The availability of sufficient levels of the reactive power within power network is necessary due to control the voltage level, free up transmission lines capacity, prevent from voltage collapse and maintain power systems stability and reliability. So, sufficient levels of the reactive power ask for the presence of an appropriate structure for pricing and clearing of the reactive power in power markets. In this paper, a new clearing method for the Separate Reactive Power Market (SRPM) is presented. The proposed method aims at enhancing the social welfare index, improving the demand-side management, controlling the market power potential and decreasing destructive effects of market players’ collusion, simultaneously. To analyze the performance of the proposed clearing method, different conditions of the power network including the peak load of the network, the presence of private sensitive loads and multilevel tariffs of the demand has been developed. The proposed method is tested on 24-bus IEEE RTS system and is solved by a genetic algorithm (GA) with MATLAB. Also, the non-dominated sorting genetic algorithm (NSGA-II) is used to carry out a comparison with the results of the GA method in similar situations. The results provided by the proposed clearing method is compared to the one in the conventional clearing method to evidence that the proposed market clearing method significantly improves the flexibility of the power market clearing.
Nowadays, finding the optimum locations of energy storage systems (ESS) and distributed energy resources (DER) in a microgrid is very controversial. In this paper, a novel method based on harmony search algorithm (HSA) is proposed to find the optimum locations of ESSs in a specified microgrid. The microgrid has renewable energy resources, and it is connected to the main network. This method will minimize the amount of purchased energy from the main network. Finally, the proposed method will be tested on 37-bus IEEE standard network which has 4 ESSs and capability of using renewable energy resources.
1 January 2023 in International Journal of Engineering
Integration of electric vehicles (EVs) into the power systems has been a concern for distribution system operators due to their impacts on several aspects of power system operation, such as congestion management, power quality, voltage regulation, and peak time changing. In this paper uncertainty parameters such as charging time, traveled distance, and plug-in location of EVs are considered and their effects on the optimal daily operation of microgrids (MG) are discussed. A power system, including geographically-adjacent quasi-independently controlled MGs, each of which has a different operation objective function (OF) is modeled in this paper. A set of socioeconomic OFs i.e. minimum purchase power from the main grid, maximum usage of green power, and minimum Expected Energy Not Supplied (EENS) are considered for each MG which appear in the optimization process with different weights based on the MG policy. The effect of EV integration into the Multi Microgrid System (MMS) is also investigated in this paper and the performance effectiveness of different operation management policies against EV integration is discussed.
9 May 2023 in IET Generation, Transmission & Distribution
Fault indicators (FI) and remotely controlled switches (RCS) can reduce the power outage time in distribution network (DN) by finding and isolating the faulty area. Therefore, they play an important role in reducing the power outage cost and increasing the reliability of the DN. In DN, there may be high‐priority loads. One of the goals of improving and updating the DN is to increase the reliability of all network buses, especially buses feeding such loads. Here, the placement of FI and RCS, as the distribution system automation devices, is designed and modelled to increase the reliability of the buses supplying high‐priority loads. For the placement problem, two goals of cost and reliability have been considered. But the problem is not defined as a multi‐objective optimization. Rather, it is modelled as a one‐objective optimization (i.e. network cost) and constrained to a certain level of reliability in predetermined locations and buses. The IEEE‐33bus network is used as the sample network and different scenarios are simulated. The number of FI and RCS and the optimization cost of simulated scenarios are compared to evaluate the efficiency of the proposed model. The obtained results show the adequacy of the modelling.