Yuchen Hu

Ms. Yuchen Hu

School of Civil and Hydraulic Engineering, Ningxia University, Yinchuan 750021, P.R.China.
orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
PDF file
DGDaxin Geng
Daxin Geng
Yuchen HuYuchen Hu
Yuchen Hu
YJYalong Jiang
Yalong Jiang
NWNing Wang
Ning Wang
WHWentao Hu
Wentao Hu
Concrete remains the most commonly used material for lining segments in shield tunnels. Extensive segment floating can easily result in segment dislocation, crack damage, and water leakage. Based on the river-crossing slurry shield tunnel project between Anfeng Station and Dongxin Station of Nanchang, Metro Line 4 (Jiangxi, China), this study addressed the problem of segment floating, which is frequently encountered during the construction of slurry shield tunnels, by theoretically calculating segment floating. In the calculation, the segment floating was divided into two stages: before and after the initial setting of the slurry. First, the stress components of the segment before the initial setting of the slurry were analyzed. The improved Terzaghi loose earth pressure formula, which accounts for the degree of soil arching effect, was adopted to calculate the force of the overlying soil. Then, the mechanical model before the initial setting of the slurry was established and the corresponding theoretical solution was derived. On this basis, the influence coefficient of segment floating before the initial setting of the slurry was proposed. Then, the stress of the segment after the initial setting of the slurry was analyzed, the compression of the overlying soil layer was calculated using the elastic mechanics formula for foundation settlement, and the calculation expression for segment floating after the initial setting of the slurry was obtained. Finally, according to the calculation results for the segment floating theory and segment stress mechanism, targeted antifloating measures were proposed for the follow-up excavation work. The results showed that (1) the buoyancy of the segment calculated in stages is in good agreement with the value measured on-site, that is, when considering the degree of the soil arching effect, the calculated value is closer to the measured average value, thus verifying the feasibility of the calculation model; (2) there are two stages of segment floating, and the amount of segment floating before the initial setting of the slurry is dominant; and (3) the antifloating measures adopted in the subsequent excavation process can ensure the performance quality and safety of segments.

27 January 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Shangrong ZhangShangrong Zhang
Shangrong Zhang
Yuchen HuYuchen Hu
Yuchen Hu
CZChi Zhang
Chi Zhang
Shihao LiShihao Li
Shihao Li
Ping TANPing TAN
Ping TAN
The compositive passive control (CPC) method of “interlayer seismic isolation “plus “shock absorption between adjacent towers” was applied to a multi-tower building (MTB) with a large podium. The interaction between adjacent towers was used to reduce the structural response under seismic action. Based on the Clough–Penzien spectral seismic model, the extended state equation of random response of MTB was derived with the minimum total energy of structural vibration as the optimization control objective. By comparing the seismic scheme and interlayer seismic isolation scheme, the relationship between the control parameters of the connecting control device and the random response of the structure was discussed and analyzed, and the control effect of the composite passive control system under different control schemes was also studied from the perspective of seismic response time history and vibration cumulative energy time history. Through numerical analysis, it was proved that the damping coefficient of the Kelvin-Voigt model has a great influence on the mean square error of total vibration energy while the stiffness coefficient has a poor sensitivity to it. Under the optimization control objective, the connection control device was better arranged at the top of the structure. The control effect can reach 84.64% under the condition of random ground motion as input. The CPC method maintains the advantages of the interlayer seismic isolation scheme and reduces the defect of the response amplification caused by the interlayer isolation, which provides a reference for the follow-up study of the CPC method of MTB.

19 January 2026 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
YZYafei Zhang
Yafei Zhang
NLNing Li
Ning Li
Yuchen HuYuchen Hu
Yuchen Hu
TLTianchang Li
Tianchang Li

4 July 2025 in Engineering Structures
Verified
Journal Article
Closed access
Yuchen HuYuchen Hu
Yuchen Hu
YZYafei Zhang
Yafei Zhang
NLNing Li
Ning Li
TLTianchang Li
Tianchang Li
ZZZihao Zhou
Zihao Zhou

7 November 2016
Verified
Conference Paper
Closed access
ZYZhuting Yao
Zhuting Yao
Yuchen HuYuchen Hu
Yuchen Hu
A ZS-65 gearbox system is as the study object, the gear's characteristic frequency and bearing's characteristic frequency of gearbox are determined based on analysis of the test platform, structure parameters, operating principle, and the layout of measuring point and vibration signals are collected in normal status, tooth wear, and outer ring failure condition, the motor speed is set as 1200r/min, the sampling frequency is 4000Hz, within 1s samples signal are selected and analyzed. The vibration signals are directly demodulated by using cyclostationary demodulation method, and the cyclic spectrum and cycle frequency axis projection are got, and the frequency aliasing phenomena are analyzed. On this basis, by using the local mean decomposition which is based on the signal itself information adaptive decomposition, and resulted PF component has a real physical significance, obtained time-frequency distribution can be clearly and accurately reflect the distribution regularities of signal energy in space various scales. Based on the vibration signal, first LMD decomposition downs to it as individual components' modulated signal, the energy of various components are calculated in addition to the residual value, and normalization processing, wherein the decomposed energy concentrated product functions are proceeded the cyclostationary demodulation, obtained their cyclic spectrum, then the cyclic spectrum are combined and extracted and analyzed slices map in mesh frequency, it inhibits the influence of cross interference items directly uses cyclostationary demodulation, and gets a good result.