Zhibin Lin

Prof. Dr. Zhibin Lin


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
HLHongyang Liu
Hongyang Liu
ZLZhibin Lin
Zhibin Lin
CLChengwei Liu
Chengwei Liu
ZBZHANG Boyang
ZHANG Boyang
Chen WangChen Wang
Chen Wang
HLHuajie Liang
Huajie Liang
There are more and more tunnel projects in the karst-developed areas in Southwest China. Affected by karst caves and water, karst tunnels often experience geological disasters such as local collapses and water inrush. A simplified rock stress hardening-softening model was established based on the triaxial compression test results of two kinds of carbonatite to accurately analyze the deformation and water inrush characteristics of the surrounding rocks after karst tunnel excavation. The total stress–strain curve of rocks was simplified into four linear stages: the linear elastic stage, strain hardening stage, strain-softening stage, and residual stage. The volumetric strain–axial strain curve was simplified into four corresponding linear stages: the elastic expansion stage, slow expansion stage, rapid expansion stage, and stable expansion stage. The stress hardening–softening model was used to deduce the relationship between the rocks’ mechanical parameters such as cohesion, internal friction angle, dilatancy angle, and plastic strain, as well as the relationship between seepage characteristic parameters such as permeability coefficient, porosity, and volumetric strain. A karst tunnel in Chongqing, China was taken as the engineering background. The stress hardening–softening constitutive model and seepage characteristic parameters were applied to the FLAC3D numerical simulation by the programming language FISH to analyze the stability and water inrush characteristics of karst tunnels in overlying confining caves. The results showed that rock masses between the cave and tunnel were prone to overall sliding instability. Confined water in the karst cave intruded into the tunnel through the shear-slip rupture zone on both sides instead of the shortest path. Two water inrush points existed on the tunnel surface. The variation law of the permeability coefficients of the surrounding rocks could more truly reflect whether there was a seepage channel between the tunnel and karst cave, as well as the permeable area and water inrush speed of the seepage channel. The work provides a new idea for the stability control of karst tunnels.

1 January 2018 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
BZBoyang Zhang
Boyang Zhang
ZLZhibin Lin
Zhibin Lin
A quicksand disaster through a borehole occurred in Longde coal mine. A lot of aeolian sand, the volume of which is between 310,000 m3 and 380,000 m3, has submerged into the underground space in about 70.5 h. The volume flux of quicksand cannot be calculated accurately by the empirical method. Based on the method of fluid mechanics, an all‐purpose computing method for quicksand disaster through a borehole was proposed. The result shows that the inrush volume of sand into underground space was between 310,000 m3 and 350,000 m3, which was consistent with the actual result. To apply and popularize this method, the impact laws of water yield properties of an aquifer on the volume flux were discussed. The all‐purpose computing method can be suitably used for the volume flux calculation of quicksand disaster through the borehole.

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
BZBo-Yang Zhang
Bo-Yang Zhang
ZLZhibin Lin
Zhibin Lin
The karst collapse column composed of crushed rocks and fine argillaceous or clay particles is easy to form the fissure channels between the coal seam working face and the confined limestone aquifer under mining and causes water inrush disasters with the loss of underground water resource, economic losses, and casualties. It is of great necessity to understand the seepage properties of crushed rock in karst collapse column for the prevention of water inrush and the protection of underground water resource. A self‐developed seepage test system is used in this paper to conduct laboratory experiments on seepage properties of crushed mudstone specimens. The effects of the particle size distribution, the porosity (specimen height), and the hydraulic pressure on the water flow velocity and the permeability of crushed specimen are analyzed. The results indicate that the permeability of specimen increases with the particle size, porosity, and hydraulic pressure. It can be known from the comparative experiments of progressive hydraulic pressure on one specimen and variable hydraulic pressure on different specimens with constant particle size and porosity that more fine particles leak out from the specimen with repeated application of hydraulic pressure on one specimen. Therefore, the permeability of one specimen is bigger than that of different specimens under the condition of same hydraulic pressure.

15 September 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
BFBin Fu
Bin Fu
Yingchun LiYingchun Li
Yingchun Li
CTChunan Tang
Chunan Tang
ZLZhibin Lin
Zhibin Lin
Rock slope stability is commonly dominated by locked patches along a potential slip surface. How naturally heterogeneous locked patches of different properties affect the rock slope stability remains enigmatic. Here, we simulate a rock slope with two locked patches subjected to shear loading through a self-developed software, rock failure process analysis (RFPA). In the finite element method (FEM)-based code, the inherent heterogeneity of rock is quantified by the classic Weibull distribution, and the constitutive relationship of the meso-scale element is formulated by the statistical damage theory. The effects of mechanical and geometrical properties of the locked patches on the stability of the simulated rock slope are systematically studied. We find that the rock homogeneity modulates the failure mode of the rock slope. As the homogeneity degree is elevated, the failure of the locked patch transits from the locked patch itself to both the interfaces between the locked patched and the slide body and the bedrock, and then to the bedrock. The analysis of variance shows that length and strength of locked patch affect most shear strength and the peak shear displacement of the rock slope. Most of the rock slopes exhibit similar failure modes where the macroscopic cracks mainly concentrate on the interfaces between the locked patch and the bedrock and the slide body, respectively, and the acoustic events become intensive after one of the locked patches is damaged. The locked patches are failed sequentially, and the sequence is apparently affected by their relative positions. The numerically reproduced failure mode of the rock slope with locked patches of different geometrical and mechanical properties are consistent with the laboratory observations. We also propose a simple spring-slider model to elucidate the failure process of the rock slope with locked patches.

27 May 2022 in Energies
Verified
Journal Article
Open access
PDF file
HLHongyang Liu
Hongyang Liu
Mingrui DuMingrui Du
Mingrui Du
ZBZHANG Boyang
ZHANG Boyang
ZLZhibin Lin
Zhibin Lin
CLChengwei Liu
Chengwei Liu
FWFeng Wang
Feng Wang
The increasing use of high-voltage transmission wires requires more and more high-voltage pylons, and sometimes, constructing pylons in mining areas is very urgent. To ensure the safe operation of pylons, coal pillars with large side lengths are usually used to provide sufficient support; however, this results in a huge waste of coal. Eight high-voltage pylons are arranged on the ground surface corresponding to the location of working face 1110 of Sima Coal Mine in Shanxi Province, China, which cannot be mined by traditional methods. Taking this as the engineering background, the failure mode of high-voltage pylon is first analyzed. Using FLAC3D numerical simulations, the influence of five different mining plans on ground surface deformation in working face 1110 is evaluated, and the vertical settlement and horizontal deformation in different areas of the ground surface, as well as the variation law of horizontal strain and slope are analyzed. According to the numerical simulation results, the range of thickness-limiting mining or backfill mining in working face 1110 is shown in scheme 3, and the key regions in the mining process are determined. Secondly, the strengthening scheme of high-voltage pylons is designed, that is, the four foundations of high-voltage pylons are connected as a whole with steel supports and steel connectors so as to improve the structural strength of the high-voltage pylon. Finally, the position change in the foundation of high-voltage pylons was monitored for 22 consecutive months. The results show that the maximum settlement of the high-voltage tower foundation is 3.1 m, which is consistent with the actual mining thickness; The high-voltage pylon was stably moved, and the change in transmission line tension and total length was usually less than 1.0%. The combined mining scheme and foundation strengthening scheme can ensure the safe operation of high-voltage pylons and provide a new method for the stability control of ground buildings in coal mining subsidence area.

31 May 2021 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
BZBoyang Zhang
Boyang Zhang
ZLZhibin Lin
Zhibin Lin