Muhammad Usman Hassan

Dr. Muhammad Usman Hassan

School of Civil and Environmental Engineering, National Univeristy of Sciences and Technology, H 12, Islamabad, Pakistan
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 January 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MZMuhammad Umer Zubair
Muhammad Umer Zubair
MAMubashir Ali
Mubashir Ali
MKMuhammad Arsalan Khan
Muhammad Arsalan Khan
AKAdil Khan
Adil Khan
MHMuhammad Usman Hassan
Muhammad Usman Hassan
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
The world is progressing towards sustainable, eco-friendly, recyclable materials to enhance the circular economy and mitigate the issues of carbon footprint, overburdened landfills, and waste of natural resources. As increasing greenhouse gas (GHG) emissions are a major contributor towards climate change and given that the construction industry is one of the major producers of GHG emissions, it is crucial to meticulously quantify and lower its emissions, especially in the context of developing countries. This research presents a novel framework by combining advanced tools i.e., building information modeling (BIM), life-cycle assessment (LCA), geographic information systems (GISs), and quantification of embodied emissions to optimize construction’s design, material-selection, operations, maintenance, and waste-management processes. The effectiveness of the proposed approach has been demonstrated with the help of a real-world case study in Islamabad, Pakistan. A building model has been generated using BIM, and a comprehensive LCA has been conducted. Additionally, GIS tools have been utilized to identify the locations and accessibility of available-waste-management facilities. Based on this data, embodied emissions related to handling and transportation of waste material to disposal facilities have been computed using mathematical analyses. Furthermore, targeted mitigation strategies have been proposed and an optimized route has been designed using GIS-based route-optimization tools along the suggested facility centers in the Islamabad region. The case study has been reassessed with alleviation strategies, and the results show that 29.35% of the materialization stage, 16.04% of the operational stage, and 21.14% of the end-of-life-phase GHG emissions can be effectively reduced. Hence, pre-evaluating the environmental degradation caused by construction projects throughout their life cycle might offer an opportunity to comprehend and reduce prospective environmental impacts.

18 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
QMQurratulain Malik
Qurratulain Malik
ANAbdur Rehman Nasir
Abdur Rehman Nasir
RMRabiah Muhammad
Rabiah Muhammad
Muhammad Jamaluddin ThaheemMuhammad Jamaluddin Thaheem
Muhammad Jamaluddin Thaheem
Fahim UllahFahim Ullah
Fahim Ullah
MHMuhammad Usman Hassan
Muhammad Usman Hassan
Building Information Modeling (BIM) is recognized as one of the most significant technological breakthroughs in the Architecture, Engineering, and Construction (AEC) industry. The pace of implementation of BIM in AEC has increased during the past decade with an enhanced focus on sustainable construction. However, BIM implementation lags its potential because of several factors such as readiness issues, lack of previous experience in BIM, and lack of market demand for BIM. To evaluate and solve these issues, understanding the current BIM implementation in construction organizations is required. Motivated by this need, the main objective of this study is to propose a tool for the measurement of BIM implementation levels within an organization. Various sets of indexes are developed based on their pertinent Critical Success Factors (CSFs). A detailed literature review followed by a questionnaire survey involving 99 respondents is conducted, and results are analyzed to formulate a BIMp-Chart to calculate and visualize the BIM implementation level of an organization. Subsequently, the applicability of the BIMp-Chart is assessed by comparing and analyzing datasets of four organizations from different regions, including Qatar, Portugal, and Egypt, and a multinational organization to develop a global measurement tool. Through measuring and comparing BIM implementation levels, the BIMp-Chart can help the practitioners identify the implementation areas in an organization for proper BIM implementation. This study helps understand the fundamental elements of BIM implementation and provides a decision support system for construction organizations to devise proper strategies for the effectual management of the BIM implementation process.

