Waqas Arshad Tanoli

Dr. Waqas Arshad Tanoli

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 June 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ASAbubakar Sharafat
Abubakar Sharafat
Muhammad Shoaib KhanMuhammad Shoaib Khan
Muhammad Shoaib Khan
KLKamran Latif
Kamran Latif
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
Wonyoung ParkWonyoung Park
Wonyoung Park
Jongwon SeoJongwon Seo
Jongwon Seo
Underground utilities are important assets that provide basic services for society’s daily life. They are generally very complex and remain unnoticed until they fail due to any particular reason. The stakeholders involved in the design, construction, and maintenance of utility infrastructure face many problems due to the traditional underground utility management system, resulting in injuries, loss of life, disruptions, project delays, and financial loss. The problem with the traditional system is that it uses 2D drawings and keeps unreliable information or a lack of updated information, which makes it an inefficient utility management system. With the advancement in construction information technology, we can address this effectively by integrating BIM and GIS. In this paper, a novel integrated BIM-GIS framework for underground utility management systems was developed on the basis of IFC to CityGML mapping. It provides an effective underground utility management system that facilitates designers in optimization of the design, assists in the excavator’s operator by providing real-time three-dimensional spatial information during the construction process, and acts as an as-built information database for utility facility management. For validation, a real-time project case study indicated that the proposed system can effectively provide comprehensive underground utility information at different project stages.

29 January 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MZMuhammad Umer Zubair
Muhammad Umer Zubair
MAMubashir Ali
Mubashir Ali
MKMuhammad Arsalan Khan
Muhammad Arsalan Khan
AKAdil Khan
Adil Khan
MHMuhammad Usman Hassan
Muhammad Usman Hassan
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
The world is progressing towards sustainable, eco-friendly, recyclable materials to enhance the circular economy and mitigate the issues of carbon footprint, overburdened landfills, and waste of natural resources. As increasing greenhouse gas (GHG) emissions are a major contributor towards climate change and given that the construction industry is one of the major producers of GHG emissions, it is crucial to meticulously quantify and lower its emissions, especially in the context of developing countries. This research presents a novel framework by combining advanced tools i.e., building information modeling (BIM), life-cycle assessment (LCA), geographic information systems (GISs), and quantification of embodied emissions to optimize construction’s design, material-selection, operations, maintenance, and waste-management processes. The effectiveness of the proposed approach has been demonstrated with the help of a real-world case study in Islamabad, Pakistan. A building model has been generated using BIM, and a comprehensive LCA has been conducted. Additionally, GIS tools have been utilized to identify the locations and accessibility of available-waste-management facilities. Based on this data, embodied emissions related to handling and transportation of waste material to disposal facilities have been computed using mathematical analyses. Furthermore, targeted mitigation strategies have been proposed and an optimized route has been designed using GIS-based route-optimization tools along the suggested facility centers in the Islamabad region. The case study has been reassessed with alleviation strategies, and the results show that 29.35% of the materialization stage, 16.04% of the operational stage, and 21.14% of the end-of-life-phase GHG emissions can be effectively reduced. Hence, pre-evaluating the environmental degradation caused by construction projects throughout their life cycle might offer an opportunity to comprehend and reduce prospective environmental impacts.

18 April 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ASAbubakar Sharafat
Abubakar Sharafat
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
MZMuhammad Umer Zubair
Muhammad Umer Zubair
KMKhwaja Mateen Mazher
Khwaja Mateen Mazher
With rapid urbanization, the utilization of underground space has become an important part of infrastructure. However, the stability of underground spaces such as large caverns remains a key challenge in civil engineering throughout the lifecycle of a project. Traditional methods of stability assessment rely on static models and periodic monitoring and often fail to capture real-time changes in rock behavior, leading to potential safety risks and, in severe cases, even the collapse of underground infrastructure. To address this challenge, this study introduces a digital twin (DT) framework to improve stability assessments and monitor deformations in underground structures. The framework enables the continuous monitoring and adaptive optimization of rock support systems by combining real-time sensor data with virtual simulations. A five-dimensional DT framework comprises physical objects, virtual objects, service systems, DT data, and their interconnections. It incorporates six key modules, which are structure, geology, material, behavior, performance, and environment, to enhance the understanding of cavern stability. The framework is based on Industry Foundation Classes standards to ensure seamless data exchange, interoperability, and the standardized representation of geotechnical and structural data. A seven-step methodology is developed for this framework, encompassing geological assessment, virtual modeling, Building Information Modeling (BIM)-based design, construction processes, real-time monitoring, and optimization strategies. To evaluate its effectiveness, the framework is applied to a case study, demonstrating improvements in deformation monitoring and rock support efficiency. The findings highlight the potential of integrating DT with BIM to enhance safety, reliability, and long-term stability in underground construction projects.

