Georgios Aretoulis

Dr. Georgios Aretoulis

Civil Engineering, Aristotle University of Thessaloniki, Thessaloníki, Kentrikí Makedonía, Greece
orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 January 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Fani AntoniouFani Antoniou
Fani Antoniou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
DGDimitrios Giannoulakis
Dimitrios Giannoulakis
DKDimitrios Konstantinidis
Dimitrios Konstantinidis
This paper addresses the gap in the scientific literature regarding construction cost estimates for the construction of underground metro stations. It provides preliminary cost estimation models using linear regression for use by the Greek underground metro public transport authority for planning future extensions to the Athens and Thessaloniki networks. At the same time, it contributes to the body of knowledge by proposing material quantity prediction models and presents a two-stage preliminary cost estimation model for the construction of civil engineering works of underground metro stations. Stage one uses the construction cost budgets of six metro stations in Greece to develop a multilinear regression equation for the prediction of the overall cost for construction of civil engineering works; stage two provides estimates of material quantities using linear regression, key quantity ratios, and artificial neural networks. The data analyzed are from the prior measurements of quantities for the construction of the Chaidari to Piraeus extension of the Athens Metro Line 3. After comparing the actual values of costs and quantities with the corresponding predictions, acceptable discrepancies are observed. All models provide estimates within ±25% discrepancies, which are acceptable at the conceptual planning phase in order to initiate project funding quests.

Verified
Journal Article
Open access
PDF file
Antigoni ZafeirakouAntigoni Zafeirakou
Antigoni Zafeirakou
STStefania Themeli
Stefania Themeli
ETEythymia Tsami
Eythymia Tsami
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
Marine pollution has many different sources. This study focuses on oil spills that may occur after a ship collision or during oil extraction and other oil tanker activities. The most critical oil spill accidents are presented, followed by the regulatory framework on maritime oil spill management. Among the measures taken towards the protection of the marine and coastal environment from oil pollution are floating booms and barriers, oil collecting materials and vessels, absorbent materials, chemical dispersants, other chemicals, physical degradation, biodegradation, on-site oil burning. These measures may assist coastal facilities and local authorities in their strategic development of oil spill mitigation planning and response towards coastal and marine protection from oil spills. In the present paper, the aim is to rank the approaches of dealing with the oil spill by means of a multicriteria method. The theoretical background of the selected multicriteria method, called PROMETHEE, is briefly presented; necessary to understand the ranking of the treatment approaches as well as the subsequent findings of the possible criteria for the analysis. Almost all of the scenarios evaluated rank floating booms and barriers as the most suitable methods to deal with oil spill containment, followed by oil collecting materials and vessels.

27 May 2019 in Safety
Verified
Journal Article
Open access
PDF file
SBSotiris Betsis
Sotiris Betsis
MKMaria Kalogirou
Maria Kalogirou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
MPMaria Pertzinidou
Maria Pertzinidou
Construction project related accidents are critical events and it is imperative that they are analyzed in order to understand and identify their root causes. Therefore, the present study analyzes work accidents on construction projects in northern Greece. The methodological approach firstly includes the collection of accident related data from the “Greek Work Inspection Organization”, which is followed by a descriptive analysis and corresponding codification of available data. The next step includes the creation of an appropriate database in SPSS to accommodate all relevant data and subsequent correlation analysis that aims to identify potential trends and tendencies within the accidents’ sample. The findings highlight the most frequent occurrences regarding construction work related accidents and at the same time identify correlations among the various parameters associated with them. The majority of accidents include inexperienced personnel and workers in the age range of 24–44 years old. Moreover, most accidents occur during the summer and are not fatal. Falls are by far the dominant type of accident, and as a consequence, fractures are the most frequently occurring type of injury. Finally, most accidents occur in the morning, with injuries focusing on the lower parts of the body, and in the presence of general use equipment. The current paper also identified associations among various accident characteristics. These findings could help towards reducing the number and severity of work-related accidents. Improved construction site organization, accompanied by the dedication of management towards health and safety and more frequent inspections, could decrease the number and severity of accidents.

19 September 2009 in Operational Research
Verified
Journal Article
Closed access
PDF file
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
GKGlykeria P. Kalfakakou
Glykeria P. Kalfakakou
FSFevronia Z. Striagka
Fevronia Z. Striagka

26 March 2018 in International Journal of Construction Management
Verified
Journal Article
Closed access
Fani AntoniouFani Antoniou
Fani Antoniou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
The choice of method of contractor compensation is a complex decision that should be taken by awarding authorities (AAs) based on a systematic and scientific examination of alternative options instead of the decision-maker's knowledge, experience and intuition. Little research work has been carried out that applies multi-criteria decision-making (MCDM) methods for the choice of contract type in the construction industry. This paper contributes to this area in research by presenting a comparative analysis of the application of the Technique for Order Preference by Similarity to Ideal Situation method and the multi attribute utility theory to the problem of choosing appropriate contract types for two pilot projects in Greece with varying characteristics and AA's needs. For each project, nine selection criteria (SC) were weighted by two experts using the analytical hierarchy process, the revised Simos’ method and goal programming. Based on the results, a decision support system for the choice of contract type for highway construction contractors in Greece is proposed which utilizes the experience of professionals from AAs in Greece and abroad and applies the above-mentioned MCDM methods.

1 January 2016 in International Journal of Management and Decision Making
Verified
Journal Article
Closed access
Fani AntoniouFani Antoniou
Fani Antoniou
DKDimitrios Konstantinidis
Dimitrios Konstantinidis
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
The selection of the appropriate procurement system (PS) for major highway projects in Greece is central to their success, as the relevant interdependent interfaces and required contracts between stakeholders are numerous and complex. The PSs investigated are traditional, traditional fast track, design and build, private-public partnership, construction management, management contracts and partnering. The relevant selection criteria that were considered refer to the project characteristics, the needs of the awarding authority and the market conditions. A questionnaire survey was carried out in order to record the performance of each PS against each selection criterion. The survey succeeded in collecting responses from 91 international highway procurement experts. The paper then evaluated the mean ratings of each PS against each alternative selection criterion. These ratings were considered as marginal utility values for use in the multi attribute utility theory method. The weights of each selection criterion are calculated using the revised Simos method, the analytical hierarchy process and goal programming. Two pilot projects in Greece were defined as case studies, for the proposed methodology to be tested. The results showed that the public-private partnership system is frequently chosen as the most appropriate PS.