Xingbing Xie

Dr. Xingbing Xie

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 July 2016 in Pure and Applied Geophysics
Verified
Journal Article
Closed access
PDF file
ZLZhanhui Li
Zhanhui Li
QHQinghua Huang
Qinghua Huang
XXXingbing Xie
Xingbing Xie
XTXingong Tang
Xingong Tang
LCLiao Chang
Liao Chang

14 August 2023 in Minerals
Verified
Journal Article
Open access
PDF file
YXYang Xu
Yang Xu
XXXingbing Xie
Xingbing Xie
LZlei zhou
lei zhou
BXBiao Xi
Biao Xi
Liangjun YanLiangjun Yan
Liangjun Yan
The advantages of the long-offset transient electromagnetic method include deep detection and sensitive response to resistivity anomalies. It is widely used in underground mineral resources exploration, fluid identification in petroleum reservoirs, hydraulic fracturing, and dynamic residual oil and gas monitoring. After the primary field signal is turned off, grounded electrodes or coils are used to observe the secondary eddy field. The secondary field signal decays quickly and has a large dynamic range and a wide frequency band but is easily affected by various natural and human electromagnetic interferences. Therefore, noise reduction and distortion correction are important issues in the processing of transient electromagnetic data. This paper proposes a systematic noise interference suppression process. Multi-period and positive–negative bipolar signal stackings were used to remove random noise and suppress DC offset signals. Then, a time-domain inverse digital recursive method was applied to remove characteristic frequency signals, e.g., power frequency signals and their harmonic interference. A standard noise-free signal was constructed through forward modeling simulation and verified by adding different types of noise. Finally, high-quality transient electromagnetic secondary field attenuation signals were obtained through overlapping windowing technology. We applied this algorithm to obtain electromagnetic data from dynamic monitoring of hydraulic fracturing in Fuling shale gas and from a copper–iron metal mine in Daye City, demonstrating its effectiveness.

8 December 2021 in Remote Sensing
Verified
Journal Article
Open access
PDF file
HCHong Chen
Hong Chen
XXXingbing Xie
Xingbing Xie
ELEnqin Liu
Enqin Liu
LZlei zhou
lei zhou
Liangjun YanLiangjun Yan
Liangjun Yan
As a new green energy source, geothermal resource’s exploration, development, and utilization are an important direction in geophysical exploration at present. In this study, the actual land surface temperature was inferred based on the thermal infrared band of Landsat8 remote-sensing images, and the information about the surface anomalies and their spatial distribution was obtained through a multifactor analysis. In addition, three magnetotelluric sounding profiles were deployed in the study area, and the geo-electric sections in the study area were obtained through inversion of the measured data. Then, based on the inverse geo-electric information and the land surface temperature anomaly information, we analyzed and verified the geothermal resource genesis of the thermal anomaly area and inferred the favorable geothermal resource area in the study area. The results show that these two methods can be used to compare and analyze the possible distribution of the geothermal resources in the study area in two dimensions: the spatial distribution on the surface and the vertical distribution in the subsurface. Moreover, the results of the geothermal anomalies inferred from the thermal infrared remote sensing and the geo-electric results inferred from the magnetotelluric data are in good agreement. This study demonstrates that the integrated application of thermal infrared remote sensing and magnetotelluric technology is a promising tool for geothermal exploration.

31 July 2024 in Minerals
Verified
Journal Article
Open access
PDF file
QGQingming Guo
Qingming Guo
YMYurong Mao
Yurong Mao
Liangjun YanLiangjun Yan
Liangjun Yan
WCWenhui Chen
Wenhui Chen
JYJupeng Yang
Jupeng Yang
李李李昊锦 昊锦 李
李昊锦 昊锦 李
The nonferrous metal mines in China are rapidly depleting due to years of mining, and it has become difficult to identify new mineral resources in the periphery of the old mining area. In order to deal with this situation, advanced technologies and equipment must be deployed. The borehole transient electromagnetic method (TEM) has become a key technology due to its deep investigative capabilities within conductive geological structures. In the present study, in order to meet the exploration needs at depths of less than 3000 m, surface-borehole TEM exploration was used to analyze the characteristics of electromagnetic signals generated by a long wire source and a large loop source, providing essential data for the development of key technologies, such as sensor parameter design and signal gain optimization of the TEM system in the borehole. This study discussed in detail two key technical problems as follows: firstly, the efficient synchronization mechanism between the ground transmitter system and the borehole electromagnetic signal acquisition system ensured the accuracy and timeliness of data acquisition; and secondly, the realization of mass storage technology, which effectively solved the problem of mass storage and real-time transmission of data in a deep borehole environment. The effectiveness of the surface-borehole TEM systems with a long wire source and a large loop source was verified by tests in real mines. The surface-borehole electromagnetic signal acquisition system developed in this study effectively collected electromagnetic signals in the borehole, and the results accurately reflected the stratigraphic information of mineral resources in the study area. This study can pave a new technical path for the exploration of deep and peripheral areas of non-ferrous metal mines and provide valuable experience and insights for mineral resource exploration in similarly complex geological environments.

