Fani Antoniou

Dr. Fani Antoniou

Department of Environmental Engineering, International Hellenic University, Thessaloniki, Greece
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MKMarianna Kalogeraki
Marianna Kalogeraki
Fani AntoniouFani Antoniou
Fani Antoniou
In the Architecture, Engineering and Construction (AEC) industry claims arise frequently, often resulting in disputes. Claim management should be efficient to prevent claims from escalating into disputes, and if disputes are still unavoidable, they should be resolved without delay for the construction process to resume. First, by conducting a bibliometric review, this paper attempts to investigate the literature on construction claims and dispute resolution practices by employing the Scopus database and VOSviewer to retrieve and analyze related sources. The overall trend of research by country, source, and authors is detected, and the emergence of novel technologies such as BIM, blockchain, and smart contracts appearing after 2020 concerning the investigation into construction claim management and dispute resolution was identified. Second, a content analysis on the most recent publications published between 2020 and 2022 was undertaken, indicating six main research themes that represent current research trends. The employment of novel technologies to enhance claim management and dispute resolution practices in the AEC sector is identified, as well. Finally, in order to assist construction professionals and researchers in their work to address construction claims and disputes more efficiently, potential research directions are proposed.

17 September 2021 in Systems
Verified
Journal Article
Open access
PDF file
Fani AntoniouFani Antoniou
Fani Antoniou
Significant universal research regarding causes of delay in road projects has been carried out based on expert opinion. This study classifies and standardizes all road construction delay factors found in the literature by developing a common risk breakdown structure (RBS) to allow for comparison between real project delay factors, and the study also proposes two delay risk assessment models (DRAMs) based on delay information from 120 real projects constructed in a similar environment with akin procurement and contract policies. The first calculates the risk priority number (RPN) and the second applies the Technique for Order Preference by Similarity to Ideal Situation (TOPSIS) multi-criteria decision-making method (MCDM). The results showed that four specific delay factors dominate in Greek road construction for which relevant mitigation proposals are made. The proposed DRAMs, while calibrated for application in Greece, can be adapted to any construction environment for which real project data is available to provide a tool for transferring experience from past projects to future projects and from accomplished to novice public client decision makers.

30 January 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Fani AntoniouFani Antoniou
Fani Antoniou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
DGDimitrios Giannoulakis
Dimitrios Giannoulakis
DKDimitrios Konstantinidis
Dimitrios Konstantinidis
This paper addresses the gap in the scientific literature regarding construction cost estimates for the construction of underground metro stations. It provides preliminary cost estimation models using linear regression for use by the Greek underground metro public transport authority for planning future extensions to the Athens and Thessaloniki networks. At the same time, it contributes to the body of knowledge by proposing material quantity prediction models and presents a two-stage preliminary cost estimation model for the construction of civil engineering works of underground metro stations. Stage one uses the construction cost budgets of six metro stations in Greece to develop a multilinear regression equation for the prediction of the overall cost for construction of civil engineering works; stage two provides estimates of material quantities using linear regression, key quantity ratios, and artificial neural networks. The data analyzed are from the prior measurements of quantities for the construction of the Chaidari to Piraeus extension of the Athens Metro Line 3. After comparing the actual values of costs and quantities with the corresponding predictions, acceptable discrepancies are observed. All models provide estimates within ±25% discrepancies, which are acceptable at the conceptual planning phase in order to initiate project funding quests.

25 January 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Fani AntoniouFani Antoniou
Fani Antoniou
ATAlexandra Vassiliki Tsioulpa
Alexandra Vassiliki Tsioulpa
Conflicts are frequent within the complex professional environment of the construction industry. If claims cannot be overcome amicably, they result in disputes that lead to litigation. Identification of the causes of these claims and their impact on the duration, cost, and quality of the final project is expected to facilitate the prevention of unsuccessful performance of construction contracts. The novelty of this study is that after codifying the most common causes of construction contract claims derived from the extant literature, they are further investigated in terms of their probability of occurrence and the perceived impact they have on the project completion time, its total cost, and quality. Based on calculated relative importance indices from expert opinion, this paper proposes probability and severity of impact values for 39 common causes of claims in the construction industry. These can be applied to calculate their risk values for stakeholders in public construction contracts to plan mitigation measures for contractual claims. The findings show that the top five highest risk causes of contractual claims in the Greek construction industry are changes in quantities, work, or scope, design quality deficiencies or errors, payment delays, delays in work progress, and the financial failure of the contractor.

21 June 2021 in International Journal of Injury Control and Safety Promotion
Verified
Journal Article
Closed access
Fani AntoniouFani Antoniou
Fani Antoniou
MMMaria Merkouri
Maria Merkouri
Following manufacturing, construction is the industry that is responsible for the majority of work-related accidents due to the complexity and uniqueness of each construction site. The accidents that occur on construction sites reflect the safety culture and the general health and safety (H&S) policy in the construction field. The purpose of this paper is to investigate the frequency of accidents and their contributing factors in each stage of 9 different types of construction. This paper utilizes data from published scientific literature to extract the universal contributing factors to be evaluated in the Greek construction industry and to compare results with documented international accidents. The riskiest construction stages per construction type and the main factors behind them are determined. The results show contradictions regarding the contributing factors as perceived by Greek professionals and those verified by international real accident data.

6 May 2019 in International Journal of Managing Projects in Business
Verified
Journal Article
Closed access
Marina MarinelliMarina Marinelli
Marina Marinelli
Fani AntoniouFani Antoniou
Fani Antoniou
Purpose: The purpose of this paper is to propose a new procurement strategy with the aim to achieve higher value for money (VFM) in public works delivery. Its main innovation lies in the possibility of optional submission of cost-efficient design variants by any interested contractor within the context of an open procedure. The final scope of works incorporates the variants approved, and all contractors are invited to submit a bid for the revised scope and budget. Design/methodology/approach: This paper is a piece of applied research presenting the development of a new, cost-effective procurement strategy for public works, geared at the European Union (EU) legal framework. The strategy’s feature compilation has been based on comprehensive literature review while numerical data from a real world project were used to demonstrate its financial advantages. Findings: The proposed strategy enables the delivery of the best value project at the lowest cost possible. This is achieved through ensuring high competition among competent contractors, improving the cost efficiency of technical solutions, discouraging future scope changes and establishing objectivity, fairness and transparency in the process of contract award. Practical implications: The use of the proposed strategy results in public projects of enhanced VFM, reduced constructability issues and less scope changes during the construction stage. Originality/value: The proposed strategy marks a new approach in procurement which enables the delivery of best VFM in public works. Therefore, it makes a valuable contribution towards the achievement of the overarching EU target for efficient public spending.