Faris Elgaish

Dr. Faris Elgaish

School of Natural and Built Environment, Queen’s University Belfast, Belfast BT7 1NN, UK

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 August 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
Ahmed KineberAhmed Kineber
Ahmed Kineber
Maxwell Fordjour Antwi-AfariMaxwell Fordjour Antwi-Afari
Maxwell Fordjour Antwi-Afari
Faris ElgaishFaris Elgaish
Faris Elgaish
Ahmad M ZamilAhmad M Zamil
Ahmad M Zamil
MAMohammad Alhusban
Mohammad Alhusban
TQThikryat Jibril Obied Qaralleh
Thikryat Jibril Obied Qaralleh
Accidents are more prevalent in the construction industry compared to other economic sectors. Therefore, understanding the benefits of occupational health and safety management systems (OHSMSs) in terms of their sustainable implementation, management and performance, as well as the awareness of OHMSs and barriers to their implementation, are important for improving OHSMSs in the sustainability of the construction industry. Although there is considerable research on OHSMSs, further assessments are needed concerning other aspects of OHSMSs, particularly the benefits of OHSMSs. Thus, this review paper summarises the empirical state of the art of OHSMS activities. Scopus, Web of Science and other databases were searched using predefined standards. The query was limited to articles published from 1999 to 2023. Consequently, one hundred and four articles were selected and analysed. These articles present analyses of OHSMSs and their potential benefits concerning the implementation of OHSMSs and management, performance, awareness, and barriers in relation to OHSMSs. The results reveal that 12.50% of the reviewed studies assessed the implementation of OHSMSs in the construction industry, and 25.96% studied the management of OHSMSs. Analyses of the performance of OHSMSs in the construction industry accounted for 8.65%, analyses of the awareness of OHSMSs accounted for 4.81%, model-related analyses accounted for 13.46%, studies on the significance/benefits of OHSMSs accounted for 3.85%, studies on the barriers/challenges associated with OHSMSs accounted for 5.77%, analyses on the safety indicators of OHSMSs accounted for 2.88% and other types of studies accounted for 20.19%. This study further reveals that the implementation of OHSMSs is characterised by a dearth of proper communication, the non-utilisation of personal protective equipment (PPE), wrong postures and work activities, a dearth of training, physiological factors including burnout and stress, and a dearth of safety culture and orientation; in addition, matters relating to compliance with effective laws are significant safety challenges in the construction industry. However, the rationality for evaluating the benefits of OHSMSs, comprising their implementation, management and performance, as well as awareness of and barriers to OHSMSs, is challenging to authenticate because appropriate field, survey, organisational and clinical data concerning incident occurrences in the construction industry are lacking for comprehensive evaluations. Thus, this novel study presents our effort to narrow this gap by establishing a framework for increasing our understanding of the benefits of implementing OHSMSs and accident reduction.

15 March 2022 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
LGLina Ghazi Gharaibeh
Lina Ghazi Gharaibeh
KEKristina Eriksson
Kristina Eriksson
BLBjorn Lantz
Bjorn Lantz
SMSandra T. Matarneh
Sandra T. Matarneh
Faris ElgaishFaris Elgaish
Faris Elgaish
Purpose: The wood construction industry has been described as slow in adapting efficiency-increasing activities in its operations and supply chain. The industry is still facing challenges related to digitalization, such as fragmentation, poor traceability and lack of real-time information. This study evaluates the status of digitalization in construction supply chains by thematically analyzing the existing literature and mapping research trends.Design/methodology/approach: A review of the key literature from 2016 to 2021 was performed. The results highlight various technologies and their applications within supply chains and identify research gaps, especially between theoretical frameworks and actual implementation using a scientometric-thematic analysis.Findings: This paper provides a conceptual framework to further aid researchers in exploring the current trends in Supply Chain 4.0 and its applications in the wood construction industry compared to other more advanced industries. Suggested directions for future research in the wood construction Supply Chain 4.0 are outlined.Originality/value: The existing literature still lacks a comprehensive review of the potential of a digitalized supply chain, especially in the construction industry. This framework is pivotal to continue explaining and observing the best ways to accelerate and implement Supply Chain 4.0 practices for digitalized supply chain management (SCM) while focusing specifically on the wood construction industry. The literature review results will help develop a comprehensive framework for future research direction to create a clearer vision of the current state of digitalization in supply chains and focus on the wood construction supply chain, thus, fully achieving the benefits of Supply Chain 4.0 in the wood construction industry.

