Constructing subways in soft soil strata by shields may cause large displacement of ground and tunnels during and after construction. To evaluate the corresponding short-term and long-term displacement, this paper presented a three-dimensional numerical model based on the project of Suzhou rail transit line S1. This model adopted the modified Cam-clay model to simulate the behavior of soft soil and can consider the grouting parameters and the water leakage of the assembled segment lining. In addition, an on-site monitoring project was implemented, and the field observations were compared with the simulation results. Finally, the sensitivity of key parameters was carried out by the established numerical model. The results indicated that the grouting volume, the thicknesses of soft soil under the tunnel, and the tunnel leakage conditions have a significant impact on the ground and tunnel settlement. Notably, serious tunnel leakage will cause large long-term consolidation settlement, and the increasing thicknesses of soft soil under the tunnel does not increase the long-term settlement of the stratum and the tunnel when the tunnel meets the secondary waterproof requirements, but does increase the corresponding short-term settlement.
25 May 2023 in Tunnelling and Underground Space Technology
Construction of tunnels using a shield in very soft soil may result in serious shield alignment problems and ground settlement. This paper presents a detailed field instrumentation program that was conducted for the construction of the Suzhou Metro Tunnel-Line S1 in China. The characteristics of the shield kinematics in ultra-soft soil and ground responses were examined, and the mechanisms of ground movements and pore water pressure corresponding to shield motions and construction parameters were interpreted and discussed. In addition, a calculation method for ground loss corrected by shield posture was established, based on which a corresponding volume of the grout required was recommended. The results indicated that the shield typically tunnels in very soft soil with increasing inclination mode characterized by a rising tail owing to the floating segment and with a changing inclination mode characterized by a sudden downward movement and subsequent steering of the shield upon encountering hard soil. Consequently, with the uplifting of the shield tail, it was found that the ground heaves and settles with a change in the shield posture. Moreover, a large longitudinal uneven deformation of the lining was found to occur in most of the above situations, while the pore water pressure was minimally affected by the shield posture.
To measure evacuation basic parameters, reveal evacuation performance, and study reasonable staircase spacing of up and down escape staircase in case of fire, an evacuation experiment, which was based on the most unfavorable evacuation scenario, was conducted. The experiment took personnel and vehicles of actual underground road traffic into account, and evacuation process image data were extracted and analyzed by artificial statistics. Experimental results indicate that the personnel plane evacuation speed is between 1.43 and 1.95 m/s, and the upstairs evacuation speed that is less affected by gender and age is mainly between 0.5 and 1.1 m/s; under the escape stairs width of 0.8 m, the average capacity of escape staircase is 0.7 P/s, and the entrance of the staircase is evacuation bottleneck and queuing phenomenon occurs. Based on the experiment, a calculation model of three‐phase personnel net evacuation time was established. By simplifying the evacuation model, a calculation formula of the reasonable escape stair spacing considering the influence of multiple factors was proposed. And the proposed theoretical model was verified by project cases of up and down escape staircase. With 2 min emergency broadcasting time and 6 min Available Safety Evacuation Time of medium‐sized fire as the Personnel Safety Evacuation Rule’s reference, the recommended value of escape staircase spacing of single pipe double‐deck two‐way four‐lane (double pipes double‐deck two‐way eight‐lane) underground roads is 64.3 m.
Shield construction will cause the fluidization of soft soil which is characterized by flow plasticity. This paper presents two theoretical models of soil flow behavior based on a fluid mechanics framework to understand the behavior of soft soil during shield tunneling, especially under the shearing action of the shield skin and the cutting wheel. The characteristics of the flow field are discussed, and their relationships with shield construction parameters such as advancing speed, cutting wheel rotation, applied thrust and torque, and water content are analyzed, while the proposed theory is verified by the results of a numerical simulation. Considering the shear-thinning effect of the soil, a closed four-stage shear path to describe the complete process of the soil behavior during shield tunneling is further interpreted. The results indicate that the sheared region produced by the rotating cutting wheel was larger than that produced by the shield shell shearing and that it was significantly affected by soil properties and tunneling parameters. In addition, it is concluded that the sheared region was significantly expanded due to the shear-thinning effect.