In normal and hazardous situations, critical infrastructure systems such as roads, bridges, electricity, gas, and waste treatment facilities play a very crucial role in sustaining communities and industries. It is thus very important to examine the functional and structural stability of these supporting infrastructure systems. An assessment analyzing the criticality of infrastructure systems should be performed before impact of facing extreme events, such as hurricanes, floods, and earthquakes. The criticality assessment involves using a decision support system that incorporates vulnerability and severity assessments to provide emergency agencies and experts, relevant information that will facilitate an enhanced disaster mitigation response. This paper introduces the criticality assessment based on the interrelationships between the critical infrastructure systems, associated industries, and communities. The social, economic, and technical data of the 2008 Midwest floods were collected through int...
1 January 2021 in Journal of Management in Engineering
In the Integrated Project Delivery (IPD) approach, partner selection, contract signing as well as the signing of participants’ task scope, and the setting of incentive plans usually take place before the design of a project has been completed. This brings risks and uncertainties to project management. To overcome these challenges, the proposed framework for risk sharing strategies in IPD projects should consider four levels that interact in the system: (1) risks in goal achievement (such as cost overruns); (2) risks that occur during the project management process; (3) the incentive mechanism; and (4) participants’ decisions. In the study described in this paper, the interaction of the participants’ decision-making in situations of risk and the factors affecting the interaction were identified and modeled for IPD projects. The equilibria were calculated using game theory, and simulations were carried out to showcase the interaction process and the factors that influence participants’ decision-making and project performance. An epidemic model, network analysis, and regression analysis were also used for the simulation and analysis of risk propagation on the risk network. Furthermore, strategies to improve project performance and mitigate risk propagation were developed. In theory, this paper fills the gaps in previous research and proposes an approach for further research on risk sharing practices in IPD projects. The findings are also helpful to practitioners of IPD projects for risk analysis, partner selection, team building, setting of incentive mechanisms, and handling of project risks.
This research proposes a data-driven approach to identify possible disparities in a utility’s outage management practices. The approach has been illustrated for an Investor-Owned Utility located in the Midwest region in the U.S. Power outage data for approximately 5 years between March 2017 and January 2022 was collected for 36 ZIP/postal codes located within the utility’s service territory. The collected data was used to calculate the total number of outages, customers affected, and the duration of outages during those 5 years for each ZIP code. Next, each variable was normalized with respect to the population density of the ZIP code. After normalizing, a K-means clustering algorithm was implemented that created five clusters out of those 36 ZIP codes. The difference in the outage parameters was found to be statistically significant. This indicated differential experience with power outages in different ZIP codes. Next, three Generalized Linear Models were developed to test if the presence of critical facilities such as hospitals, 911 centers, and fire stations, as socioeconomic and demographic characteristics of the ZIP codes, can explain their differential experience with the power outage. It was found that the annual duration of outages is lower in the ZIP codes where critical facilities are located. On the other hand, ZIP codes with lower median household income have experienced more power outages, i.e., higher outage counts in those 5 years. Lastly, the ZIP codes with a higher percentage of the White population have experienced more severe outages that have affected more customers.
This paper presents the data that is used in the article entitled "A Multi-Hazard Approach to Assess Severe Weather-Induced Major Power Outage Risks in the U.S." (Mukherjee et al., 2018) [1]. The data described in this article pertains to the major outages witnessed by different states in the continental U.S. during January 2000-July 2016. As defined by the Department of Energy, the major outages refer to those that impacted atleast 50,000 customers or caused an unplanned firm load loss of atleast 300 MW. Besides major outage data, this article also presents data on geographical location of the outages, date and time of the outages, regional climatic information, land-use characteristics, electricity consumption patterns and economic characteristics of the states affected by the outages. This dataset can be used to identify and analyze the historical trends and patterns of the major outages and identify and assess the risk predictors associated with sustained power outages in the continental U.S. as described in Mukherjee et al. [1].
1 March 2016 in Journal of Management in Engineering
The complex dynamics inherent to the context of decision-making in the construction industry requires more rigorous application of analytics. However, effective frameworks to facilitate such data-driven decision-making are noticeably lacking in the construction industry. To address this lack, the Purdue Index for Construction (Pi-C) is introduced in this paper as a collaborative effort to facilitate and promote data-driven decision-making in the construction industry. As a preliminary step, a hierarchical definition for health of the construction industry is explored based on the results of a literature review, survey, and interviews. The developed hierarchical definition is then used to propose a framework to benchmark, interpret, and analyze data associated with the status of the health of the industry. The proposed framework is tested with existing publicly-available data to explore its effectiveness in improving decisions made in the form of policies or strategies. The research results highlig...
1 April 2018 in Journal of Construction Engineering and Management
Intelligent compaction (IC) is an emerging technology that can be applied to improve the compaction of hot mix asphalt (HMA). This study investigated the applicability of IC technology for the quality control (QC) and/or quality assurance (QA) of HMA compaction through a survey, phone interviews, and a review of IC demonstrations conducted in Indiana. The questionnaire survey gathered information about (1) the field usage of IC technology by state DOTs, (2) the benefits of IC technology, and (3) future plans for IC implementation. Only two state DOTs have adopted IC technology for QC, whereas the other 24 respondents have not applied IC technology for either QC or QA. A review of IC demonstrations conducted on US 52 in Indiana was undertaken to explore the possibility of substituting the nonnuclear density value with the ICMV. Multiple regression analysis of the data (predicted variable: nonnuclear density) indicated a value of 0.67 with statistically significant p-values for the independent variables [i.e., pass count, temperature, and intelligent compaction measurement values (ICMV)]. The results of this research indicate that IC technology would improve both the compaction coverage and the uniform compaction for HMA QC applications, although no solid evidence is available to date to support the possibility of substituting core density values with ICMVs for QA.