Madhav Prasad Nepal

Dr. Madhav Prasad Nepal


Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2017 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
MIMuhammad Saiful Islam
Muhammad Saiful Islam
MNMadhav Prasad Nepal
Madhav Prasad Nepal
MSMartin Skitmore
Martin Skitmore
MAMeghdad Attarzadeh
Meghdad Attarzadeh

16 July 2020 in Architectural Engineering and Design Management
Verified
Journal Article
Closed access
BABehzad Abbasnejad
Behzad Abbasnejad
MNMadhav Prasad Nepal
Madhav Prasad Nepal
AAAlireza Ahankoob
Alireza Ahankoob
ANAraz Nasirian
Araz Nasirian
Robin Michael DrogemullerRobin Michael Drogemuller
Robin Michael Drogemuller
Building Information Modelling (BIM) has gained much attention in recent years, as both a new innovation and methodology. Many architecture, engineering and construction (AEC) firms have reported significant competitive advantages following its implementation. Despite the variety of benefits that BIM offers, its potential has not yet been fully realised. A key reason for this can be located in the difficulties of implementation at the organisational level; a process that demands significant changes in organisational business structure. However, there exists little extensive study on the analysis and synthesis of the literature surrounding organisational BIM implementation. This paper presents a systematic literature review (SLR) on studies from 2004 to July 2019 to allow for a thorough synthesis of the existing BIM literature, innovation management, and information technology domains to identify BIM adoption and implementation enablers. Of the 80 selected studies, 27 enablers were identified to contribute to a more comprehensive utilisation of BIM at the organisational level. These included strategic initiatives, cultural readiness, learning capacity, knowledge capability and IT leveragability, network relationships, process and performance management, and change management practices. The role each implementation enabler has in IT-equipped innovations generally and to BIM implementation specifically is discussed throughout. The results of this paper seek to aid AEC firms in gauging the organisational readiness of the implementation process as well as the required interventions and capability development for successful BIM implementation overall.

1 February 2006 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MNMadhav Prasad Nepal
Madhav Prasad Nepal
종이종직 이
종직 이
BSBosik Son
Bosik Son
Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure—and its causes and effects—are often overlooked when schedule decisions are being made. This paper analyzes the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pre...

1 December 2019 in Expert Systems with Applications
Verified
Journal Article
Closed access
MIMuhammad Saiful Islam
Muhammad Saiful Islam
MNMadhav Prasad Nepal
Madhav Prasad Nepal
MSMartin Skitmore
Martin Skitmore
Golam KabirGolam Kabir
Golam Kabir

23 September 2022 in Energies
Verified
Journal Article
Open access
PDF file
FEI LIFEI LI
FEI LI
Tan YigitcanlarTan Yigitcanlar
Tan Yigitcanlar
MNMadhav Prasad Nepal
Madhav Prasad Nepal
KTKien Nguyen Thanh
Kien Nguyen Thanh
FDFatih Dur
Fatih Dur
Increasingly people, especially those residing in urban areas with the urban heat island effect, are getting exposed to extreme heat due to ongoing global warming. A number of methods have been developed, so far, to assess urban heat vulnerability in different locations across the world concentrating on diverse aspects of these methods. While there is growing literature, thorough review studies that compare, contrast, and help understand the prospects and constraints of urban heat vulnerability assessment methods are scarce. This paper aims to bridge this gap in the literature. A systematic literature review with the preferred reporting items for systematic reviews and meta-analyses (PRISMA) approach is utilized as the methodological approach. PRISMA is an evidence-based minimum set of items for reporting in systematic reviews and meta-analyses. The results are analyzed in three aspects—i.e., indicators and data, modelling approaches, and validation approaches. The main findings disclose that: (a) Three types of indicators are commonly used—i.e., demographic properties and socioeconomic status, health conditions and medical resources, and natural and built environmental factors; (b) Heat vulnerability indexing models, equal weighting method, and principal component analysis are commonly used in modelling and weighting approaches; (c) Statistical regressions and correlation coefficients between heat vulnerability results and adverse health outcomes are commonly used in validation approaches, but the performance varies across studies. This study informs urban policy and generates directions for prospective research and more accurate vulnerability assessment method development.

1 July 2005 in Construction Management and Economics
Verified
Journal Article
Closed access
MDMohammed Fadhil Dulaimi
Mohammed Fadhil Dulaimi
MNMadhav Prasad Nepal
Madhav Prasad Nepal
종이종직 이
종직 이
Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM's role in the construction project as a champion of innovation.