CHENG-HAN CHUANG

Mr. CHENG-HAN CHUANG

None

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 October 2021 in Energies
Verified
Journal Article
Open access
PDF file
YHYu-Hsiang Hung
Yu-Hsiang Hung
Yi-Wei ChenYi-Wei Chen
Yi-Wei Chen
CHENG-HAN CHUANGCHENG-HAN CHUANG
CHENG-HAN CHUANG
Yuan-Yih HsuYuan-Yih Hsu
Yuan-Yih Hsu
A de-loaded real power control strategy is proposed to decrease the real power output and increase the reactive power output of a grid-connected offshore wind farm in order to improve the voltage profile when the wind farm is subject to a grid fault. A simplified linear model of the wind farm is first derived and a fixed-gain proportional-integral (PI) real power controller is designed based on the pole-zero cancellation method. To improve the dynamic voltage response when the system is subject to a major disturbance such as a three-phase fault in the grid, a self-tuning controller based on particle swarm optimization (PSO) is proposed to adapt the PI controller gains based on the on-line measured system variables. Digital simulations using MATLAB/SIMULINK were performed on an offshore wind farm connected to the power grid in central Taiwan in order to validate the effectiveness of the proposed PSO controller. It is concluded from the simulation results that a better dynamic voltage response can be achieved by the proposed PSO self-tuning controller than the fixed-gain controller when the grid is subject to a three-phase fault. In addition, low voltage ride through (LVRT) requirements of the local utility can be met by the wind farm with the proposed power controller.