Farida Rachmawati

Farida Rachmawati

Auto-generated profile, based on publicly available information

Farida Rachmawati

Institut Teknologi Sepuluh Nopember

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 September 2022 in International Journal of Construction Management
Verified
Journal Article
Closed access
FRFarida Rachmawati
Farida Rachmawati
MMMudjahidin Mudjahidin
Mudjahidin Mudjahidin
EWElok Dewi Widowati
Elok Dewi Widowati
Project time and cost are recognized as project performance indicators that change dynamically. However, most performance measurements in construction industry practice remain quantitative and static; yet, construction projects have unique, uncertain, and complex characteristics. The work rate or level of effort is a dynamic factor that influences project time and the cost performance index. As a result, the performance index value fluctuates according to the various factors that influence this value. This research aimed to determine what critical factors influence work rate, which then affects schedule and time performance, and the relationship between them, using system dynamics modeling. The findings from base model simulation, sensitivity analysis, and scenario analysis showed that the resource factors, environmental issues, and management factor variables affected the value of work rate. The scenario phase showed that the highest performance value was from the optimistic scenario model, with 2.35% on CPI and 3.19% on SPI, greater than the base model’s index value. The results of the scenario phase in this research could be used to formulate strategies to obtain optimum construction project performance.

8 September 2021 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
IWI Putu Artama Wiguna
I Putu Artama Wiguna
FRFarida Rachmawati
Farida Rachmawati
MRMohammad Arif Rohman
Mohammad Arif Rohman
LSLarashati B'Tari Setyaning
Larashati B'Tari Setyaning
Purpose: In order to implement Green Supply Chain Management (GSCM to support the effort in reducing the environmental impact of the supply chain processes, a framework needs to be developed. This study aimed to propose a conceptual and holistic GSCM framework to represents a roadmap towards GSCM implementation by integrating all green supply chain practices by various stakeholders of construction sector in Indonesia.Design/methodology/approach: Green practices were obtained from an extensive literature review. Questionnaire survey of GSCM stakeholders in the construction sector was conducted to obtain the preference of green supply chain variables as the proxy for variable weighting and ranking. Pairwise Comparison (PWC) and Technique for Others Preference by Similarity to Ideal (TOPSIS) were adopted to analyze the weight and to rank the green practices respectively. The finding of PWC and TOPSIS were used to develop the framework.Findings: The implementation of the GSCM in the construction sector in Indonesia is mainly focused on reducing the use of hazardous materials, the management of waste at the project site, selling products and components that are no longer used, using video conferencing both inter- and intra-organization meetings, and support from the management level in the form EMS and ISO 14001 certification.Research limitations/implications: This study did not include other GSCM performances as criteria, such as operational and logistical performance.Practical implications: An efficient evaluation technique developed by the framework can be used in decision making policies by policy makers and stakeholders of the organization which can identify and prioritize the green practices for adoption of GSCM in the construction sectorOriginality/value: The originality of this research is that GSCM framework was developed with most relevant green practices based on ranking and weighting criteria as well as the main stakeholders involved.

25 April 2018 in Pacific Rim Property Research Journal
Verified
Journal Article
Closed access
FRFarida Rachmawati
Farida Rachmawati
RSRia Asih Aryani Soemitro
Ria Asih Aryani Soemitro
TATri Joko Wahyu Adi
Tri Joko Wahyu Adi
CSConnie Susilawati
Connie Susilawati
Accessibility to low-cost apartments for migrant workers is a key housing problem in East Java Province, particularly in Surabaya, which results in the housing backlog. Indonesian Ministry government has constructed low-cost apartments in local Government’s asset land and has initiated the housing finance policy to support mortgage loan. However, the existing low-cost apartments are located far from employment centre and there is lack of private sector involvement. As a form of support to the Government’s programme for providing low-cost apartments, the private sector, such as industrial estate, is expected to contribute towards providing such apartments to industrial employees especially migrant workers. A survey of key stakeholders conducted to investigate the specific critical success factors that lead to successful partnerships in low-cost apartment projects. The factor analysis yielded five specific inter-related group factors, namely housing finance policy, government support, stakeholder’s commitment, procurement and community support. Furthermore, the study suggests some recommendations in relation to land availability and adequate housing policy to support the implementation in the future.

31 March 2023 in IPTEK The Journal for Technology and Science
Verified
Journal Article
Open access
PDF file
FRFarida Rachmawati
Farida Rachmawati
HRHerdira Dita Ramadhani
Herdira Dita Ramadhani
ANAulia Shofi Nurhidayah
Aulia Shofi Nurhidayah
Maintenance activities on power plant projects, which are located in remote areas, are prone to risks related to project delay due to the high complexity of work and limited completion time. This research aimed to fill the existing research gap by developing a delay risk assessment of those projects using a probability impact matrix, which is then transformed into a fuzzy set theory. A case study has been undertaken to represent this research topic at three PLTMGs in Nusa Tenggara. The research steps were potential delay risks identification, critical risk assessment, and risk response development. The results show that the critical risks are lack of skilled and experienced manpower, delay in material and equipment delivery, poor communication and coordination between the contractor and the client, unavailability of materials in the local market, and incomplete material received. Several risk responses are provided in this research, such as strengthening the qualification of the job vacancy, having regular training or sharing sessions before the project execution, and having a stock of emergency spare parts in the central warehouse.

1 January 2023 in AIP Conference Proceedings
Verified
Conference Paper
Open access
PDF file
NANofalia Andriyani
Nofalia Andriyani
TATri Joko Wahyu Adi
Tri Joko Wahyu Adi
PSPriyo Suprobo
Priyo Suprobo
WAWimpie A. N. Aspar
Wimpie A. N. Aspar
FRFarida Rachmawati
Farida Rachmawati
MPMulyo Harris Pradono
Mulyo Harris Pradono
The demolition of buildings needs special attention due to the complex, risky planning and implementation processes. The complexity of demolition is caused by v