4 April 2024 in Buildings
Verified
Journal Article
Open access
PDF file
FHFilzah Hashmi
Filzah Hashmi
MHMuhammad Usman Hassan
Muhammad Usman Hassan
MZMuhammad Umer Zubair
Muhammad Umer Zubair
KAKhursheed Ahmed
Khursheed Ahmed
TATaha Aziz
Taha Aziz
Rafiq M. ChoudhryRafiq M. Choudhry
Rafiq M. Choudhry
One in every five occupational deaths occurs in the construction sector. A proactive approach for improving on-site safety is identifying and analyzing accident precursors, such as near-misses, that provide early warnings of accidents. Despite the importance of near-misses, they are frequently left unreported and unrecorded in the construction sector. The adoption of modern technologies can prevent accidents by automated data collection and analysis. This study aims to develop near-miss detection metrics to facilitate the automated detection of near-misses through sensors. The study adopted a mixed method approach including both qualitative and quantitative approaches. First, a quantifiable definition of near-misses was developed from the literature. Hazards, accidents, and the causes of accidents were identified. Through empirical and statistical analyses of accidents from the OSHA repository, combinations of unsafe acts and conditions responsible for a near-miss were identified. The identified factors were analyzed using a frequency analysis, correlation, and a lambda analysis. The results revealed twelve significant near-misses, such as A1—approach to restricted areas and C2—unguarded floor/roof openings, A5—equipment and tool inspection was incomplete and C8—unsafely positioned ladders and scaffolds, A2—no or improper use of PPE and C2—unguarded floor or roof openings, etc. Lastly, measurable data required by sensors for autonomous detection of near-misses were determined. The developed metric set the basis for automating near-miss reporting and documentation using modern sensing technology to improve construction safety. This study contributes to improving construction safety by addressing the underreporting of near-miss events. Overall, the developed metrics lay the groundwork for enhancing construction safety through automated near-miss reporting and documentation. Furthermore, it helps for the establishment of safety management schemes in the construction industry, specifically in identifying near-misses. This research offers valuable insight into developing guidelines for safety managers to improve near-miss reporting and detection on construction sites. In sum, the findings can be valuable for other industries also looking to establish or assess their own safety management systems.

14 July 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
MZMuhammad Umer Zubair
Muhammad Umer Zubair
MKMuhammad Abbas Khan
Muhammad Abbas Khan
MHMuhammad Usman Hassan
Muhammad Usman Hassan
KAKhursheed Ahmed
Khursheed Ahmed
TATaha Aziz
Taha Aziz
Students are rapidly losing interest in STEM education due to the minimal incorporation of media into learning and the complexity of teaching methods, which ultimately results in a lack of motivation. However, despite these challenges, incorporating active learning methods in STEM can ultimately reignite students’ interest in STEM education. This paper reports a case study presenting the effects of simulation games on enhancing the learning experiences of civil engineering students through an intervention method. It develops a framework for enhancing learning through game-based learning. Intervention included the following two groups: a control group exposed to conventional teaching methods and an experimental group introduced to the simulation game. Following the learning sessions, a survey was conducted to gauge students’ perceptions about the proposed framework. Results indicated a strong positive response from students toward the game-based learning approach. They expressed satisfaction with its effectiveness in improving their understanding. Independent t-tests found that the mean score (4.13) for entertainment via the game exceeded that of traditional teaching methods (3.72). Furthermore, 85% of students acknowledged the game’s utility in reinforcing civil engineering concepts, compared to 67% for traditional methods. Many students suggested expanding the game to cover a wider range of topics in future versions to enable a more comprehensive learning experience.

1 May 2023 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
GSGhanim Saqib
Ghanim Saqib
MHMuhammad Usman Hassan
Muhammad Usman Hassan
MZMuhammad Umer Zubair
Muhammad Umer Zubair
Rafiq M. ChoudhryRafiq M. Choudhry
Rafiq M. Choudhry

15 May 2024 in Infrastructures
Verified
Journal Article
Open access
PDF file
HHHabib Talha Hashmi
Habib Talha Hashmi
SUSameer Ud-Din
Sameer Ud-Din
MKMuhammad Asif Khan
Muhammad Asif Khan
JKJamal Ahmed Khan
Jamal Ahmed Khan
MAMuhammad Arshad
Muhammad Arshad
MHMuhammad Usman Hassan
Muhammad Usman Hassan
Global urbanization and increasing traffic volume have intensified traffic congestion throughout transportation infrastructure, particularly at toll plazas, highlighting the critical need to implement proactive transportation infrastructure solutions. Traditional toll plaza management approaches, often relying on manual interventions, suffer from inefficiencies that fail to adapt to dynamic traffic flow and are unable to produce preemptive control strategies, resulting in prolonged queues, extended travel times, and adverse environmental effects. This study proposes a proactive traffic control strategy using advanced technologies to combat toll plaza congestion and optimize traffic management. The approach involves deep learning convolutional neural network models (YOLOv7–Deep SORT) for vehicle counting and an extended short-term memory model for short-term arrival rate prediction. When projected arrival rates exceed a threshold, the strategy proactively activates variable speed limits (VSLs) and ramp metering (RM) strategies during peak hours. The novelty of this study lies in its predictive and adaptive capabilities, ensuring efficient traffic flow management. Validated through a case study at Ravi Toll Plaza Lahore using PTV VISSIMv7, the proposed method reduces queue length by 57% and vehicle delays by 47% while cutting fuel consumption and pollutant emissions by 28.4% and 34%, respectively. Additionally, by identifying the limitations of conventional approaches, this study presents a novel framework alongside the proposed strategy to bridge the gap between theory and practice, making it easier for toll plaza operators and transportation authorities to adopt and benefit from advanced traffic management techniques. Ultimately, this study underscores the importance of integrated and proactive traffic control strategies in enhancing traffic management, minimizing congestion, and fostering a more sustainable transportation system.