28 February 2023 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
SMSandra T. Matarneh
Sandra T. Matarneh
Faris ElgaishFaris Elgaish
Faris Elgaish
AAAmani Al-Ghraibah
Amani Al-Ghraibah
EAEssam Abdellatef
Essam Abdellatef
DEDavid John Edwards
David John Edwards
Purpose: Incipient detection of pavement deterioration (such as crack identification) is critical to optimizing road maintenance because it enables preventative steps to be implemented to mitigate damage and possible failure. Traditional visual inspection has been largely superseded by semi-automatic/automatic procedures given significant advancements in image processing. Therefore, there is a need to develop automated tools to detect and classify cracks.Design/methodology/approach: The literature review is employed to evaluate existing attempts to use Hough transform algorithm and highlight issues that should be improved. Then, developing a simple low-cost crack detection method based on the Hough transform algorithm for pavement crack detection and classification.Findings: Analysis results reveal that model accuracy reaches 92.14% for vertical cracks, 93.03% for diagonal cracks and 95.61% for horizontal cracks. The time lapse for detecting the crack type for one image is circa 0.98 s for vertical cracks, 0.79 s for horizontal cracks and 0.83 s for diagonal cracks. Ensuing discourse serves to illustrate the inherent potential of a simple low-cost image processing method in automated pavement crack detection. Moreover, this method provides direct guidance for long-term pavement optimal maintenance decisions.Research limitations/implications: The outcome of this research can help highway agencies to detect and classify cracks accurately for a very long highway without a need for manual inspection, which can significantly minimize cost.Originality/value: Hough transform algorithm was tested in terms of detect and classify a large dataset of highway images, and the accuracy reaches 92.14%, which can be considered as a very accurate percentage regarding automated cracks and distresses classification.

2 August 2024 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
Faris ElgaishFaris Elgaish
Faris Elgaish
SMSandra T. Matarneh
Sandra T. Matarneh
MHM. Reza Hosseini
M. Reza Hosseini
ATAlgan Tezel
Algan Tezel
AMAbdul-Majeed Mahamadu
Abdul-Majeed Mahamadu
FTFirouzeh Taghikhah
Firouzeh Taghikhah
Purpose: Predictive digital twin technology, which amalgamates digital twins (DT), the internet of Things (IoT) and artificial intelligence (AI) for data collection, simulation and predictive purposes, has demonstrated its effectiveness across a wide array of industries. Nonetheless, there is a conspicuous lack of comprehensive research in the built environment domain. This study endeavours to fill this void by exploring and analysing the capabilities of individual technologies to better understand and develop successful integration use cases. Design/methodology/approach: This study uses a mixed literature review approach, which involves using bibliometric techniques as well as thematic and critical assessments of 137 relevant academic papers. Three separate lists were created using the Scopus database, covering AI and IoT, as well as DT, since AI and IoT are crucial in creating predictive DT. Clear criteria were applied to create the three lists, including limiting the results to only Q1 journals and English publications from 2019 to 2023, in order to include the most recent and highest quality publications. The collected data for the three technologies was analysed using the bibliometric package in R Studio. Findings: Findings reveal asymmetric attention to various components of the predictive digital twin’s system. There is a relatively greater body of research on IoT and DT, representing 43 and 47%, respectively. In contrast, direct research on the use of AI for net-zero solutions constitutes only 10%. Similarly, the findings underscore the necessity of integrating these three technologies to develop predictive digital twin solutions for carbon emission prediction. Practical implications: The results indicate that there is a clear need for more case studies investigating the use of large-scale IoT networks to collect carbon data from buildings and construction sites. Furthermore, the development of advanced and precise AI models is imperative for predicting the production of renewable energy sources and the demand for housing. Originality/value: This paper makes a significant contribution to the field by providing a strong theoretical foundation. It also serves as a catalyst for future research within this domain. For practitioners and policymakers, this paper offers a reliable point of reference.

