13 March 2023 in Engineering Management Journal
Verified
Journal Article
Closed access
JLJiaqi LIU
Jiaqi LIU
JLJicai Liu
Jicai Liu
JHJun Hu
Jun Hu
In the public-private partnership (PPP) project, social factors are an important reason that leads to the escalation of commitment (EOC) of investors. Firstly, the study identified ten social factors that influence investor’s EOC in PPP projects by literature review. Then, 126 valid data were collected by situational questionnaire, and regression models of social factors that influence investors’ EOC were built at different stages of project completion. Finally, the study constructed the probability model of the investors’ EOC in different stages. It is found that with the progress of the project, investors are more and more inclined to EOC. In different stages, the social factors that play a major role in the investors’ EOC are different. Probability models based on the influence of social factors have good prediction ability. The findings can help engineering managers predict the risk of investor’s EOC in advance and formulate preventive measures in different stages to promote the success of the project.

16 November 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
JLJiaqi LIU
Jiaqi LIU
HLHaodong Liu
Haodong Liu
DWDongmei Wang
Dongmei Wang
NWNana Wan
Nana Wan
Audits reveal that excessive packaging is a major cause of PPP project stagnation, yet its attributes and dimensions remain unclear. Clarifying these dimensions is critical for mitigating behavioral risks and advancing standardized operations. Applying constructivist grounded theory, the study builds a multidimensional framework for excessive packaging behavior in PPP projects, based on 220 valid samples collected through literature retrieval, web crawling, and interviews, and analyzed via iterative initial, focused, axial, and theoretical coding. Six core dimensions emerge: project expected returns, project entities, contract descriptions, project debt, financing structure, and project nature. The findings further identify two behavioral characteristics: prominent public-private stakeholder heterogeneity and phased differential distribution across the project lifecycle. The study completes the systematic dimension construction of excessive packaging as a behavioral risk, providing a diagnostic basis for the early identification of inflated and distorted project risk sources and for improving PPP risk resilience and governance efficiency.