28 January 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXuyang Wang
Xuyang Wang
Dajun YuanDajun Yuan
Dajun Yuan
XWXiaoyu Wang
Xiaoyu Wang
JWJin Wu
Jin Wu
The hydraulic thrust system of the shield machine is used for driving forward and pose adjustment. It is of great significance to figure out the thrust mechanism and motion characteristics of the shield machine to ensure the safety of tunnel excavation. This study aims to develop a model to explore the influence of thrust cylinder advancement on the motions of the shield machine. Firstly, the study carried out mechanism analysis of the thrust mechanism for the shield machine and established a method to describe the position and attitude of the shield machine during the tunneling process by the homogeneous transformation matrix. Then, a new inverse kinematic model was proposed to quantify the relationship between the telescoping movements of cylinders and shield machine motions, and the Jacobian matrix was derived to solve the instantaneous kinematics analysis. Furthermore, a virtual prototype model was developed to simulate the kinematic behavior of the shield machine and validate the accuracy of the kinematic model. The model provides the basic constraint relations for the practical position control system and lays a strong foundation for the dynamic model and automatic trajectory tracking control of shield machines for future studies. Based on the proposed model, the displacement, velocity, and acceleration of cylinders that drive the shield machine to the target motions can be solved exactly. It can provide a reference for the pose control of the shield machine during the practical shield tunneling.

25 December 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XWXiaoyu Wang
Xiaoyu Wang
Dajun YuanDajun Yuan
Dajun Yuan
As the urban underground space environment gets more complex, the cases of shield machines encountering and cutting through piles are becoming more common. The interaction between the cutter head and pile foundation directly affects the tunneling performance of the shield machine and the safety of the existing structure. To study the interaction between the pile and the shield machine, a calculation model of the interaction force is established. A field test of cutting two piles was conducted and the rationality of the model is verified by comparing the calculation results with field test data. The model is applied in the project of a shield machine cutting bridge piles in Harbin Metro Line 3, China. The shield operation parameters are predicted and compared with field test results. Besides, the impacts of cutting surface width and eccentric distance on interaction force are discussed. The study shows that there is a significant interaction between the cutter head and the piles when the shield machine cuts reinforced concrete piles, which causes obvious changes in the shield operation parameters and shield performance. The number of tools that are inside the cutting area has a significant effect on the additional torque. The additional torque fluctuates with the rotation of cutter head and increases with the increase of the number of tools. The number of these tools is determined by factors such as the layout of tools in the cutter head, cutting surface width and eccentric distance, which influence the position of each tool relative to the cutting area. As the cutting distance increase, the additional torque of the cutter head shows a trend of first increasing and then decreasing and reaches the maximum value when the cutting distance reaches the radius of the pile. Besides, the additional force and additional moment of the cutter head increase with the increase of the cutting surface width. The impacts of eccentric distance on additional force and additional moment are complicated. The results in this paper can provide reference for similar engineering.

15 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HJHUI JIN
HUI JIN
Dajun YuanDajun Yuan
Dajun Yuan
Da Long JinDa Long Jin
Da Long Jin
SZShunxin Zhou
Shunxin Zhou
XWXiaoyu Wang
Xiaoyu Wang
Shield construction will cause the fluidization of soft soil which is characterized by flow plasticity. This paper presents two theoretical models of soil flow behavior based on a fluid mechanics framework to understand the behavior of soft soil during shield tunneling, especially under the shearing action of the shield skin and the cutting wheel. The characteristics of the flow field are discussed, and their relationships with shield construction parameters such as advancing speed, cutting wheel rotation, applied thrust and torque, and water content are analyzed, while the proposed theory is verified by the results of a numerical simulation. Considering the shear-thinning effect of the soil, a closed four-stage shear path to describe the complete process of the soil behavior during shield tunneling is further interpreted. The results indicate that the sheared region produced by the rotating cutting wheel was larger than that produced by the shield shell shearing and that it was significantly affected by soil properties and tunneling parameters. In addition, it is concluded that the sheared region was significantly expanded due to the shear-thinning effect.

13 July 2023 in Symmetry
Verified
Journal Article
Open access
PDF file
XWXiaoyu Wang
Xiaoyu Wang
Dajun YuanDajun Yuan
Dajun Yuan
WLweiping LUO
weiping LUO
SZSong Zhang
Song Zhang
HLHuixi Liu
Huixi Liu
As subsea shield tunnels are becoming increasingly popular, especially in coastal or river cities, the complicated construction environment poses multiple challenges that need to be addressed to ensure their safety and reliable operation. This study presents the results of centrifuge model tests that aimed to examine the impacts of navigable channel excavation and seawall construction on the deformation and forces acting on a subsea shield tunnel. The symmetry of the tunnel structure, as well as the loading and unloading effects from channel excavation and seawall construction in this engineering project, allow for the simplification of the problem. The centrifuge test model included a novel device to simulate the unloading action of channel excavation and the loading impact from seawall construction. The structural response of the tunnel was monitored using an innovative solution, and various parameters such as vertical displacement, opening of the circumferential joint, circumferential bending moment, and longitudinal stress were analyzed. The results reveal that both channel excavation and seawall construction have significant effects on the stress and deformation of the pre-existing tunnel. While the excavation of the navigable channel reduces the load on the tunnel from the overlying strata, resulting in uplifts in the tunnel structure around the excavation area, and the construction of the seawall causes settlement of the tunnel near the loading zone. The unloading effect of channel excavation leads to the opening tendency of the tunnel circumferential joints, while the loading effect of seawall construction has the opposite effect on the tunnel circumferential joints. The excavation of the channel induces tensile stresses on the tunnel crown around the loading zone, while the seawall construction causes significant compressive stresses on the tunnel crown around the loading zone. It is crucial to prioritize safety and ensure the tunnel’s load-bearing capacity through careful design and construction considerations in practical engineering. The study can guide the design and construction of future projects and help minimize the risk of damage to pre-existing structures.