Mohammad Arif Rohman

Dr. Mohammad Arif Rohman


Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2011 in Expert Systems with Applications
Verified
Journal Article
Closed access
AIArazi Idrus
Arazi Idrus
MNMuhd Fadhil Nuruddin
Muhd Fadhil Nuruddin
MRMohammad Arif Rohman
Mohammad Arif Rohman

6 February 2017 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
MRMohammad Arif Rohman
Mohammad Arif Rohman
HDHemanta Doloi
Hemanta Doloi
CHChristopher Heywood
Christopher Heywood
Purpose: While the success of the toll road projects procured through public private partnerships (PPPs) routes are widely confined to the cost, time and quality performance in the delivery context, considerable evidence suggests that such success criteria are not sufficient when the toll road projects are assessed in relation to meeting the long-run community expectations. The purpose of this paper is to examine the key factors associated with the success of the toll road projects from a societal perspective in Indonesia. Design/methodology/approach: Based on the input from 12 experts and a rigorous literature review, a questionnaire survey was designed and a total of 206 respondents from three broad stakeholders’ groups, namely, government, private and end-users’ communities were surveyed to measure the performance of eight toll road projects. The data were primarily analyzed using exploratory factor analysis and reliability test using SPSS Software. Findings: Four significant factors associated with the project social benefit were established as a measure of the overall success criteria in toll road projects. It is expected these can be used as guidance to deliver project social benefit to the community in the overall project lifecycle. Research limitations/implications: This research contributes to the incorporation of social project benefit attributes to the the toll road projects’ success criteria in overall project lifecycle. Practical implications: This study can be used as guidance for the overall stakeholders, such as the government and the project manager to address the current social problems and better navigate the project direction in order to achieve the overall toll road project success in the overall project lifecycles. Social implications: The research highlights how the Indonesian government’s program of developing toll road projects using the PPP procurement routes can be supported for complete social inclusivity by considering the social dimension to achieve long-term success. Originality/value: Identification of the key project social factors based on the data set with a wide representation of the stakeholders has made the research original and unique.

29 March 2022 in Results in Engineering
Verified
Journal Article
Open access
APAvisha Gita Prafitasiwi
Avisha Gita Prafitasiwi
MRMohammad Arif Rohman
Mohammad Arif Rohman
COCitra Satria Ongkowijoyo
Citra Satria Ongkowijoyo

24 May 2019 in International Journal of Construction Management
Verified
Journal Article
Closed access
MRMohammad Arif Rohman
Mohammad Arif Rohman
IWI. Putu Artama Wiguna
I. Putu Artama Wiguna
This study aims to investigate the design performance of Indonesian Public–Private Partnership (PPP) toll roads. A purposive sampling was performed to get stakeholders’ perception comprehensively involved the government, the private sector and the community. A total of 218 samples was collected and analyzed using mean, reliability analysis, ANOVA and posthoc tests. It was found that eight attributes were considered relevant to measure the toll road project design. Meanwhile, the design performance level was considered moderate. Finally, there was no significant difference in perceptions between the government and the private sector regarding the attributes, but there was a difference in perception between the community, the government and the private sector. These findings can help the stakeholders to understand good design application from the community perspective which can be used to improve toll road design performance for delivering a better project social benefit (PSB) to the community.

1 October 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
PKP A Kesuma
P A Kesuma
MRMohammad Arif Rohman
Mohammad Arif Rohman
CPC A Prastyanto
C A Prastyanto
One of the most common problems on roads is traffic congestion caused by problems with heavy vehicles (e.g. trucks, trailers). The consequences of this problem often harm the wider community, both in material and non-material forms such as fuel waste and loss of time. Several previous studies have tried to look for factors that cause traffic congestion, but it has not been able to provide a complete understanding of the root causes and who are the stakeholders who must have an important role in solving this problem. This study aims to develop a research framework to get more better understanding about congestion caused by problems with heavy vehicles, which can be categorized as a type of non-recurrent congestion (NRC) that is dynamic and unpredictable. Risk management prioritizes a proactive approach before an event occurs, so the impact of risk can be minimized. Probability and Impact Matrix techniques are used to determine risk priority. Furthermore, to find the root causes of traffic congestion problems, the Fault Tree Analysis (FTA) method and Social Network Analysis (SNA) are considered to be quite potential to be used to describe complex patterns of relationships among stakeholders. The results of this study are expected to provide more complete information to understand the problem of congestion due to the problem of heavy vehicles, so that a more comprehensive solution can be formulated.

8 September 2021 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
IWI Putu Artama Wiguna
I Putu Artama Wiguna
FRFarida Rachmawati
Farida Rachmawati
MRMohammad Arif Rohman
Mohammad Arif Rohman
LSLarashati B'Tari Setyaning
Larashati B'Tari Setyaning
Purpose: In order to implement Green Supply Chain Management (GSCM to support the effort in reducing the environmental impact of the supply chain processes, a framework needs to be developed. This study aimed to propose a conceptual and holistic GSCM framework to represents a roadmap towards GSCM implementation by integrating all green supply chain practices by various stakeholders of construction sector in Indonesia.Design/methodology/approach: Green practices were obtained from an extensive literature review. Questionnaire survey of GSCM stakeholders in the construction sector was conducted to obtain the preference of green supply chain variables as the proxy for variable weighting and ranking. Pairwise Comparison (PWC) and Technique for Others Preference by Similarity to Ideal (TOPSIS) were adopted to analyze the weight and to rank the green practices respectively. The finding of PWC and TOPSIS were used to develop the framework.Findings: The implementation of the GSCM in the construction sector in Indonesia is mainly focused on reducing the use of hazardous materials, the management of waste at the project site, selling products and components that are no longer used, using video conferencing both inter- and intra-organization meetings, and support from the management level in the form EMS and ISO 14001 certification.Research limitations/implications: This study did not include other GSCM performances as criteria, such as operational and logistical performance.Practical implications: An efficient evaluation technique developed by the framework can be used in decision making policies by policy makers and stakeholders of the organization which can identify and prioritize the green practices for adoption of GSCM in the construction sectorOriginality/value: The originality of this research is that GSCM framework was developed with most relevant green practices based on ranking and weighting criteria as well as the main stakeholders involved.