Mochamad Agung Wibowo

Mochamad Agung Wibowo


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 September 2018 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
MWMochamad Agung Wibowo
Mochamad Agung Wibowo
NHNaniek Utami Handayani
Naniek Utami Handayani
AMAnita Mustikasari
Anita Mustikasari
Purpose: The objectives of this study are to elaborate on the concepts, dimensions and elements of green supply chain management (GSCM) and develop a framework of GSCM implementation for the construction industryDesign/methodology/approach: This paper presents the findings from a study where experts were asked to contribute their opinions related to GSCM in the construction industry. To develop the model, the Delphi method was used. The objective of this method is to achieve the most reliable consensus in a group of expertsFindings: The research result is a developed framework for GSCM in the construction industry comprising five concepts, 22 dimensions, and 82 elements.Research limitations/implications: The limitation of this research is that its output was the discovered elements, but it did not cover the implementation of this model in construction projects, so some elements may be missing.Practical implications: The output of the research could give new perspective to manage the construction project based on Green Supply Chain Method.Social implications: The stakeholder of the construction project has to learn with this concept (Green Supply Chain) in order to improve construction’s project performance.Originality/value: The originality of this research is that it is a new theme in the area of the construction supply chain. Previous research merely considered the concept of GSCM in construction. Therefore, this research develops an assessment model for performance indicators of GSCM implementation in construction projects.

16 January 2023 in Buildings
Verified
Journal Article
Open access
PDF file
ESEndah Murtiana Sari
Endah Murtiana Sari
AIA.P. Irawan
A.P. Irawan
MWMochamad Agung Wibowo
Mochamad Agung Wibowo
Januar Parlaungan SiregarJanuar Parlaungan Siregar
Januar Parlaungan Siregar
RTRizal Zainuddin Tamin
Rizal Zainuddin Tamin
MDMaya Puspita Dewi
Maya Puspita Dewi
Many projects in Indonesia have implemented new strategies in response to the COVID-19 outbreak. Many projects suffered unexpected losses during the COVID-19 pandemic, and conditions were unpredictable. This situation must be considered by all stakeholders participating in a project. Another problem in the implementation of construction is the fragmentation between project participants. Therefore, a strategy is needed in each phase of the project life cycle. In the absence of proper planning, the contractor is the party responsible for bearing the risk associated with this occurrence. Improved project performance is a shared responsibility among owners, contractors, designers, and subcontractors, all of whom need to tap into their own sources of creativity and innovation. The potential of partnering as a tool for achieving lean construction performance, it is still in its infancy as a means of enhancing project outcomes. In this study, we used qualitative methods and in-depth interviews enhanced by focus group discussions of 14 experts (owners, designers, contractors, and academics) using the Delphi method. The results illustrate the maturity of partnering in integrated project delivery (IPD); therefore, its guiding philosophy can be developed and implemented to improve the outcomes of construction projects in terms of cost, quality, schedule, health and safety, and environmental performance. The most important part of this research is related to the implementation of the 17th goal of the Sustainable Development Goals (SDGs), i.e., partnerships to achieve the goals. This research contributes to a deepening of partnering practices that can drive performance in project implementation.

18 April 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
ABArviga Bigwanto
Arviga Bigwanto
NWNaniek Widayati
Naniek Widayati
MWMochamad Agung Wibowo
Mochamad Agung Wibowo
ESEndah Murtiana Sari
Endah Murtiana Sari
The current state budget allocated for Indonesian government projects has exceeded 10% for infrastructure development. This large budget indicates a need for the construction industry to implement more professional management practices for better cost, time, quality, safety, and environmental impact. Lean construction is used to increase productivity and reduce waste in a project. Therefore, this study aimed to extend lean construction principles to the planning and execution phases of DB projects, where these two entities are integrated into the main contractor. Quantitative and qualitative study methods were used to analyze secondary data from six DB project sites and conduct focus group discussions (FGDs) with expert panels using the Delphi method for consensus. The results showed the factors and variables that influence the implementation of lean construction in government projects in Indonesia.

