The recently issued EN ISO 52016-1 technical standard provides a new simplified dynamic method for the building energy performance assessment. Since an extensive validation of the EN ISO 52016-1 hourly method is still missing, the present work investigates the effect of the main modelling assumptions—related to the heat balance on the outdoor and the indoor envelope surfaces—on the building thermal behaviour. The model validation was carried out by assessing the accuracy variation consequent to the application of the EN ISO 52016-1 modelling assumptions to a detailed dynamic calculation tool (EnergyPlus). To guarantee a general validity of the outcomes, two buildings, two levels of thermal insulation, and two Italian climatic zones were considered, for a total of eight case studies. To explore different applications of the standard method, the analysis was performed both under a free-floating condition—to evaluate the accuracy of the model in predicting the indoor operative temperatures—and to assess the annual energy needs for space heating and cooling. Results show that the assumptions related to the definition of the external convective and the shortwave (solar) radiation heat transfer lead to non-negligible inaccuracies in the EN ISO 52016-1 hourly model.
The EN ISO 52016-1:2018 technical standard has introduced a new simplified dynamic method for the calculation of the building energy need for heating and cooling. This new procedure combines a low amount of input data required, as for the previous quasi-steady and dynamic simplified methods of the withdrawn EN ISO 13790 standard, with an increased accuracy, which would reduce the gap with detailed dynamic methods. This work is part of a broader research activity aimed at investigating the new simplified dynamic model and highlighting its strengths and weaknesses, in terms of accuracy and robustness. Specifically, the work addresses the parameters that have a great influence on the final results and the effects of uncertainties in input data. To this purpose both standard and tailored energy performance assessments have been applied, in particular in the first one a continuous operation period of the space heating system was supposed, and in the second one an intermittent operation system was chosen. A sensitivity analysis was also carried out to quantify the variation of the heating and cooling loads with the set-point temperature, the windows physical properties, the heat capacity and the thermal transmission properties of opaque components, as well as the occupancy related input parameters, such as the internal heat gains and the ventilation flow rate. The analysis was applied to a multi-unit residential building located in Rome and built in the first half of the 20th century. The results outline absolute relevance of the set point temperatures. The significance of occupant behaviour and the importance of the correct definition of the component thermal properties is also pointed out through the comparison between the standard and tailored assessments.
1 August 2024 in Sustainable Energy Technologies and Assessments
One of the strategies proposed by the recently approved version of the Energy Performance of Buildings Directive recast is to provide the Member States with more reliable, accurate, and digitalised Energy Performance Certificates (EPCs), the so-called next-generation or enhanced EPCs. Currently, end-users perceive the EPC as just an administrative obligation for buying or renting a building. The data in the certificates provide limited energy-related information and lack accuracy. Moreover, they cannot account for the continuous changes that occur throughout building lifetime. The overcoming of the EPC limitations is the main objective of the research activity conducted within the framework of Next Generation EPC Horizon2020 cluster. At this regard, the EU-Horizon2020 TIMEPAC project is going to contribute to the enhancement of the entire process of generating, storing, analysing, and exploiting EPCs. The premise is that the building is no longer conceived as a static entity, but as an occupant-centric object, subject to continuous changes. Therefore, the enhanced EPC approach should be holistic, flexible, through-life updatable, and interoperable. In this work, the main methodologies and tools proposed in the TIMEPAC project for the enhancement of the existing EPC schema in terms of EPC generation, exploitation, and data quality are presented and discussed.
The EN ISO 52016-1 standard presents a new simplified dynamic calculation procedure, whose aim is to provide an accurate energy performance assessment without excessively increasing the number of data required. The Italian National Annex to EN ISO 52016-1, currently under development, provides some improvements to the hourly calculation method; despite many works can be found in literature on the hourly model of EN ISO 52016-1, the National Annexes application has not been sufficiently analysed yet. The aim of the present work is to assess the main improvements introduced by the Italian National Annex and to compare the main results, in terms of energy need for space heating and cooling. To this purpose, an existing building representative of the Italian office building stock in Northern Italy was selected as a case study. The energy simulations were carried out considering both continuous and reduced operation of the HVAC systems. The options specified in the Italian National Annex were firstly applied one by one, and then all together. The variation of the energy need compared to the international base procedure is finally quantified. For the premises and the scope above discussed, the present work is intended to enhance the standardisation activity towards the adoption of more accurate and trustable calculation methods of the building energy performance.
An important research issue in assessing the energy performance of buildings concerns the modelling of the interaction between the built environment and the heating/cooling emission systems. Several methods can be used to evaluate the effect of the heating emitter characteristics, including the possible embedment in the building structure, non-uniform space temperature distribution, and the accuracy of the indoor temperature control. Generally, technical standards specify simplified, yet insufficiently validated methods, based on tabulated values. This paper outlines the main simplified procedures for assessing the efficiency of the emission subsystem, with a particular focus on the hydronic systems. It describes the essential datasets required for the analysis and highlights the interaction with phenomena related to the emitter heat loss. The simplified calculation procedures are then methodologically compared with detailed simulation tools, such as EnergyPlus, to identify differences and limitations in the models. The main discrepancies in the procedures and the required input data are highlighted, and possible strategies for improving the simplified methods are presented. A building representative of the European residential building stock is then analysed in the Italian climate using different calculation procedures. The results, in terms of thermal output of the emitter, are then analysed and compared.
In the last years, international technical standards have introduced several procedures for modelling the heat generation sub-system, both providing new calculation methods and updating the old ones. A still open issue concerns the modelling of these sub-systems, by adapting the standard procedure – usually founded on simplified assumptions – to the structure of a detailed dynamic simulation tool. In this paper, the main procedures introduced by the international technical standards issued under the Mandate M/480 EN of 2010 on the heat generation sub-systems are presented, with a focus on combustion systems, chillers, and heat pumps. Simplifications and assumptions are analysed, by pointing out the limits related to the simplified modelling based on empirical correlations and tabulated values. The heat generation standardised models are compared with the ones used in detailed simulation tools, such as EnergyPlus. The main differences in the input data and in the model options are presented, and advices for the completion of the information commonly found in technical data sheets are provided. The paper is aimed both at promoting an effective application of the standards in the building design field and at contributing to the standardisation activity for the achievement of more accurate calculation models.