Esraa Yaseen Hyarat

Dr. Esraa Yaseen Hyarat

Department of Allied Engineering Sciences, Hashemite University, Zarqa, Jordan
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 January 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Esraa Yaseen HyaratEsraa Yaseen Hyarat
Esraa Yaseen Hyarat
THTasneem Hyarat
Tasneem Hyarat
MKMustafa Al Kuisi
Mustafa Al Kuisi
Building Information Modeling (BIM) offers significant opportunities for construction management as it provides an effective method for design and documentation, supports communication and collaboration, and enhances the most important factors of a project (time, cost, and quality). The aim of this study is to investigate the barriers to BIM implementation at AEC (architecture, management, construction, and quantity survey) companies in Jordan, and to look at the similarities and differences in perceptions on the significance of these barriers between respondents from different AEC companies. To accomplish these objectives, a questionnaire survey was created to gather feedback on the 20 major barriers to BIM implementation identified through a comprehensive literature review. The top significant barriers were identified using the Relative Importance Index (RII) and Mean value; and to assess variances between respondents in the four AEC firms, a one-way analysis of variance (ANOVA) was used. From this, it was concluded that the “cost of training”, “cost of BIM software”, “insufficient BIM technical knowledge and awareness”, “lack of adequate BIM guidelines”, and “huge BIM up frontal investment” are the key barriers affecting the BIM implementation in Jordanian AEC companies. Considering this, this study provides an important step towards better understanding the implementation of BIM in Jordan.

21 February 2024 in Ain Shams Engineering Journal
Verified
Journal Article
Open access
Esraa Yaseen HyaratEsraa Yaseen Hyarat
Esraa Yaseen Hyarat
LMLaura Montalbán-Domingo
Laura Montalbán-Domingo
EPEugenio Pellicer
Eugenio Pellicer

1 January 2023 in Journal of Applied Engineering Science
Verified
Journal Article
Open access
PDF file
MMMais Mukattash
Mais Mukattash
Esraa Yaseen HyaratEsraa Yaseen Hyarat
Esraa Yaseen Hyarat
Construction projects have significant impacts on the environment. They adversely affect many areas, such as energy consumption, global warming and resource depletion. Green buildings have been found to be the most effective way to reduce these impacts. As a developing country with limited resources, Jordan is giving too much prominence to sustainability in construction projects. However, moving forward with Green Building Projects (GBPs) is a great challenge. Most managers do not have much experience in managing these projects yet. They are not fully aware of the importance of project management factors which can significantly affect the delivery process of GBPs. Research addressing these factors has become a crucial need in the construction industry. The main objective of this study is to identify the major project management factors required to deliver GBPs successfully in Jordan. The questionnaire was distributed to determine the significance of nineteen project management factors and SPSS software was utilized to perform the data analysis. The results show that for GBPs in Jordan to be successfully delivered, there must be clear lines of communication during the design and planning stages. The study concludes with recommendations for improving GBP distribution in Jordan. A further detailed study is needed to investigate and improve communication channels in GBPs. The practical implications of this study are to help the stakeholders in the construction industry understand management activities in the green building industry in a better and more realistic way. In addition, identifying these factors will help control future projects and ensure correct decisions are made from the beginning of the project to maximize the project's success.

6 December 2025 in Heliyon
Verified
Journal Article
Open access
Esraa Yaseen HyaratEsraa Yaseen Hyarat
Esraa Yaseen Hyarat
Laura Montalbán-DomingoLaura Montalbán-Domingo
Laura Montalbán-Domingo
EPEugenio Pellicer
Eugenio Pellicer

22 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
Esraa Yaseen HyaratEsraa Yaseen Hyarat
Esraa Yaseen Hyarat
Laura Montalbán-DomingoLaura Montalbán-Domingo
Laura Montalbán-Domingo
NMNoelia Molinero-Pérez
Noelia Molinero-Pérez
EPEugenio Pellicer
Eugenio Pellicer
Lean Construction (LC) aims to enhance efficiency, minimize waste, and increase value in construction. However, its implementation is inconsistent, especially in developing countries like Jordan, due to a lack of assessment frameworks. This study examines the Lean Construction Knowledge Framework (LCKF) to assess LC capability in Jordan’s construction sector. A qualitative multiple-case study was conducted with three selected construction companies in Jordan, using semi-structured interviews and direct observation. A three-point scoring system evaluated 12 LCKF variables across three knowledge dimensions based on evidence from interviews, observations, and documents. This exploratory study found that most LCKF variables were partially implemented or absent. Effective stakeholder communication was strong, while flow tracking, visual management, and Key Performance Indicators (KPIs) were descriptive and not improvement-oriented. Deficits included a lack of formal training in waste reduction, visualization, and pull-based control, as well as inconsistent adoption of pull planning. A cross-case analysis confirmed shared gaps among the companies, indicating broader challenges in similar contexts. Based on the scoring results and follow-up interviews feedback, the LCKF was translated into a Jordan-specific roadmap that distinguishes between established practices, short-term enhancements, and long-term capability development. The study contributes by highlighting that LC implementation depends on tool adoption, organizational routines, learning mechanisms, and staged capability building.