Biogenic features such as beaver dams, large wood, and live vegetation are essential to the maintenance of complex stream ecosystems, but these features are largely absent from models of how streams change over time. Many streams have incised because of changing climate or land-use practices. Because incised streams provide limited benefits to biota, they are a common focus of restoration efforts. Contemporary models of long-term change in streams are focused primarily on physical characteristics, and most restoration efforts are also focused on manipulating physical rather than ecological processes. We present an alternative view, that stream restoration is an ecosystem process, and suggest that the recovery of incised streams is largely dependent on the interaction of biogenic structures with physical fluvial processes. In particular, we propose that live vegetation and beaver dams or beaver dam analogues can substantially accelerate the recovery of incised streams and can help create and maintain complex fluvial ecosystems.
Beaver have been referred to as ecosystem engineers because of the large impacts their dam building activities have on the landscape; however, the benefits they may provide to fluvial fish species has been debated. We conducted a watershed-scale experiment to test how increasing beaver dam and colony persistence in a highly degraded incised stream affects the freshwater production of steelhead (Oncorhynchus mykiss). Following the installation of beaver dam analogs (BDAs), we observed significant increases in the density, survival and production of juvenile steelhead without impacting upstream and downstream migrations. The steelhead response occurred as the quantity and complexity of their habitat increased. This study is the first large-scale experiment to quantify the benefits of beavers and BDAs to a fish population and its habitat. Beaver mediated restoration may be a viable and efficient strategy to recover ecosystem function of previously incised streams and to increase the production of imperiled fish populations.
18 March 2013 in Journal of Geophysical Research: Earth Surface
Previous flume‐based research on braided channels has revealed four classic mechanisms that produce braiding: central bar development, chute cutoff, lobe dissection, and transverse bar conversion. The importance of these braiding mechanisms relative to other morphodynamic mechanisms in shaping braided rivers has not yet been investigated in the field. Here we exploit repeat topographic surveys of the braided River Feshie (UK) to explore the morphodynamic signatures of different mechanisms of change in sediment storage. Our results indicate that, when combined, the four classic braiding mechanisms do indeed account for the majority of volumetric change in storage in the study reach (61% total). Chute cutoff, traditionally thought of as an erosional braiding mechanism, appears to be the most common braiding mechanism in the study river, but was more the result of deposition during the construction of diagonal bars than it was the erosion of the chute. Three of the four classic mechanisms appeared to be largely net aggradational in nature, whereas secondary mechanisms (including bank erosion, channel incision, and bar sculpting) were primarily net erosional. Although the role of readily erodible banks in facilitating braiding is often conceptualized, we show that bank erosion is as or more important a mechanism in changes in sediment storage than most of the braiding mechanisms, and is the most important “secondary” mechanism (17% of total change). The results of this study provide one of the first field tests of the relative importance of braiding mechanisms observed in flume settings.