Elena Seghezzi

Dr. Elena Seghezzi

Department of Architecture, built environment and construction engineering

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 March 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ESElena Seghezzi
Elena Seghezzi
MLMirko Locatelli
Mirko Locatelli
LPLaura Pellegrini
Laura Pellegrini
GPGiulia Pattini
Giulia Pattini
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
GBGuido Boella
Guido Boella
This study focuses on calibration and test campaigns of an IoT camera-based sensor system to monitor occupancy, as part of an ongoing research project aiming at defining a Building Management System (BMS) for facility management based on an occupancy-oriented Digital Twin (DT). The research project aims to facilitate the optimization of building operational stage through advanced monitoring techniques and data analytics. The quality of collected data, which are the input for analyses and simulations on the DT virtual entity, is critical to ensure the quality of the results. Therefore, calibration and test campaigns are essential to ensure data quality and efficiency of the IoT sensor system. The paper describes the general methodology for the BMS definition, and method and results of first stages of the research. The preliminary analyses included Indicative Post-Occupancy Evaluations (POEs) supported by Building Information Modelling (BIM) to optimize sensor system planning. Test campaign are then performed to evaluate collected data quality and system efficiency. The method was applied on a Department of Politecnico di Milano. The period of the year in which tests are performed was critical for lighting conditions. In addition, spaces’ geometric features and user behavior caused major issues and faults in the system.Incorrect boundary definition: areas that are not covered by boundaries; thus, they are not monitored

25 November 2021 in Buildings
Verified
Journal Article
Open access
PDF file
MLMirko Locatelli
Mirko Locatelli
ESElena Seghezzi
Elena Seghezzi
LPLaura Pellegrini
Laura Pellegrini
Lavinia C. TagliabueLavinia C. Tagliabue
Lavinia C. Tagliabue
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
The European Union (EU) aims to increase the efficiency and productivity of the construction industry. The EU suggests pairing Building Information Modeling with other digitalization technologies to seize the full potential of the digital transition. Meanwhile, industrial applications of Natural Language Processing (NLP) have emerged. The growth of NLP is affecting the construction industry. However, the potential of NLP and the combination of an NLP and BIM approach is still unexplored. The study tries to address this lack by applying a scientometric analysis to explore the state of the art of NLP in the AECO sector, and the combined applications of NLP and BIM. Science mapping is used to analyze 254 bibliographic records from Scopus Database analyzing the structure and dynamics of the domain by drawing a picture of the body of knowledge. NLP in AECO, and its pairing with BIM domain and applications, are investigated by representing: Conceptual, Intellectual, and Social structure. The highest number of NLP applications in AECO are in the fields of Project, Safety, and Risk Management. Attempts at combining NLP and BIM mainly concern the Automated Compliance Checking and semantic BIM enrichment goals. Artificial intelligence, learning algorithms, and ontologies emerge as the most widespread and promising technological drivers.

11 February 2020 in Architectural Engineering and Design Management
Verified
Journal Article
Closed access
EAEvandro Alfieri
Evandro Alfieri
ESElena Seghezzi
Elena Seghezzi
MSM. Sauchelli
M. Sauchelli
GGG. M. Di Giuda
G. M. Di Giuda
Gabriele MaseraGabriele Masera
Gabriele Masera
This research presents a framework to integrate Design for Manufacture and Assembly (DfMA) approach in the Italian Architecture, Engineering and Construction (AEC) context, based on Building Information Modelling (BIM). DfMA applications in UK and Singapore are presented and a structured process is proposed and adapted to the Italian market. Two adopted frameworks are presented: the RIBA Plan of Work 2013 (adapted for DfMA) and the Building and Construction Authority of Singapore BIM for DfMA. Both have been used to link DfMA downstream activities (procurement, fabrication, transport and installation) to upstream activities (brief, option appraisal and concept design), reaching comparisons and integrations of these processes with traditional design process adopted in Italy for public developments. A revised DfMA workflow for Italian AEC sector is developed. A case study (a kindergarten in Italy) is analysed in its DfMA peculiarities and used to test the proposed flow of information requirements and to identify shortfalls or improvements in the current processes. The proposed framework is integrated and compared with the existing design process acknowledged by the Italian Government for public buildings. The results confirmed the need for precisely structured procedures in delivering an off-site-oriented project. The framework presented guided the production, collection and organisation of data at each stage to integrate DfMA solutions into the project, while the proposed process confirmed its applicability. This research opens to scenarios of gradual implementation of DfMA-related processes, including different building sub-systems to enhance the framework and process content with additional lessons learnt.

31 December 2019
Verified
Book Chapter
Open access
PDF file
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
GPGiulia Pattini
Giulia Pattini
ESElena Seghezzi
Elena Seghezzi
MSMarco Schievano
Marco Schievano
FPFrancesco Paleari
Francesco Paleari
This paper aims to analyze the Blockchain level of implementation, focusing on the AEC sector that has always suffered from lack of trust, incomplete sharing, and transparency of information flow throughout the process execution. In this context, the progressive introduction of BIM based on the Blockchain technology can provide a trustworthy infrastructure for information management during the design, tender, and construction phases.

1 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
LPLaura Pellegrini
Laura Pellegrini
MLMirko Locatelli
Mirko Locatelli
SMSIlvia Meschini
SIlvia Meschini
GPGiulia Pattini
Giulia Pattini
ESElena Seghezzi
Elena Seghezzi
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
Information Modelling and Management (IMM) methods for Most Economically Advantageous Tender (MEAT) can promote the adoption of environmentally sustainable practices. Despite the wide regulatory framework and existing drivers, Construction and Demolition Waste (CDW) trends are still growing. The literature review analyzed IMM and CDW management implementation during design phases although few studies focused on Green Public Procurement (GPP) and CDW management integration from the Public Client’s point of view. This research aims at investigating the integration and efficiency of MEAT and IMM to promote the application of sustainable strategies focused on waste reduction and resource valorization. The study investigates the Public Client’s role in promoting sustainable practices, introducing digital material inventory and BIM during the design phases, and including environmental award criteria in the call for tender documents. A Design Build (DB) procurement model was considered in the case study of a brownfield renovation and the construction of a new school in northern Italy. The methodology provided the Public Client and included a method to evaluate the environmental impact of the bids, allowing for proper selective demolition planning, CDW decrease, and organization while promoting their integration in companies’ expertise and procedures. The replicability of the methodology is demonstrated by positive results of present and previous case studies.

31 December 2019
Verified
Book Chapter
Open access
PDF file
GGGiuseppe Martino Di Giuda
Giuseppe Martino Di Giuda
PGPaolo Ettore Giana
Paolo Ettore Giana
FPFrancesco Paleari
Francesco Paleari
MSMarco Schievano
Marco Schievano
ESElena Seghezzi
Elena Seghezzi
VVValentina Villa
Valentina Villa
The digital transition in the construction industry is characterized by data and information management as central to a BIM process. The structuring of the design performance and data shared among the various stakeholders was designed to follow the entire building process: from the client requirements, up to the design, the construction phase and the final handover. The information workflow was drafted and validated on a new building school of Melzo case study.