Synthetic Natural Gas (SNG) is the most researched option for a Power-to-Fuel pathway in Germany after hydrogen, having the advantage of being compatible with the existing infrastructure. However, it is not clear under which conditions SNG is economically and environmentally advantageous compared to natural gas usage, since this is determined by a complex interplay of many factors. This study analyzes the technical, economic and environmental aspects of a pilot SNG plant to determine the key parameters for profitable and sustainable operation. The SNG plant was simulated in Aspen Plus® with CO2 from biogas production as a feedstock and with hydrogen provided by a 1 MWel electrolyzer unit. A life cycle analysis (LCA) was undertaken considering several impact categories with a special focus on global warming potential (GWP). An SNG cost of 0.33–4.22 €/kWhth was calculated, depending on factors such as operational hours, electricity price and type of electrolyzer. It was found that the CO2 price has a negligible effect on the SNG cost, while the electricity is the main cost driver. This shows that significant cost reductions will be needed for SNG to be competitive with natural gas. For the investigated scenarios, a CO2 tax of at least 1442 €/t was determined, calling for more drastic measures. Considering the global warming potential, only an operation with an emission factor of electricity below 121 g CO2-eq/kWhel leads to a reduction in emissions. This demonstrates that unless renewable energies are implemented at a much higher rate than predicted, no sustainable SNG production before 2050 will be possible in Germany.
Fluoroelastomer (FKM) and perfluoroelastomer (FFKM) O-rings are to be employed for the construction of a gate valve in a solar thermochemical water-splitting reactor for hydrogen production. To assess the O-rings’ sealing performance during the first stage of the gate valve’s closing process, the compressive response of the materials under the applied gate forces is determined. An accelerated ageing program at 200, 225 and 250 °C for FKM and 250, 275 and 300 °C for FFKM is performed on compressed O-rings and non-compressed O-ring segments for up to 14 days. The aged O-rings’ sealing performance at low forces, and hence at low compressive strain, is evaluated by conducting leakage rate tests in vacuum using a newly developed test stand. Experimental results provide for the tested O-rings data of a minimum compression necessary to guarantee efficient sealing at different thermo-oxidative ageing levels. To investigate the materials’ degradation extent, weight loss measurements are performed on the exposed O-ring segments. In all cases, cumulative weight loss increases with longer exposure times and higher temperatures, while the weight loss rate decreases with exposure time.