11 August 2025 in Buildings
Verified
Journal Article
Open access
PDF file
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
UAUllah Abid
Ullah Abid
ASAbubakar Sharafat
Abubakar Sharafat
Esam Mohamed IsmaeilEsam Mohamed Ismaeil
Esam Mohamed Ismaeil
The construction of large underground caverns fundamentally differs from building and above ground civil infrastructure projects due to their complex geometries and variable geological conditions. These projects are complex and challenging because a large amount of data is generated from dispersed, independent, and heterogeneous sources. The underground construction industry often uses traditional project management techniques to manage complex interactions between these data sources that are hardly linked, and independent decisions are often made without considering all the relevant aspects. In this context, cavern construction exhibits uncertainties and risks due to unforeseen circumstances, an intricate design, and ineffective information management. Existing research has considered general BIM semantic models at the design stage; however, the digital transformation of cavern construction remains underdeveloped and fails to integrate digital construction throughout the project lifecycle. To address that gap, a novel BIM-based multi-model cavern information modeling framework is presented here to improve project management, construction, and delivery by integrating multiple interlinked data models and project performance data for large underground cavern construction. Data models of cavern construction processes are linked to propose an extension of the Industry Foundation Classes (IFC) schema based on the cavern-specific elements, relationships, and property set definitions. To illustrate the potential of the proposed framework, a theoretical application to the powerhouse cavern construction is presented. The results indicate that the framework has significant potential to improve construction efficiency and safety and establish a robust foundation for the digital transformation of underground cavern projects. The theoretical implementation on the Neelum–Jhelum powerhouse cavern showed that the framework enabled a 92 m cavern realignment to avoid fault zones, achieved a 12.4% reduction in rock bolt usage, and a 9.8% reduction in shotcrete volume. These quantitative improvements illustrate its potential to enhance safety, reduce material costs, and optimize construction efficiency compared to conventional workflows.

1 January 2024 in Advances in Civil Engineering
Verified
Journal Article
Open access
QWQazi Muhammad Waleed
Qazi Muhammad Waleed
Rai Waqas AzfarRai Waqas Azfar
Rai Waqas Azfar
ASAbubakar Sharafat
Abubakar Sharafat
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
MZMuhammad Umer Zubair
Muhammad Umer Zubair
HQHisham Jahangir Qureshi
Hisham Jahangir Qureshi
Designing and modeling tunnels are a complex and labor‐intensive process, exacerbated by the involvement of multiple designers and software applications to accommodate diverse geometric and subsurface conditions. This often results in reduced efficiency, productivity, and increased potential for errors. To address these challenges, the authors implemented a strategy integrating building information modeling and mathematical relationships governing tunnel geometries and rock support elements. Using Autodesk Revit, they developed a prototype that allows designers to model tunnels aligned with ground conditions without reliance on multiple software applications. This streamlined approach enhances productivity, simplifies complexities, and improves accuracy in tunnel design and review processes, including quantity take‐offs. A case study comparing the prototype with conventional methods demonstrated significant improvements in efficiency, productivity, and design accuracy. This research offers practical benefits to stakeholders in tunnel projects, optimizing work quality, and outcomes in tunnel design and construction.

13 February 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ASAbubakar Sharafat
Abubakar Sharafat
WTWaqas Arshad Tanoli
Waqas Arshad Tanoli
YSYoo Sung-hoon
Yoo Sung-hoon
Jongwon SeoJongwon Seo
Jongwon Seo
With the rapid advancement in information technology, the digital twin and smart assembly process simulation have become an integral part of the design and manufacturing of high-precision products. However, conventional Tunnel Boring Machine (TBM) cutterhead design and on-site assembly planning remain largely experience-driven and fragmented, with limited interoperability between geological characterization, structural verification, and constructability validation. This study proposes a digital twin-driven framework for TBM cutterhead design optimization and assembly process simulation that integrates geology-aware design inputs, BIM-based information modelling, FEM-based structural assessment, and immersive virtual environments within a unified virtual–physical workflow. To ensure consistent data exchange across platforms, an IFC4.3-compliant ontology is established using a non-intrusive property-set (Pset) extension strategy to represent cutterhead components, geological parameters, FEM load cases/results, and assembly tasks. Tunnel-scale stress analysis and cutter–rock interaction modelling are used to define project-representative cutter loading envelopes, which are mapped to a high-fidelity cutterhead FEM model for iterative structural refinement. The optimized configuration is then transferred to a game-engine/VR environment to support full-scale design inspection and assembly rehearsal, followed by manufacturing and field deployment with bidirectional feedback. To validate the proposed framework, an implementation case study of a deep hard-rock tunnelling project is presented where five design iterations were tracked across BIM–FEM–VR and nine constructability issues detected and resolved prior to assembly. The results indicate that the proposed digital twin approach strengthens traceability from geology to loading to structural response, reduces localized stress concentration at critical interfaces, and improves assembly readiness for complex tunnelling projects.