To control the problem of coal wall spalling in large mining height working faces subject to mining, considering the Duanwang Mine 150505 fully mechanized working face, the mechanism of coal wall spalling in working faces was investigated by theoretical analysis, numerical simulation and field experiment. Based on analysis of coal wall spalling in the working face, a new grouting material was developed. The stress and plastic zone changes affecting the coal wall, before and after grouting in the working face, were analyzed using numerical simulation and surrounding rock grouting reinforcement technology was proposed for application around the new grouting material. The results showed that: (1) serious spalling of the 150505 working face was caused by the large mining height, fault influence and low roof strength, and (2) the new nano-composite low temperature polymer materials used have characteristics of rapid reaction, low polymerization temperature, adjustable setting time, high strength and environmental protection. Based on analysis of the working face coal wall spalling problem, grouting reinforcement technology based on new materials was proposed. Industrial tests were carried out on the working face. Field monitoring showed that the stability of the working face coal wall was significantly enhanced and that rib spalling was significantly improved after comprehensive anti-rib-spalling grouting measures were adopted. These results provide a basis for rib spalling control of working faces under similar conditions.
22 September 2025 in International Journal of Coal Science & Technology
To explore the influence of stress space rotation on roadway stability, this study establishes Cartesian and principal stress axes, obtains principal stress characteristic parameters and direction cosine matrix, and determines the conversion process between coordinate axes. By breaking through the traditional plane strain mechanics model, a full plane strain model of rectangular roadway considering the deflection effect of principal stress axis is established. The analytical solution of stress complex variation of any element around the roadway is derived, and the calculation method of plastic zone is given. The influence of stress deflection on the stress of roadway and the shape distribution of plastic zone is discussed and the control system of roadway under the action of principal stress deflection in spatial region is established. The research results show that: (1) the shear stress and normal stress formed in the remote of the roadway during the stress rotation are in the same order of magnitude, and the plastic quantitative calculation of the roadway cannot simply consider the normal stress. (2) Stress deflection causes the distribution of stress and plastic zone around the roadway to show ‘asymmetric’ failure characteristics, and the transient deflection of stress may cause the rapid expansion of the plastic zone of the roadway. (3) The distribution characteristics of plastic zone calculated by this study are compared with the deformation and failure feature and peep results of the return air roadway in Cuncaota Mine, and the comparison results are good. The supporting system and technology of roadway under the action of principal stress deflection in space area are put forward, and the field application effect is good.
During the mining process of fully-mechanized caving faces, the roof of the roadway behind the working face easily forms an arched-shape hanging roof structure with the working face pushed forward, which results in potential hazards such as gas accumulation and large-scale roof collapse. Based on the actual situation of a hanging roof at a difficult caving end in fully-mechanized top coal caving faces, through borehole exploration, surrounding rock displacement observation, bolt stress monitoring, theoretical formula calculation, and numerical simulation methods, the structure characteristics of the hanging roof at the end of the fully-mechanized caving face are studied. The ultimate failure depth and ultimate break distance of the hanging roof structure at the end of the working face are obtained, and its formation mechanism is analyzed. It is concluded that the hanging structure is formed by the following reasons: the lithology of sandy mudstone and fine sandstone above the top coal of the roadway is strong; the hanging roof structure is less affected by working-face mining; there is a result of insufficient rotary pressure of the upper mudstone while working together with the protective coal pillar and end support the caving step distance of the curved hanging roof structure is 10~13.55 m.
22 September 2025 in Rock Mechanics and Rock Engineering
The original rock stress field is mainly divided into the σHZ-dominant stress field, the σZ-dominant stress field, and the σH-dominant stress field. Via theoretical analysis, the plastic zone morphology and the orientation of roadway surrounding rock under a three-dimensional stress field are studied in depth, and the theory is verified by numerical simulation. The results show that in the σHZ-dominant stress field, the plastic failure mode changes from elliptical to quasi-circular to butterfly, and the optimized angle range of the roadway orientation is determined by three principal stresses. In the σZ-dominant stress field, the shape of the plastic zone transforms from butterfly to ellipse, the optimized angle range of the roadway orientation is 50–90°, and the butterfly hidden danger zone is in the 0–50° range. In the σH-dominated stress field, the shape of the plastic zone transits from ellipse to butterfly. The optimized angle range of the roadway orientation is 0–40°, and 50–90° is the butterfly hidden danger zone.
About Me
Zijun Han is mainly engaged in mine pressure control research.
Zijun Han is mainly engaged in mine pressure control research.