The backfilling mining method can effectively solve the environmental and safety problems caused by mining. It is the key technology to realize green mining. Scientific development has accelerated the pace of research on the rational utilization of mine solid waste and improved the research level of backfilling technology. The development history of the backfilling mining method is introduced in the present paper, and it is determined that roof-contacting backfilling is the key technology of mine-solid-waste backfilling mining. This paper introduces three calculation methods of similar roof-contacted backfilling rates. In this paper, the relationship between the characteristics of backfilling slurry made from solid waste from mines and the roof-contacted backfilling rate is systematically analyzed, such as the flow law in stope (gravity gradient), bleeding shrinkage, and natural sedimentation of backfilling slurry. It is pointed out that the characteristics of the stope, such as washing-pipe water, water for the leading way, filling pipeline, and shape of the backfilling stope, are closely related to the roof-contacted backfilling rate. The influential relationship between objective factors, such as human factors, limited auxiliary leveling measures, and backfilling “one-time operation” in the backfilling process, and high-efficiency top filling are considered, and a schematic diagram of the influencing top-filling rate and structure is drawn. At the same time, this paper summarizes the improvement measures of roof connection from three aspects. These include the use of expansive non-shrinkable materials, forced roof-contacted technology, and strengthening management level. It is pointed out that the roof-contacted filling technology is still facing severe challenges, and the research on the backfilling connection technology needs to be strengthened.
With the vigorous development of the world’s mineral resources, the global ecological environment has been severely damaged. The tailings cemented filling technology is an important way to realize the green and low-carbon development of the mining industry. However, sulfur-containing tailings from metal mines can destroy the stability and strength of cemented tailings backfill. Therefore, it is imperative to reduce the harm of the sulfur-containing tailings to the strength of cemented tailings backfill. Firstly, based on the research results of sulfur-containing tailings cemented backfill in recent years, this paper reviews the influence of sulfur-containing tailings on the strength of cemented backfill. Accordingly, the mechanism of strength failure of cemented backfill caused by sulfur-containing tailings is further studied, and the erosion failure of sulfide and sulfate is deeply discussed and analyzed. In addition, three control measures are proposed, including adjusting the combination of filling materials and optimizing the filling ratio, controlling the oxidation conditions in the filling process, and adding ad-mixtures as a supplement. Finally, the main conclusions and outlooks of this review are summarized. The purpose of this review is to provide guidance to improve the strength and durability of the cemented sulfur tailings backfill, effectively treating metal tailings, and to propose some ideas for the further improvement and development of the tailings cemented filling technology.
In order to reduce the excessive vibration responses of a reinforced concrete frame structure induced by several vibrating screens working simultaneously, field vibration monitoring and some vibration reduction measures are carried out. The results of field vibration monitoring show that the maximum vertical vibration of the structure exceeds 106% of the limitation of building vibration. The results of the structural response analysis show that the excessive structural vibration is attributed to the resonance, as the frequency of the vibrating screens coincides with vertical natural frequency of the floors of the factory structure. Based on this fact, three vibration control measures, including damping, active vibration isolation of vibrating screens and structural vibration absorption, are proposed to mitigate the excessive vibration. In order to analyze the vibration control performance of the proposed schemes, the finite element dynamic model of the factory building structure is established, and the model is verified by the results of vibration and mode tests. Then, the damping system, vibration isolation system and vibration absorption system are set up in the models, and the vibration control performance of the three schemes are investigated. The results show that the measures, including vibration isolation and absorption, can reduce the vibration by more than 80%. Combined with the demand for a short construction period, the active vibration isolation of vibrating screens is finally selected. After the implementation of the scheme, the field monitoring data show that the structural vibration response is consistent with the finite element result and obviously weakened to meet the limitation. This study can provide a reference for the vibration control design for similar screening factory buildings.
The tailing paste thickening technology was investigated to achieve goaf reduction treatment and tailing resource utilization of metal mines and reach the effect of controlling two hazards with one waste. However, superfine tailing particles could easily form suspended water-locking flocs in the thickening process, which seriously affected the increase in the underflow concentration in the thickener. Undisturbed compression-stage bed samples were extracted using an in situ sampling method through a continuous dynamic thickening experiment. Then, the morphologies and geometrical structures of micropores were analyzed through high-precision computed tomography scanning. Subsequently, the influences of the shear evolution of pore structure and seepage channel on the dewaterability of underflow slurry were explored by combining Avizo software and 3D reconstruction technology. The thickening and dewatering mechanism of underflow slurry was also revealed. Results showed that under the shear action, the flocs were deformed and compacted, forming a high-concentration underflow. On this basis, the original micropores were extruded, deformed and segmented. Moreover, many loose micropores were formed, the connectivity became poor and the total porosity declined. The diameter of the water-conducting channel in the sample was enlarged because of the shear force and the seepage effect improved. The maximum flow velocity inside the pores was 1.537 μm/s, which was 5.49% higher than that under the non-shear state.
The vibration caused by the tunnel blasting and excavation will harm the surrounding rock and lining structure of the adjacent existing tunnels. This paper takes a two‐lane large‐span highway tunnel as the research object, conducts on‐site monitoring tests on the impact of vibration caused by the blasting and excavation of new tunnels on the existing tunnels under different blasting schemes, and analyses in detail the three‐dimension vibration velocity by different excavation footages. From the vibration speed, it is concluded that the influence of the existing tunnel of the newly built tunnel blasting team is affected by various factors, such as distance, free surface, charge, and blasthole distribution. With different blasting schemes, the greater the amount of charge, the greater the vibration caused by blasting. Existing tunnels correspond to the front of the tunnel, and the axial and radial vibration peaks are greater than the vertical. Although the cut segment uses a less amount of explosive and has a less blasthole layout, there is only one free surface. Because of the clamping of the rock, it is compared with the other two segments. The vibration caused is the largest. Although the peripheral holes are filled with a large amount of explosive, the arrangement of the blast holes is relatively scattered and there are many free surfaces. Hence, the vibration caused is the smallest. Corresponding to the back of the tunnel face, since there is no rock clamp, the vibration caused by the cut segment is the smallest, and the vibration caused by the peripheral segment and the floor segment is relatively large. The vibration caused by the front explosion side is significantly greater than the vibration caused by the back explosion side. The vibration velocity caused by the unit charge of 1.5 m footage is greater than that of the 3.0 m footage. The vibration velocity caused by the unit charge of the cut segment is the largest, and the vibration velocity caused by the peripheral segment and the floor segment is smaller. The research results provide a reference for the blasting control of similar engineering construction.
16 December 2023 in Arabian Journal of Geosciences