Christino Boyke

Mr. Christino Boyke

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 March 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CBChristino Boyke
Christino Boyke
TNTakashi Nagao
Takashi Nagao
Frame analysis (FA) is known for its efficiency and low computer resource requirements. However, compared to finite element analysis (FEA), the applicability of FA for the seismic performance assessment of pile-supported wharves (PSWs) is limited, particularly in the ability to account for the kinematic force caused by ground displacement during an earthquake. This study aimed to develop a two-dimensional FA method for PSW seismic response analysis that considers a combination of inertial and kinematic forces. We performed FA and FEA and compared the results. First, we targeted the PSW model without considering the soil slope and discussed the spectral acceleration (SA) evaluation method for calculating inertial force. As a result, an equation for estimating a damping coefficient to evaluate the SA in accordance with the PSW width and natural period was proposed. Next, we targeted the PSW model by considering the soil slope and proposed a method to evaluate the kinematic force based on the amount of ground displacement and the soil spring characteristics. The results revealed that using the proposed method, FA, by considering kinematic and inertial forces, could reproduce the bending moments of the piles comparable to those calculated using FEA. Therefore, solely considering the inertial force for a PSW on a soil slope may cause the bending moment to be underestimated.

19 July 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CBChristino Boyke
Christino Boyke
TNTakashi Nagao
Takashi Nagao
Pile-supported wharf (PSW) is one of the primary port structures and is often damaged by earthquakes. To mitigate the risk of seismic damage to a PSW, its seismic performance should be thoroughly assessed. This study aimed to examine the impact of ground displacement on the seismic performance of PSW with a mild soil slope. We performed soil-structure system finite element analysis targeting a wide PSW. The analysis is divided into two scenarios. In the first scenario, the PSW was modeled without regard for the soil slope, whereas the second scenario considered the soil slope. Two waveforms that matched the target spectral acceleration were used to study the effects of the waveform duration on the seismic response of PSW. The analysis results revealed substantial influences of soil slope displacement as well as differences in waveforms on PSW’s seismic performance.

14 February 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CBChristino Boyke
Christino Boyke
ARAfif Navir Refani
Afif Navir Refani
TNTakashi Nagao
Takashi Nagao
In Indonesia, infrastructure, such as port facilities, has been damaged by earthquakes. Therefore, evaluating rational earthquake ground motions (EGMs) for seismic design is necessary to mitigate earthquake disasters in the future. The EGMs in the Indonesian Seismic Code are stipulated based on the ASCE standards and not on site-specific ones. This study aims to propose site-specific EGMs for the seismic design of port facilities in Indonesia. The EGM records and ground data in Indonesia were used for analysis. The EGM incidents in the bedrock were evaluated with deconvolution analysis. The obtained EGMs were amplitude-adjusted to peak ground acceleration similar to that of the EGMs in the bedrock in the Indonesian Seismic Code. A seismic response analysis considering nonlinear soil characteristics was conducted, and 144 EGMs at port sites were obtained. Considering the variation in the obtained EGMs, we propose site-specific EGMs for the seismic design of port facilities. A comparison of the proposed EGMs with those in the design code reveals that the difference between them is significant.

4 February 2025 in The Open Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
MIMudji Irmawan
Mudji Irmawan
CBChristino Boyke
Christino Boyke
KYKohar Yudoprasteyo
Kohar Yudoprasteyo
MRM. Fadhlan Rosyidi
M. Fadhlan Rosyidi
Aim: The research aims to evaluate the efficiency of multi-stage pouring and internal cooling water circulation in mitigating thermal cracking in the Palu Bridge's pile cap and pillar. Using 3D finite element analysis (FEA), it assesses compliance with ACI 301 standards and provides practical guidance for optimizing mass concrete construction based on time and budget constraints. Background: Mass concrete structures, like the pile cap and pillar of the Palu Bridge, face significant risks of thermal cracking due to the heat of cement hydration. Such thermal stress compromises structural integrity, necessitating effective temperature management strategies. Objective: This study aims to analyze and compare the efficiency of two temperature control methods—multi-stage concrete pouring and internal cooling water circulation—in maintaining temperature levels within ACI 301 standards during the construction of the Palu Bridge pile cap and pillar. Methods: A 3D finite element analysis (FEA) was conducted to simulate temperature profiles during concrete hydration. Simulations were validated using a small-scale physical model, and scenarios incorporating staged pouring and cooling pipes were evaluated for compliance with industry temperature thresholds. Results: The staged pouring method resulted in a maximum core temperature of 68.81°C and a differential temperature of 20.93°C while cooling pipes reduced the maximum temperature to 58.69°C with a differential of 13.16°C. Both approaches kept temperature levels below ACI 301 standards, ensuring structural integrity. The physical model closely mirrored the FEA results, validating the methodology. Conclusion: Both temperature control strategies effectively mitigate thermal cracking risks. Staged pouring is cost-efficient but time-intensive, whereas cooling pipes offer faster construction at a higher cost. The selection of methods should consider project budget and timeline constraints.