15 January 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MWMochamad Agung Wibowo
Mochamad Agung Wibowo
NHNaniek Utami Handayani
Naniek Utami Handayani
AMAnita Mustikasari
Anita Mustikasari
SWSherly Ayu Wardani
Sherly Ayu Wardani
BTBenny Tjahjono
Benny Tjahjono
While the performance evaluation of reverse logistics (RL) practices in the construction sector is crucial, it is seemingly limited compared to that in the manufacturing sector. As the project life cycle in the construction sector is typically long, effective coordination among the stakeholders is needed to integrate RL into each phase of the project life cycle. This paper proposes a new model of RL for the construction industry, incorporating the dimensions, elements, and, most importantly, indicators needed for the evaluation of RL performance. The model was initially derived from the extant literature. It was then refined through (1) focus group discussion, by which suggestions pertinent to the proposed model were collated from academics and practitioners, and (2) judgments by academics and practitioners to validate the model. The validated model includes 21 indicators to measure RL performance, spanned throughout the green initiation, green design, green material management, green construction, and green operation and maintenance phases. The paper offers a new method for how RL can be adopted in the construction industry by proposing an innovative model that will benefit stakeholders in the construction industry.

21 December 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ESEndah Murtiana Sari
Endah Murtiana Sari
AIA.P. Irawan
A.P. Irawan
MWMochamad Agung Wibowo
Mochamad Agung Wibowo
Januar Parlaungan SiregarJanuar Parlaungan Siregar
Januar Parlaungan Siregar
APArief Kusuma Among Praja
Arief Kusuma Among Praja
The project delivery system has a large effect in determining the quality of a project. Strategic plans determined by the owner in the project initiation phase must ensure that project performance indicators in the form of cost and quality as well as time are accomplished. A concept of partnering that is well-managed and planned from the initiation phase will determine the quality of the construction project. Increasing the maturity of partnering is needed in order to achieve better project performance indicators. The concept of partnering in integrated and non-integrated projects has a different pattern. This study intends to discuss the concept of partnering and then recommend several key strategies according to the project life cycle. Research this study is quantitative, analyzing secondary data in the form of weekly meetings and project reports with the comparative method and cause-and-effect analysis. The results show that in the phase above 51% of ongoing projects, there is a significant difference in the pattern of partnering between integrated and non-integrated projects. In order to improve deeper partnering, this research reveals several prerequisites that must be met in order to carry out effective partnering in non-integrated projects. This research may benefit owners, contractors, and stakeholders who want to develop their understanding and knowledge of the concepts of partnering and the maturity of partnering, which will be new strategies for developing and improving project delivery systems. This study focuses on a topic from the Sustainable Development Goals (SDGs), specifically partnership for the goal.

15 May 2024 in Buildings
Verified
Journal Article
Open access
PDF file
AFAde Achmad Al Fath
Ade Achmad Al Fath
DHDyah Erny Herwindiaty
Dyah Erny Herwindiaty
MWMochamad Agung Wibowo
Mochamad Agung Wibowo
ESEndah Murtiana Sari
Endah Murtiana Sari
Procurement is the process of obtaining goods and services in a construction project and is a crucial point for the success of a design and build (DB) project. The success of a DB project has an effect on work performance metrics such as cost, quality, and time. Therefore, this research aims to develop a readiness model for implementing sustainable procurement in a DB project with a financing system in the state/regional budget (APBN/APBD). By using previous literature reviews, this research adopted a mixture of qualitative and quantitative methods. Specifically, the qualitative method was conducted using in-depth interviews, and conclusions were drawn using the Delphi method and focus group discussion (FGD). Meanwhile, the quantitative method was used to analyze secondary data from the current DB project in order to examine sustainable procurement. The projects examined were spread across the country and had a value of at least 100 billion. Consequently, the results showed that various factors influenced sustainable procurement in the DB management project. In addition, this research impacted better procurement management in the DB project based on APBN/APBD funding, thereby increasing project productivity and innovation, as well as other beneficial values to stakeholders. Typically, the result could be used as a readiness model for implementing sustainable procurement in a DB project with APBN/APBD funding schemes, serving as a guide for construction management in the future and being useful for decision making on government projects.