomparin
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda

28 October 2025
Verified
Book Chapter
Open access
PDF file
VVViviana Vaccaro
Viviana Vaccaro
RBRobert Birke
Robert Birke
SMSIlvia Meschini
SIlvia Meschini
Lavinia C. TagliabueLavinia C. Tagliabue
Lavinia C. Tagliabue
SRSergio Rabellino
Sergio Rabellino
MAMarco Andinucci
Marco Andinucci
The HPC4AI (High-Performance Computing for Artificial Intelligence) datacenter at the University of Turin’s Computer Science Department was established to meet the rapidly growing computational demands of interdisciplinary AI research. HPC4AI innovates by redefining the traditional roles of Cloud and High-Performance Computing (HPC) systems, where the Cloud provides a modern interface for HPC, and HPC acts as an accelerator for Cloud applications. To date, it has supported over 40 research projects spanning diverse fields such as astronomy, medicine, and human sciences. Additionally, HPC4AI serves as a research and development platform for exploring, developing, and testing novel datacenter technologies. It features a variety of experimental computing platforms and the first prototype of a two-phase evaporative server cooling system. This work outlines the operational management of HPC4AI, highlighting challenges, lessons learned, and key opportunities related to digital twins for datacenters.