Samiullah Sohu

Dr. Samiullah Sohu


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 April 2022 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
SSSamiullah Sohu
Samiullah Sohu
NBNaraindas Bheel
Naraindas Bheel
AJAshfaque Ahmed Jhatial
Ashfaque Ahmed Jhatial
AAAbdul Aziz Ansari
Abdul Aziz Ansari
ISIrfan Ali Shar
Irfan Ali Shar

21 August 2021 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
Naraindas BheelNaraindas Bheel
Naraindas Bheel
SSSamiullah Sohu
Samiullah Sohu
AJAshfaque Ahmed Jhatial
Ashfaque Ahmed Jhatial
NMNafees Ahmed Memon
Nafees Ahmed Memon
AHAneel Kumar Hindu
Aneel Kumar Hindu

5 July 2022 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
AJAshfaque Ahmed Jhatial
Ashfaque Ahmed Jhatial
AHAneel Kumar Hindu
Aneel Kumar Hindu
Naraindas BheelNaraindas Bheel
Naraindas Bheel
SSSamiullah Sohu
Samiullah Sohu
WGWan Inn Goh
Wan Inn Goh

17 October 2020 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Open access
PDF file
AJAshfaque Ahmed Jhatial
Ashfaque Ahmed Jhatial
WGWan Inn Goh
Wan Inn Goh
NMNoridah Mohamad
Noridah Mohamad
Kim Hung MoKim Hung Mo
Kim Hung Mo
SSSamiullah Sohu
Samiullah Sohu
The release of carbon dioxide (CO2) during the production of cement and the increase in waste generation has allowed the construction to focus on sustainability by replacing cement with agricultural waste resources such as Palm Oil Fuel...

22 October 2020 in Periodica Polytechnica Civil Engineering
Verified
Journal Article
Closed access
PDF file
AJAshfaque Ahmed Jhatial
Ashfaque Ahmed Jhatial
WGWan Inn Goh
Wan Inn Goh
SSSamiullah Sohu
Samiullah Sohu
SMSajjad Ali Mangi
Sajjad Ali Mangi
AMAamir Khan mastoi
Aamir Khan mastoi
This study was performed to investigate the thermal and mechanical properties of foamed concrete when supplementary cementitious materials (SCMs) are utilized. Sustainable foamed concrete of 1800 kg/m3 dry density was prepared by incorporating Palm Oil Fuel Ash (POFA) ranging from 30 % to 35 % and Eggshell Powder (ESP) from 5 % to 15 % as SCMs. It was found that the combined utilization of POFA and ESP in the foamed concrete produced favorable results by reducing the thermal conductivity up to 42.68 % compared to the control sample, thus enhanced thermal insulating property of foamed concrete. This study confirmed that recycling and reusing of POFA and ESP are possible in foamed concrete which could be used for non-structural applications where thermal insulating is required.

13 August 2024 in Journal of Advanced Research in Applied Sciences and Engineering Technology
Verified
Journal Article
Open access
PDF file
SHSharafat Hussain
Sharafat Hussain
MHMuhammad Fikri Hasmori
Muhammad Fikri Hasmori
ATali tighnavard
ali tighnavard
MKMuhammad Wajidullah Khan
Muhammad Wajidullah Khan
SSSamiullah Sohu
Samiullah Sohu
Practitioners and scholars express concern about construction projects that are unable to achieve the specified goals or objectives. Therefore, this study sought to identify the factors that impact Key Performance Indicators (KPIs), which are crucial to every successful construction project. Construction performance measurement often uses objective KPIs to quantify project success. Project success is presumed if it is completed on schedule, according to budget, and with the specified quality, known as the “iron triangle.” Subsequently, reviewing relevant literature, crucial KPIs for construction projects were selected. Then, a pilot study finalized the empirical survey questionnaire. The survey was administered to 124 practitioners in the KSA Construction industry, and the response rate was 85%. Employing SPSS version 26, the relative importance index (RII) and mean value were calculated to prioritize. The internal consistency and overall value of the coefficient alpha test were 0.717, and the Kaiser-Meyer-Olkin (KMO) statistics were 0.716 > 0.5, confirming sufficient sample size and further study. The survey determined that respondents placed KPIs in construction projects from 3.802 to 4.387 and RII from 0.877 to 0.760. Most respondents rated "time of project" as the first highest ranking on KSA construction projects, with a mean score of 4.387 and RII of 0.877. The second highest was "cost of project," followed by "quality," "safety," and "sustainable construction." The lowest five ranks were "Defects," "Procurement," "Maintenance," "Human Resource Management," and "Business Performance," with mean scores of 3.802 and RII 0.760. This research adds to the corpus of knowledge on the Saudi Arabian key performance indicators for construction projects.