4 November 2021 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
MKManas Khanna
Manas Khanna
Faris ElgaishFaris Elgaish
Faris Elgaish
SMStephen McIlwaine
Stephen McIlwaine
TBTara Tara Brooks
Tara Tara Brooks
Alternative project delivery approaches have been proposed to overcome the inefficiencies of conventional delivery methods such as design-bid-build. Integrated Project Delivery (IPD) has recently emerged as a feasible substitute to traditional project delivery approaches. Despite widespread awareness of the benefits of IPD in integration with information and communication technology (ICT) to enhance the delivery of construction projects, IPD implementation has so far been sluggish in developing countries such as India. The feasibility of implementing IPD approach and applying its principles is investigated in this study. It assesses the maturity of delivery techniques, and the potential benefits and limitations of using IPD for infrastructure projects in developing countries, using India as a case study. This study has been carried out using an in-depth investigation of the literature in combination with a qualitative method involving interviews with ten highly experienced BIM professionals from the Indian AEC sector. The findings of this study have revealed that adopting integrated project delivery while leveraging the BIM process in conjunction with ICT has the potential to effectively deliver mega infrastructure projects in developing countries. The resistance to change, lack of experience and skills, and lack of awareness among project owners are recognized as the primary obstacles to IPD adoption. The main benefits for practice following adoption could include enhanced project delivery, more effective coordination among stakeholders, and greater transparency with cost and time savings through all stages of the project. It is recommended that the regulatory bodies establish governing standards and frameworks, amend regulations to accept IPD concepts, and upskill the workforce through training and knowledge transfer for its successful adoption. One novel aspect of this study may be recognized since most previous research has focused on limitations, benefits, and adoption frameworks for IPD whereas there has been no definitive study on the practicality of IPD combined with BIM and the use of ICT for successful infrastructure project delivery in developing countries. This study contributes to the body of knowledge by serving as an exemplary paper for future studies on the adoption of BIM and ICT approaches such as cloud computing, blockchain, IoT, and mixed realities to deliver projects with integrated project delivery. Furthermore, it provides a deeper understanding of the future of this delivery approach in developing nations.

5 January 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Mohammad MayoufMohammad Mayouf
Mohammad Mayouf
JJJamie Jones
Jamie Jones
Faris ElgaishFaris Elgaish
Faris Elgaish
HEHassan Emam
Hassan Emam
EEE.M.A.C. Ekanayake
E.M.A.C. Ekanayake
IAIlnaz Ashayeri
Ilnaz Ashayeri
Given the heightened importance of revolutionising 4D BIM-based construction scheduling in modular construction, it has become vital to explore how 4D-BIM could be integrated with the lean concept. Therefore, this research aims to develop a lean-integrated process model to revolutionise the 4D BIM-based construction scheduling in modular construction projects. A case study approach was used to obtain the data. The data was obtained using semi-structured interviews with construction scheduling professionals, site observations, and extracts from the BIM model used within the selected case in the UK. Findings showed that conventional (component/object based) 4D BIM supersedes conventional scheduling methods in terms of foreseeing potential implications during design and construction. The findings also showed that lean-integrated 4D BIM in modular construction have different considerations when compared with component/object-based scheduling. A lean-integrated 4D BIM process model was developed from the analysis and it was validated using an interactive workshop with eight participants from two UK construction companies and two modular construction manufacturers. The developed process model identified a number of considerations for 4D BIM in modular projects including constructability, operations, health and safety risks and time. This study suggested the further potential of 4D BIM in scheduling for modular construction projects.