Building Information Modeling (BIM) offers significant opportunities for construction management as it provides an effective method for design and documentation, supports communication and collaboration, and enhances the most important factors of a project (time, cost, and quality). The aim of this study is to investigate the barriers to BIM implementation at AEC (architecture, management, construction, and quantity survey) companies in Jordan, and to look at the similarities and differences in perceptions on the significance of these barriers between respondents from different AEC companies. To accomplish these objectives, a questionnaire survey was created to gather feedback on the 20 major barriers to BIM implementation identified through a comprehensive literature review. The top significant barriers were identified using the Relative Importance Index (RII) and Mean value; and to assess variances between respondents in the four AEC firms, a one-way analysis of variance (ANOVA) was used. From this, it was concluded that the “cost of training”, “cost of BIM software”, “insufficient BIM technical knowledge and awareness”, “lack of adequate BIM guidelines”, and “huge BIM up frontal investment” are the key barriers affecting the BIM implementation in Jordanian AEC companies. Considering this, this study provides an important step towards better understanding the implementation of BIM in Jordan.
25 June 2009 in Environmental Geochemistry and Health
Full and reliable rainfall data are required for hydrological modelling, integrated water resource management, and planning. However, these data suffer from record gaps and sparse rain gage distribution, which implies that the use of an imputation method is crucial. This study aims to compare the outputs from 10 imputation methods that were used to infill missing rainfall depth data (MRD) in an arid Mediterranean region. Different statistical tests were used to assess the outputs from the imputation methods. The results showed that for MRD ranges between 5 and 20% the stepwise multiple linear regression (MLRsw) method was valid and produced the best results with a root‐mean‐square error (RSME) and mean absolute error (MAE) of less than 7 and 2 mm, respectively. This was followed by the Monte Carlo Markov chain expectation–maximization‐based multiple imputation (MI‐MCMC) method, which had an RSME and MAE of 1.01 and 0.08 mm, respectively, at 20% MRD. On the other hand, the use of satellite data for imputation (LR_GPCC estimates) was appropriate for MRD ranging between 10 and 15%, while the statistical and spatial method was suitable for MRD of less than 5%.