4 August 2024 in Processes
Verified
Journal Article
Open access
PDF file
XZXiaotian Zhang
Xiaotian Zhang
XXXingbing Xie
Xingbing Xie
With the rapid increase in pipeline mileage in China, the accurate prediction of corrosion issues in in-service pipelines has become crucial for ensuring safe pipeline operation. Traditional pipeline leakage monitoring methods are significantly limited by human factors and equipment precision, making it challenging to predict and identify leakage points accurately. Therefore, aligned with the trend of intelligent pipeline development, this study aims to construct a failure pressure prediction mechanism model for corroded pipelines based on IoT technology. This model leverages intelligent sensing and prediction to assess the safety status of corroded pipeline sections. Ultrasonic phased array technology detects specific corrosion points and detailed defect parameters within pipeline sections. The parameters are then utilized in the Simdroid domestic finite element analysis model to simulate the ultimate burst pressure of the pipeline. A single-variable approach is employed to analyze the sensitivity of different parameters to the pipeline’s ultimate burst pressure, with the minimum burst pressure point of multi-point corroded sections selected as the overall segment failure pressure. Finite element simulation data are integrated into a neural network database to predict the pipeline failure pressure. The real-time operational data of the pipeline are monitored using negative-pressure wave sensing. The operational pressure of the corroded points is compared with the algorithm-predicted failure pressure; if the values approach a critical threshold, an alarm is triggered. Moreover, the remote control terminals evaluate the pipeline’s self-rescue time, providing a buffer for pipeline leakage self-rescue. The failure prediction mechanism model for in-service pipelines was applied to the Fujian–Guangdong branch of the West–East Gas Pipeline III to verify its accuracy and feasibility. The research results offer technical support for the maintenance and emergency repair of pipeline leakage scenarios, leveraging intelligent pipeline technology to reduce costs and increase the efficiency of pipeline operations, thereby supporting the sustainable development of China’s oil and gas pipelines with theoretical and technical backing.

22 November 2023 in Journal of Geophysics and Engineering
Verified
Journal Article
Open access
PDF file
YGYingxing Guo
Yingxing Guo
TZTao Zhu
Tao Zhu
XXXingbing Xie
Xingbing Xie
LZLei Zhou
Lei Zhou
Hydraulic fracturing, a significant contributor to seismic activity within and around operational fields, has been extensively used in shale gas production. Magnetotelluric (MT) sounding is an effective geophysical tool for identifying high-conductivity fluid-filled and/or molten regions. In this study, we deploy a dense grid of rectangular MT sites to investigate the 3D geoelectrical resistivity structure beneath the Weiyuan shale gas block (WSGB) and subsequently examine the causes of seismic activity. The resistivity data, obtained through 3D inversion accounting for topography using ModEM, reveals a shallow low-resistivity layer (<10 Ω-m) within the WSGB, ranging from ∼2 to 5 km in depth. This layer exhibits multiple isolated areas with very low resistivity (<5 Ω-m), indicative of fluid-filled zones associated with hydraulic fracturing or shale gas-bearing formations. In the northwestern WSGB, the Weiyuan anticline presents a high-resistivity dome extending possibly to depths beyond 20 km, without extending beyond the northern boundary of our study area. Conversely, the sedimentary zone in the southeastern WSGB displays a low-resistivity feature, with an extremely low-resistivity center (<1 Ω-m). Since a consistent high-resistivity zone exists beneath each fault and its top depth is <5 km, so faults might not extend downward below 5 km. Earthquakes with magnitudes (ML) of 3.0 or higher predominantly occur close to the faults, when considering industrial production data, we found a noteworthy correlation between earthquakes with ML < 3.0 and annual shale gas production within the WSGB. Tectonic faulting is not the leading cause for ML < 3.0 earthquakes but likely the primary contributor to seismic events with ML ≥ 3.0.